Rome Resources Plc · LSE:RMR
Rome Resources — AJ Bell Share Spotlight (July 2025)
15 slides from Rome Resources's conference presentation, Jul 15, 2025
Slide 1: Highly Strategic Critical Minerals Play
1 HIGHLY STRATEGIC CRITICAL MINERALS PLAY COMPLETING SECOND PHASE RESOURCE DRILLING ON HIGH GRADE TIN, COPPER AND ZINC MINERALISATION S H A R E S P O T L I G H T | 1 5 J U LY 2 0 2 5 | L S E : R M R . L October 2024 1
Slide 2: Disclaimer
2 Disclaimer NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN The contents of this presentation have not been approved by any person for the purposes of section PART, IN OR INTO THE UNITED STATES, CANADA, AUSTRALIA OR JAPAN, OR ANY OTHER 21 of the Financial Servic
Slide 3: 2024/25 Milestones
3 2024/25 Milestones Pathfinder Minerals successfully Commenced Drilling Programme on the completed RTO of Rome Resources in July Bisie North Tin Project in August 2025 2024 Drilled 26 core holes to date, a total of Admitted to AIM raising £4mm before over 5,000m expenses Over 200m wide mineralisati
Slide 4: Experienced Team with strong DRC Track Record
4 Experienced Team with strong DRC Track Record Klaus Eckhof Paul Barrett Mark Gasson Jamie Anderson Non-Executive Chairman C.E.O. C.O.O. Exploration Manager Mr. Eckhof is a geologist with more Mr Barrett is a geologist with over 40 Mr Gasson is a geologist with over 39 Mr Anderson is a DRC-based ge
Slide 5: Tin Market Dynamics
Tin Market Dynamics 5 A Thoroughly Modern Metal • Massachusetts Institute of Technology in 2018 identified tin as the metal most likely to be positively impacted by the growth of electrification, including solar energy, EV’s and advanced computing. Demand Side Growth • Global demand for tin is predi
Slide 6: Our Main Secondary Commodity – Cu
Our Main Secondary Commodity – Cu 6 Copper and Tin both performing well in H1 2025… Copper Always in the Spotlight • Recent price surges due to the unpredictability of the US administration has led to gains in copper prices and looming shortages in the key US market Long Term Demand Growth • Copper
Slide 7: Project Location
7 Project Location Kabali Gold Project Located in Eastern DRC ROME PROJECT Two main prospects – Mont Agoma (Sn, Alphamin Tin (Mpama) Cu, Zn, Ag) and Kalayi (Sn) Operating with Heli support Permanent Field Camp fully serviced 8km from Alphamin Tin Mine and Airstrip Alphamin highest grade tin in the w
Slide 8: Operations
8 Operations Three active drilling units on site Core handling facility on-site: includes logging, sampling, XRF analyses Samples shipped out via Kisangani to Lubumbashi (sample preparation) and Johannesburg (analysis) Operating with Heli support Limited drilling and soil sampling planned to follow
Slide 9: 2025 Forward Programme – Mont Agoma
9 2025 Forward Programme – Mont Agoma Assessing extent of New Tin Zone to the northeast Mont Agoma demonstrating significant tin, copper and zinc mineralisation in a large polymetallic zone Section shows large prospective area undrilled at depth Feed new drilling assays into Maiden Resource work for
Slide 10: Mont Agoma – polymetallic deposit | Relative Values
Mont Agoma – polymetallic deposit | Relative Values 10 Relative Values of the Mont Agoma Polymetallic Phases Commodity Sn Cu Zn Relative Abundance 1 7 50 Commodity Price, $/t 33,000 10,000 2,700 Relative Value 33 70 135 For Illustration Purposes only – based on in-house estimates – to be confirmed b
Slide 11: Kalayi Prospect – Pure Tin
Kalayi Prospect – Pure Tin 11 Core area well-defined – high grade tin Drilling covered 600m of a 2km tin-in-soil anomaly Tin mineralisation in high grade plunging shoots Similar to Alphamin’s Mpama South – currently 2% tin Tin Grades, % Maiden tin resource model nearing completion Upside in soil ano
Slide 12: Forward Programme
12 Forward Programme Consistently Strong Newsflow through the next 4 months Currently Drilling a follow-up programme on Mont Agoma (estimated completion July 2025) Additional short programme in September (contingent on results) Maiden Resource Estimate planned for September
Slide 13: Summary
Summary 13 2024 a transformational year for the Tin has a strong forward demand curve, Company critical in the E-transition £8.2m raised before expenses Large amounts of copper and zinc in the Drilling programme successfully undertaken system on tin and copper project in DRC Copper has strong long t
Slide 14: Q&A
Q&A 14
Slide 15: Appendix – Financial Analysis
Appendix – Financial Analysis 15 Use of Funds - Post RTO 16% 1,240 49% 16% 1,190 3,710 1,500 20% Project Spend RTO Transaction expenditure Corporate and Admin expenditure Cash remaining