  2. Slide 2: In this presentation

    In this presentation Introduction to Indian Power Market Product Portfolio Trading Mechanism Market snapshot Participation Volume Price Trade @ IEX

  3. Slide 3: Installed Capacity of India

    Installed Capacity of India (Figures in GW) State Private Central All India 368 103 172.2 92.8 368.3 356 344 29.5% 46.2% 24.3% 100% 327 86 298 69 78 57 268 39 243 32 44 45 45 45 223 29 43 7 7 7 200 41 6 7 26 25 28 26 26 41 6 26 24 39 5 24 132 39 5 23 5 21 8 20 35 197 201 205 4 185 192 15 165 130 145

  4. Slide 4: Power Supply situation in the Country

    Power Supply situation in the Country Installed Capacity Energy Available Peak Met Year (at the end of FY) (Excluding RE Gen.) ( MW ) (MW) (MU) 2011-12 1,99,877 1,16,191 8,57,886 2012-13 2,23,344 1,23,294 9,11,209 2013-14 2,43,029 1,29,815 9,59,829 2014-15 2,67,367 1,41,160 10,30,785 2015-16 2,98,06

  5. Slide 5: Indian Power Market Development trend

    Indian Power Market Development trend Spot trading OTC on Exchanges Markets Multi Buyer/Seller Single buyer/seller Improved liquidity and Efficiency

  6. Slide 6: Growing share of Short-term market

    Growing share of Short-term market FY 2009 FY 2019* Long Term PPA for over 25 years through long term 93.86% 88.3% Short-Term 6.1% 11.7% Exchanges 0.4% 4.0% Through traders 3.2% 4.1% Direct Bilateral 0.5% 1.5% Unscheduled Interchange 2.1% 2.0% Source: Percentage as per CERC Report on Short Term Powe

  7. Slide 7: IEX Market Segments

    IEX Market Segments Day-Ahead • Delivery for next day Market • Price discovery: Closed , Double-sided Auction since June,08 Intraday Market & Day- • Intraday: For Delivery within the same day Ahead Contingency • Day Ahead Contingency: Another window for next day Round the clock since Jul’15 • Gate c

  8. Slide 8: Company Snapshot

    Company Snapshot 97.5% Market Share 5500+ MW average daily trade 6000+ Participants 4100+ Industries 70+ Commercial 50+ Discoms 500+ Conventional Generators 1500+ RE Participants Transparency Liquidity Market Share-FY 19 (DAM+TAM) Competition Average Daily Trade- FY19(DAM) Participation-as 29th Febr

  9. Slide 9: What benefits does the power exchange provide?

    What benefits does the power exchange provide? Nation-wide voluntary access Delivery Based E-trading contracts No counterparty Robust Platform risk

  10. Slide 10: IEX Volume Growth: Strong trend line

    IEX Volume Growth : Strong trend line 60,000 Electricity Volume 52,241 50,000 46,214 Cleared Volume (MU) 40,576 40,000 34,397 29,270 28,363 30,000 22,811 20,000 14,415 12,712 10,000 6,214 2,616 0 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 FY18 FY 19 Source: IEX Data (DAM+TAM) FY 09: from

  11. Slide 11: Product Portfolio

    Intra Day REC Product Portfolio

  12. Slide 12: Product Segments

    Product Segments Trade for the following day Day Ahead Market (DAM) Contracts for every 15 min, closed auction From 3 Hrs ahead to •Intraday Term Ahead 11 days in advance •Day Ahead Contingency •Daily Market (TAM) 4 types of contracts •Weekly Trade green attributes of electricity Renewable Energy Ce

  13. Slide 13: Contract Characteristics

    Contract Characteristics TERM AHEAD MARKET Contract Day Ahead Intraday Day Ahead Daily Weekly Characteristic Market Contracts Contingency Contracts Contracts 0400-2400 Hrs From 2nd day to Delivery Next day For next day For next week same day next 10 days Continuous Continuous Continuous Auction Type

  14. Slide 14: DAM and TAM Trading Timeline

    QlEs INDIAN ENERGY EXCHANGE DAM and TAM Trading Timeline 23:30 Hrs 00:30 Hrs 10:00 Hrs 12:00Hrs = 15:00 Hrs 16:00 Hrs 20:30 Hrs Market Close Day-Ahead Contingency Continuous Trading

  15. Slide 15: Trading Mechanism

    Trading Mechanism

  16. Slide 16: Features of Day Ahead Market

    Features of Day Ahead Market A closed double-sided anonymous auction for each 15-min time block for the following day N1 N3 The intersection between the aggregated sale and purchase curves defines the market clearing N2 N2 A2 price (MCP) A1 E1 W1 W3 13 Bid area defined W2 E2 Congestion Management th

  17. Slide 17: Understanding exchange mechanism

    Understanding exchange mechanism Bidding and Matching Risk Management Congestion Management Treatment of losses and charges

  18. Slide 18: DAM trading process

    DAM trading process Review corridor Bidding Matching and funds Result Confirmation Scheduling availability 10:00 am to 12:00 pm to 1:00 pm to 3:00 pm 5:30 pm 6:00 pm 12:00 pm 1:00 pm 2:00 pm Bids for MCP Corridor Final ACV Collective Final 15- min &MCV availability and ACP transaction Schedule sent

  19. Slide 19: Bid Types

    Bid Types • Bids for each 15 min • Relational Block Bid can be entered for any 15 min • Varying price and • Mother or child bid quantum pairs • No circular links • Allow partial execution • No partial execution Single/Portfolio Block Bid Bid

  20. Slide 20: DAM-Single Bid

    AIEX SF town ENERGY EXCHANGE | Fle Contr! OAM View Tools Window Helo ae => .4 BA in O @& Single BID Deivery Oste: [Tapa aoa [>] Asset =) Participant: = x [pe ED po - SS) Te) | (eo area:~ [REIT =) Pentoso: = [- IO} ) Cee) (sem) | 4 1 2 3 6 7 8 9 10 a a Bb “4 5 16 v 18s“ LS SS A SR 00:30 - 00-45 50050

  21. Slide 21: DAM-Block Bid

    DAM-Block Bid Rules for bid linking : •A bid (bid B) can only be linked to one other bid (bid A) •Both bid A and bid B must be of same type, i.e. sale-sale or purchase-purchase. •Bid A and bid B can span any set of hours independently of each other •Bid A and bid B can have any bid price independent

  22. Slide 22: Matching: Model Price Calculation algorithm

    Matching: Model Price Calculation algorithm (Example for a sample 15-min) Price Tick 0 1 1.1 2 2.1 2.5 3 3.1 3.5 3.8 4 4.1 5 7 9 12 14 17 19 20 Portfolio A 20 20 20 20 20 20 20 10 7 4 0 0 0 0 0 0 0 0 0 0 Portfolio B 60 60 60 60 50 40 40 40 40 40 40 40 20 20 20 20 20 20 20 20 Portfolio C 70 70 70 70

  23. Slide 23: Congestion Management

    Congestion Management SR WR S3 S1 Deficit 50 50 150 30 B2 B3 S2 B1 MW MW MW MW 407500 50 MW Surplus S1 B1 S2 S3 80 MW 120 100 MW RS RS 8000 100 MW RS 9000 RS 7000 8500 100 RS 9500 RS 6000 8000 5500 MW B2 Required S3 160 MW Flow Rs 9/u S2 50 MW 100 MW Rs 7.5/u 100 MW Rs 5.5/u B1 S1 50 MW S2 50 MW RS

  24. Slide 24: Congestion Management

    Congestion Management SR WR Deficit Surplus 100 20 MW MW 100 20 MW MW Lowest Buyers getting rejected Highest Seller getting rejected B2 Allowed 160 MW S3 RS 9000 Flow S2 50 MW 20 MW 100 MW RS 7500 B1 RS 5500 S1 50 MW S2 50 MW RS 8500 20 MW RS 8000 RS 8000 S2 S1 B1 B3 40 MW 80 MW 100 MW 30 MW RS 8500

  25. Slide 25: Better handling of congestion @ IEX

    Better handling of congestion @ IEX Details of Congestion IEX PXIL A Unconstrained Cleared Volume#(BUs) 50.13 0.09 B Actual Cleared Volume and hence scheduled (BUs) 50.06 0.08 C Volume of electricity that could have been cleared and 0.07 0.01 hence not scheduled because of congestion (BUs) (A-B) D V

  26. Slide 26: Term Ahead Market

    Term Ahead Market

  27. Slide 27: TAM Market Segments

    TAM Market Segments Open Auction Continuous Continuous Continuous

  28. Slide 28: Types of Contracts

    Types of Contracts • Weekly and Daily – FBA -- Firm Base – 24 Hrs – FNT -- Firm Night – 8 Hrs (0-7 & 23-24) – FDY -- Firm Day – 11Hrs (7-18) – FPK -- Firm Peak – 5 Hrs (18-23) • Day Ahead Contingency and Intra-Day – Hourly & Blockwise (DAC-24 hrs ,& Intraday-04-24) Region Specific Contracts

  29. Slide 29: Trading of Intra-day Contracts

    Trading of Intra-day Contracts Trading Hour Trading Hours:20 (00:30-20:30) 0:30- 1:30- 2:30- 3:30- 4:30- 5:30- 6:30- 7:30- 8:30- 9:30- 10:30- 11:30- 12:30- 13:30- 14:30- 15:30- 1:30 2:30 3:30 4:30 5:30 6:30 7:30 8:30 9:30 10:30 11:30 12:30 13:30 14:30 15:30 16:30 16-:30- 17:30- 18:30- 19:30- 17:30 1

  30. Slide 30: Intra-day & DAC contracts with current trading system

    Intra-day & DAC contracts with current trading system Trading Date Trading Time Intra-Day contracts Trading Time DAC contracts 17-04-2019 00:30- 01:30 H5 to 24 (of 17-04) 17-04-2019 01:30 – 02:30 H6 to 24 (of 17-04) 17-04-2019 02:30 – 03:30 H7 to 24 (of 17-04) 17-04-2019 03:30 – 04:30 H8 to 24 (of 1

  31. Slide 31: Market Place Functionality (TAM)

    Market Place Functionality (TAM)

  32. Slide 32: Bid Matching

    BID MATCHING Open/Closed Continuous Auction Trading Orders accumulated during call phase (no matching) Price-time priority based continuous matching Orders matched after call period The highest Buy order & lowest Sell order gets the Orders are used for priority calculation common price i.e. Equilibr

  33. Slide 33: Uniform Auction

    The Sellers UNIFORM Selected AUCTION Buyers : S1,S2,S3,S4 B1,B2,B3,B4 The:RsBuyers Trade MCP Matched 8000/MWh Volume: Sellers 125 MW (partial) 10 MW @ Rs 6,000 50 MW @ Rs 50 MW @ Rs 50 MW @ Rs 40 MW @ Rs 50 MW @ Rs 9,000 10,000 5,500 7,000 8,000 S5 S6 S4 S3 S1 S2 B1 B2 B3 B4 B5 40 MW @ Rs 25 25 B6 B

  34. Slide 34: Continuous Trading Process

    TWS Screen CONTINUOUS Pending Buy Order TRADING PROCESS Pending Sell Order Buy 10 MW @ Rs 4500/MWh Sell 15 MW @ RS 5500/MWh Trading Engine Buy 10 MW @ RS 4500/MWh Sell 15 MW @ RS 5500/MWh Buy 10 MW @ Rs 4500/MWh Sell 15 MW @ Rs 5500/MWh

  35. Slide 35: TWS Screen

    TWS Screen Pending Buy Order Pending Sell Order Buy Buy1010MW MW@ RS @5000/MWh 4500 Sell 15 MW @ Rs 5500/MWh Buy 10 MW @ RS 4500/MWh Trading Engine Buy 10 MW @ RS 5000/MWh Buy 10 MW @ 5000/MWh

  36. Slide 36: TWS Screen

    TWS Screen Pending Buy Order Pending Sell Order Buy Buy1010MW MW@ RS @4500/MWH 5000 Sell Sell515 MWMW @ Rs@ 5000/MWh 5500 Buy 10 MW @ 4500 Trading Engine Sell 15 MW @ Rs 5000/MWh Trade 10 MW @ RS 5000/MWh Bid Modified Sell Sell1515 MWMWh @ RS 5000/MWh @ 5500

  37. Slide 37: Risk Management in DAM/TAM

    Risk Management in DAM/TAM Proprietary/Trading Licensee Professional Members Members Initial Margin Basis/Additional Initial Margin Basis/Additional Margin Margin Day-Ahead Margin equal to Last 7 Days Average of As per Bank Balance including Hair Cut Market Buy turnover Factor TAM-Intraday 105% of o

  38. Slide 38: Timelines for payment of Charges: DAM/TAM

    Timelines for payment of Charges: DAM/TAM • Application Fees is paid in advance = T • NLDC Scheduling & Operational Charges is paid on T+1 NLDC • Transmission Charges CTU is paid on T+1 Charges • SLDC Scheduling & Operational Charges is paid on T+1 • Transmission Charges STU is paid on T+1 SLDC • Ar

  39. Slide 39: Treatment of Losses

    Treatment of Losses • Both Buyers and Sellers to absorb losses Draw less than Buyer contracted power (Contracted Power – losses) Inject more than contracted power Seller (Contracted Power + Losses) • Average Transmission Losses of the Region where the Entity is geographically located.

  40. Slide 40: Treatment of Losses… for buyer

    Treatment of Losses… for buyer • POC Loss: 1.5% • S1 (State) loss: 4.85 % • Buyer X bids for 100 MW at its respective regional periphery Scheduled Drawal Bid Volume <= SLDC Clearance POC State X 100 MW 98.5 MW Loss at State Loss 93.72 MW at (Buyer) at NR Buyer End periphery periphery 1.5% 4.85% Maxi

  41. Slide 41: Treatment of Losses… for seller

    Treatment of Losses… for seller • POC Loss: 1.5% • State loss: 4.85% • Seller Y bids for 100 MW at its respective regional periphery Scheduled Generation Bid Volume <= SLDC Clearance POC State 101.52MW 106.69MW Y 100 MW at Loss at state Loss Injected by (Seller) regional periphery periphery seller 1

  42. Slide 42: Market Snapshot

    Market Snapshot Participation Volume Prices

  43. Slide 43: Key statistics: Electricity & REC Market

    Key statistics: Electricity & REC Market ELECTRICITY REC Market Share (FY18-19) 97.5% 71% State Utilities 29 States I 5 UTs 28 States I 5 UTs Generators 487 1090 Industrial 4073 3160 Consumers Average Daily >136,799 MWh >3.5 Crore RECs Volume Highest : 306 ,278 MWh Highest: 32,39,142 RECs IEX Data a

  44. Slide 44: Number of Participants

    Participation Increasing Participation Members+Clients Open access consumers 6000 4805 5000 4613 4647 4690 4691 4699 4477 4543 4322 4413 Number of Participants 4166 4003 3835 4000 3560 3678 4241 3345 3455 4025 4058 4092 4144 3919 3967 4012 3792 3867 3656 3521 3000 3389 3235 2911 3024 3121 2000 1000

  45. Slide 45: Participation at IEX

    Participation at IEX 0 6 26 8 430 7 123 2 35 1 5 0 476 4 0 1 0 3 1 0 14 0 343 10 7 0 537 21 58 18 0 1 48 0 3 0 25 27 37 20 0 1 489 32 224 12 249 63 Consumer: 4036 824 20 Generator: 481 32 0

  46. Slide 46: Open Access Status across Indian States

    Open Access Status across Indian States Northern Region East & North Eastern Region States Generator Consumer States Generator Consumer Haryana ✓ ✓ Assam ✓ ✓ Punjab ✓ ✓ Bihar  ✓ Rajasthan ✓ ✓ Manipur/Mizo ✓ ✓ HP ✓ ✓ Tripura/Sikkim ✓ ✓ J&K ✓  Jharkhand   Uttaranchal ✓ ✓ A.P. ✓ ✓ Delhi ✓ ✓ Meghala

  47. Slide 47: Industrial segments with IEX

    Industrial segments with IEX Paper Cotton 3% 1% Others Cement 9% 4% Textile Auto 29% Components 6% Chemical 9% Manufacturer 15% Metal 24%

  48. Slide 48: Price & Volume Comparison (FY18-19)

    Prices CERC MMC Report for FY 2018-19 Price & Volume Comparison (FY18-19) Volume Transacted(BUs) Average Price(Rs/kWh)* 56.00 5 Voume transacted (BUs) 48.00 40.00 4.32 4.24 Price (Rs/kWh) 32.00 4.03 4 24.00 16.00 52.17 47.32 8.00 1.35 0.00 3 Trading Licensees IEX PXIL Short term transactions *Averag

  49. Slide 49: IEX monthly Average MCP in DAM

    IEX monthly Average MCP in DAM Monthly Avg Price (Rs/kWh) 5.00 4.50 4.67 4.00 3.59 3.34 3.34 3.50 3.79 3.23 3.01 2.82 2.92 3.55 2.85 3.00 3.08 3.32 2.61 2.54 3.13 Average Price (Rs/Kwh) 2.30 2.91 2.50 2.85 2.17 2.00 2.32 2.32 1.50 1.00 0.50 0.00 Month

  50. Slide 50: IEX Monthly Prices

    IEX Monthly Prices AVERAGE (RTC) PEAK(18-23) NON-PEAK (1-17 & 24) 6.00 5.25 5.00 5.00 4.70 4.71 4.54 4.41 Price (Rs/kWh) 4.06 4.08 4.03 4.02 4.08 3.92 4.00 3.77 3.79 3.69 3.61 3.67 3.62 3.55 3.52 3.49 3.36 3.38 3.45 3.38 3.34 3.32 3.32 3.26 3.20 3.23 3.22 3.14 3.18 3.13 3.06 3.08 3.09 3.06 3.00 2.94

  51. Slide 51: Quarterly Prices FY 2018-19

    Quarterly Prices FY 2018-19 IEX Prices in Quarter 1 (Apr-June'18) IEX Prices in Quarter 2 (July-Sep'18) 4.00 6.00 3.50 5.00 3.00 4.00 Rs/kwh 2.50 Rs/kwh 4.76 3.00 2.00 4.13 3.92 4.24 5.30 1.50 2.00 3.82 3.33 3.27 1.00 1.00 0.50 0.00 0.00 RTC(00-24 hrs) Peak Hrs avg(18- Non-Peak avg(1- Night off Peak

  52. Slide 52: Area Price (Rs./KWh)

    Area Price (Rs./KWh) 0.00 2.00 4.00 6.00 8.00 10.00 0.99 5.00 2.91 East 2.94 2.90 2.39 January 2020 0.99 5.00 2.91 Min 2.94 2.90 North East 2.39 0.99 5.00 Max 2.91 2.94 2.90 2.39 North(N1+N2) 0.99 5.00 RTC* 2.91 2.94 (0-24 hr) 2.90 North(N3) 2.39 0.99 5.00 2.91 2.94 Prices for various time block Pea

  53. Slide 53: Day Ahead Market Volume Trend

    Day Ahead Market Volume Trend Sell Bid (MW) Purchase Bid (MW) Cleared Volume (MW) MCP (Rs/kWh) 3.86 3.56 3.54 3.49 3.51 3.26 3.04 2.80 2.73 2.41 12,968 5,445 8,328 2,371 1,919 1,347 2,539 2,842 1,571 3,956 4,456 2,554 5,741 4,737 3,302 4,689 4,942 3,212 6,434 4,907 3,878 8,806 4,547 6,522 5,128 9,91

  54. Slide 54: DAM Snapshot

    DAM SNAPSHOT Purchase Bid (MW) Sell Bid (MW) Cleared Volume (MW) MCP (Rs/kWh) 4.00 14000 3.34 3.34 3.38 3.32 3.50 3.22 12000 2.85 2.93 2.86 2.91 3.00 2.77 2.71 10000 2.50 8000 2.00 6000 1.50 4000 1.00 2000 0.50 11170 10180 11087 11278 11405 11902 13134 11915 13703 15685 14902 5567 4844 7234 6432 507

  55. Slide 55: DAM Cleared Volume v/s MCP

    Volume DAM Cleared Volume v/s MCP Cleared Volume MCP 60000 8 7.31 50,136 7 50000 44,925 6 Cleared Volume (MUs) 39,831 40000 5.19 5 MCP (Rs/kWh) 34,066 30000 3.56 3.54 3.49 28,925 28,141 4 3.86 22,330 2.8 3.51 3.26 3 20000 2.73 2.41 11,801 13,799 2 10000 6,171 1 2,616 0 0 FY 15-16 FY 08-09 FY 09-10 F

  56. Slide 56: IEX Monthly Cleared Volume

    IEX Monthly Cleared Volume 7000 Total Monthly Volume (MUs) Total Monthly Volume (MUs) 6000 5725 4965 5000 4345 42… Cleared Volume (Mus) 4086 4207 3920 3955 4000 3630 3488 3364 3356 3188 3146 3101 3107 2987 3078 3066 3000 2536 2447 2173 2276 2000 1000 0 Month

  57. Slide 57: IEX Day Ahead Market Price & Volume Trend

    IEX Day Ahead Market Price & Volume Trend January 2020 Daily Price & Volume Trend 12.00 200 MCV Avg Price MIN price MAX price 11.00 185 170 10.00 155 9.00 140 8.00 125 Price (Rs/kWh) Volume (MUs) 7.00 110 6.00 95 5.00 80 65 4.00 50 3.00 35 2.00 20 1.00 5 0.00 -10 Day

  58. Slide 58: TAM: Performance so far

    TAM: Performance so far Weekly Day-ahead Contingency 3,784,102 MWh 35,22,904 MWh Total Volume traded 11,619 MUs Intraday Daily 22,14,857 MWh 20,87,126 MWh

  59. Slide 59: TAM Monthly Snapshot – February

    TAM Monthly Snapshot –February 20 Total Volume Max Price Min Price Contracts (MWh) (Rs./kWh) (Rs./kWh) Weekly - - - Intraday 52,629 5.30 1.95 Day-Ahead Contingency 42,331 4.56 1.12 Daily 1,31,520 3.85 3.85

  60. Slide 60: Trade @ IEX

    rea eal wal r\ Trade @ IEX Pe

  61. Slide 61: Who Can become Members of IEX?

    Who Can become Members of IEX ? Entities eligible for Membership: ▪ Inter-State Generating Stations (ISGS) ▪ Distribution Licensees ▪ State Generating Stations ▪ IPPs ▪ CPPs and IPPs (with consent from SLDC) ▪ Open Access Customers (with consent from SLDC) ▪ Electricity Traders / Brokers

  62. Slide 62: IEX Membership Types

    IEX Membership Types Proprietary Professional Electricity Member Member Traders Right to trade Trade and clear Trade and clear and clear on its on behalf of its on behalf of its own account Clients Clients Generator- Distribution NO CREDIT CREDIT licensees- IPPs - CPP- MPPs –O A /FINANCING /FINANCIN

  63. Slide 63: Financial Requirements

    Financial Requirements Membership Category: Proprietary / Professional Member The financial criteria for payment options available on IEX are: Professional & Proprietary & Proprietary member Fees Electricity Trader (Light Payment (Full Payment Option) Option) Admission fee Rs. 35,00,000 Rs. 10,00,00

  64. Slide 64: How to Move Ahead…

    How to Move Ahead… Become Member or Client (of a Member)…options • Rs 22.6 Lacs +3p/kWh transaction fee • Rs 65.1 lacs + 2p/kWh transaction fee • Client @ 1Lakh Technical Requirements • Standing Clearance from UTs/State SLDC • ABT Meters • Sufficient transmission capacity Connectivity with exchange

  65. Slide 65: Pre-Trading

    Registration Member Related Activities SELECTION OF MEMBER 1 week Exchange Related Activities METERING (unless already done) 0.5-3 PRE -TRADING ✓ Special Energy Meter Months SLDC Clearance/NOC ✓ NOC from respective SLDC 1 Month Registration at IEX 0.15 ✓ Client registration for each point of drawal