    Axis Real Estate Investment Trust Unaudited 30 September 2014 Results 20 October 2014

  2. Slide 2: Milestones

    Milestones a Finance Report  Successfully signed the Sales & Purchase Agreements for the acquisition of 3 properties with related parties, for RM280.5 million on 4 August 2014, where the Unitholders’ Meeting is scheduled to be convened in November 2014 for the relevant approval.  Successfully sign

  3. Slide 3: Milestones (cont'd)

    a Milestones (cont’d.) Finance Report Currently trades at a premium of 59.8% to our NAV. Axis Business Campus ready for leasing after enhancement; CCC obtained in July 2014 Implementation of Yardi Voyager system Phase 2 on Advanced Budgeting and Finance and Job Costing in 1Q 2014. Launched the T

  4. Slide 4: Our strategy

    Our strategy a Finance Report  Targeting growth in our asset class.  To build on our SUKUK presence in the market. To continue to improve on our capital management.  Continue to enhance existing assets to drive value and income.  Trading of assets to reward our Unitholders.  Best Practices and

  5. Slide 5: Financial Highlights for 3Q 2014

    a Financial Highlights for 3Q 2014

  6. Slide 6: A Quick Snapshot

    A Quick a Snapshot Finance Report YTD 3Q 2014 Total Net Income (RM' 000) 61,957 Income Available for Distribution ("Realised") (RM' 000) 72,455 Earnings per Unit ("EPU") ("Realised") (Sen) 13.40 Income Distribution Declared (RM'000) 72,207 Distribution per Unit* ("DPU") (Sen) 15.60 Number of Investm

  7. Slide 7: Return Comparatives

    a Return Comparatives Finance Report 35.0% 30.4% 30.0% 25.0% 20.0% 15.0% 10.0% 6.35% 5.5% 4.18% 5.0% 3.15% 3.25% 0.0% Axis-REIT Total Axis-REIT Distribution EPF Dividend Return 10-yr MGS 12 Months FD Rate OPR Return * Yield * (based on DPU from operations + gain on disposal + movement in market pric

  8. Slide 8: Income Statement 3Q 2014 vs 3Q 2013

    Income Statement 3Qa 2014 vs 3Q 2013 3Q 2014 3Q 2013 Changes / (RM ‘000) (RM’000) Movement No. of Properties 30 31 -1 Property Income 33,004 35,192 - 6.2% Property Expenses (5,099) (5,073) + 0.5% Net Property Income 27,905 30,119 - 7.4% Profit Income 117 115 + 1.7% Non-Property Expenses (3,352) (3,0

  9. Slide 9: Reconciliation of 3Q2014 realised EPU to 3rd interim DPU

    Reconciliation of 3Q2014 a realised EPU to 3rd interim DPU RM (sen) EPU (realised) for 3Q2014 4.06 Add : Balance of undistributed gain from Axis Plaza (final tranche) 0.76 Add : Payment of manager’s fee in units 0.19 Add : Other adjustments allowed under the Trust Deed 0.01 Income available for dist

  10. Slide 10: Income Statement YTD 3Q 2014 vs YTD 3Q 2013

    a 2014 vs YTD 3Q 2013 Income Statement YTD 3Q YTD 3Q 2014 YTD 3Q 2013 Changes / (RM ‘000) (RM’000) Movement No. of Properties 30 31 -1 Property Income - Note 1 103,255 105,307 - 2.0% Property Expenses - Note 2 (16,318) (15,425) + 5.8% Net Property Income 86,937 89,882 - 3.3% Profit Income 547 480 +1

  11. Slide 11: Income Statement YTD 3Q 2014: Notes on Property Income and Expenses

    a 2014 vs YTD 3Q 2013 Income Statement YTD 3Q Note 1 – Property Income Property income is lower as compared to the corresponding nine months in 2013. The loss of rental from the sale of Axis Plaza and the time taken to complete Axis Business Campus for the first nine months of this year (due to the

  12. Slide 12: Note 3 – Gain on disposal of investment

    a 2014 vs YTD 3Q 2013 Income Statement YTD 3Q Note 3 – Gain on disposal of investment Computation of Distributable Gain on Disposal: RM'000 Disposal price 34,000 Less: Current book value (32,034) 1,966 Less : Incidental cost Legal fees - SPA (85) Valuation fees (8) Disposal fee (180) Defect repair w

  13. Slide 13: Note 3 – Gain on disposal distribution

    a 2014 vs YTD 3Q 2013 Income Statement YTD 3Q Note 3 – Gain on disposal of investment The disposal of Axis Plaza, which was completed on the 25 March 2014, has resulted in a total realized gain on disposal of RM10,952,000 (“Gain on disposal”) which is represented by the gain on disposal of RM1,614,0

  14. Slide 14: Notes 4 and 5 – Non-Property Expenses, Islamic Financing Cost

    a 2014 vs YTD 3Q 2013 Income Statement YTD 3Q Finance Report Note 4 – Non-Property Expenses The MER of the Fund as at 30 September 2014 is 1.30% of NAV as compared to 1.25% for 2013. The increase is due to increase in the Manager’s and Trustee’s fees which resulted from the increase in the NAV of th

  15. Slide 15: Gross Yield Of Investment Properties

    a Gross Yield Of Investment Properties Finance Report 17.92% Average gross yield = 10.32% 18.00% 16.54% 16.00% 14.99% 14.00% 12.95% 12.23% 12.25% 11.71% 11.68% 12.00% 10.89% 10.99% 11.26% 10.75% 10.97% 10.37% 10.61% 10.42% 9.96% 9.96% 9.86% 10.00% 9.50% 9.03% 8.91% 9.01% 8.43% 8.65% 8.33% 8.12% 8.00

  16. Slide 16: Net Yield Of Investment Properties/Cost

    a Properties/ Cost Net Yield Of Investment Finance Report 16.00% 14.14% Average net yield per property = 8.78% 14.00% 13.07% 12.34% 12.00% 11.60% 10.94% 10.88% 10.27% 9.99% 9.92% 9.98% 10.00% 9.22% 9.00% 9.09% 8.58% 8.74% 8.81% 8.43% 8.45% 8.57% 8.36% 8.25% 8.13% 7.60% 7.79% 7.99% 8.00% 7.20% 6.39%

  17. Slide 17: Income Statement quarterly trend

    a Income Statement Finance Report 35.00 Adjusted Income Before Taxation/ Income Available For Distribution: Gain on 30.00 disposal RM10.952 Gain on mil disposal 25.00 RM7.2 Gain on disposal mil RM5.9 mil 20.00 RM' million 15.00 20.54 21.21 21.32 21.45 31.78 20.83 10.00 19.85 5.00 - 1Q 2013 2Q 2013 3

  18. Slide 18: Third 2014 Interim Income Distribution

    a Third 2014 Interim Income Distribution Finance Report 3rd Interim Distribution 2014 – 5.0 sen The 5.00 sen DPU is based on 99.6% income available for distribution from performance of properties and the balance gain on disposal of Axis Plaza. This payment together with the 1st and 2nd interim incom

  19. Slide 19: Details of 1st IDRP 2014

    a Details of 1st IDRP 2014 Finance Report Details of the 2014 IDRP (in conjunction with 2014 First Interim Income Distribution): Electable portion : 2.20 sen out of the 5.30 sen Exercise price : RM3.20; representing 5.9% discount to 5-days VWAMP RM3.4005 Subscription rate : 84% Net amount converted

  20. Slide 20: Postponement of IDRP

    a Postponement of IDRP Finance Report In view of the placement, it is proposed to postpone implement the IDRP for 3rd quarter 2014 as the number of new units that can be issued under the placement will then need to be adjusted by the IDRP units subscribed. 20

  21. Slide 21: Summary of EPU (Realized) and DPU

    a Summary of EPU (Realized) and DPU Finance Report 20.00 18.60 18.6018.46 18.50 18.00 Increasing DPU y-o-y 17.28 17.20 since listing 15.77 15.80 16.01 16.00 16.00 15.46 15.60 15.27 14.00 13.60 13.63 13.40 12.82 12.95 12.00 sen per unit 10.00 8.00 6.00 4.87 4.70 4.00 2.00 - 2005 2006 2007 2008 2009 2

  22. Slide 22: Statement of Financial Positions

    a Statement of Financial Positions 30/9/14 31/12/13 (RM’000) (RM’000) Changes Investment Properties – Note 1 1,572,416 1,543,248 + 29,168 Fixed Assets 2,895 2,407 + 488 Other Assets – Note 2 69,483 70,868 - 1,385 TOTAL ASSETS 1,644,794 1,616,523 + 28,271 Borrowings – Note 3 549,692 528,004 + 21,688

  23. Slide 23: Statement of Financial Positions – Notes

    a Statement of Financial Positions Finance Report Note 1 – Investment properties A total of RM8.299 million was spent on Asset Enhancement Initiatives in the first nine months of 2014. Note 2 – Other assets Trade receivables dropped by 61.5%. The average collection for nine months 2014 has reduced t

  24. Slide 24: Statement of Financial Positions – Borrowings

    a Finance ReportPositions Statement of Financial Note 3 – Borrowings YTD 3Q 2006 2007 2008 2009 2010 2011 2012 2013 2014 Total Borrowings (RM’000) 88,089 209,816 230,456 308,932 416,609 311,338 548,920 528,004 549,692 Total Assets (RM’000) 411,781 581,857 726,371 907,745 1,208,897 1,298,431 1,589,40

  25. Slide 25: Gearing Levels and Placements Undertaken

    a Statement of Financial Positions Finance Report Gearing Levels Placements Undertaken 40.0% 38.2% 36.0% 37.5% 36.1% 36.0% 34.5% 35.4% 34.0% 34.5% 34.2% 33.9% 32.7% 35.0% 33.0% 31.7% 33.1% 32.6% 32.5% 33.4% 31.2% 31.8% 31.3% 32.7% 31.7% 30.0% 30.0% 29.1% 28.8% 26.8% 27.3% 25.0% 25.0% 23.7% 23.5% 24.

  26. Slide 26: Non-distributable reserve

    a Statement of Financial Positions Finance Report Note 4 – Non-distributable reserve Non-distributable reserve mainly comprises the favorable gain in fair value of approx. RM262 million to date. 45 42 40 Revaluation suplus to date (on individual property) 35 35 30 25 RM Millions 25 22 22 20 17 15 15

  27. Slide 27: Placement for Year 2014

    Placement for Yeara2014 Finance Report Placement of 83,579,942* units  Mandate from unitholders renewed on 29 April 2014.  Expected to raise approximately RM280.0 million.  Timing : End November 2014 to coincide with the completion of the new acquisitions.  * The earlier approved placement units

  28. Slide 28: Placement for Year 2014 – Total Assets

    Placement for Yeara2014 Finance Report Total Assets set to cross the RM 2 2,500.0 Billion mark The funds raised from equity placements are being 2,078.8 2,000.0 injected into acquiring good quality properties….. 1,616.5 1,644.8 1,644.8 1,589.4 1,600.6 1,500.0 RM mil 1,298.4 1,208.9 1030.3 1,000.0 90

  29. Slide 29: Return to unitholders

    a Return to unitholders Finance Report … resulting in good total returns to unitholders . 360% 320% 309% 280% 119% 240% 200% 166% 173% 160% 55% 122% 65% 120% 38% 190% 70% 80% 118% 22% 101% 40% 84% 48% 0% IPO @ RM1.25 Placement '08 @ RM1.80 Placement '09 @ RM1.66 Placement '10 @ RM1.97 Placement '11

  30. Slide 30: Report on Revaluation of properties

    a Report on Revaluation of properties

  31. Slide 31: Revaluation of properties

    a Revaluation of properties Finance Report Name of Properties Net Book Value Open Surplus to be as at 30 Market incorporated September Value into Axis-REIT 2014 (RM'000) (RM'000) (RM'000) 1. Seberang Prai Logistic Warehouse 3 63,236 63,500 264 2. Axis Vista 36,344 56,000 19,656 3. Bayan Lepas Distri

  32. Slide 32: Revaluation of properties – % on investment cost

    a Revaluation of properties Finance Report % of Revaluation on Properties Revaluation Surplus to date= Investment Cost The increase in value demonstrated the ability of the Manager to create value to the assets 70% 67% 65% 61% 60% 50% 44% 40% 30% 28% 27% 28% 30% 26% 24% 24% 23% 20% 17% 14% 12% 13% 1

  33. Slide 33: Properties Appreciation Value as at 30 September 2014

    a Revaluation of properties Finance Report Properties Appreciation Value as at 30 September 2014 120 100 25 35 6 42 17 13 80 3 10 15 2 60 3 1 2 1 10 89 22 RM Millions 22 86 40 80 1 8 74 77 74 65 66 1 2 62 56 53 50 2 50 50 20 2 39 43 34 35 34 2 3 28 2 31 4 3 2 27 20 15 13 18 1 13 11 12 7 - - Acquisit

  34. Slide 34: Property Report

    a Property Report

  35. Slide 35: Overview

    Overview a As we enter our 10th Year of Asset Management many leases in our portfolio that were in place since the time of our listing, came due for renewal in 2014. Unfortunately some of our tenants decided to relocate to other countries or relocate as their space requirements outstripped our abili

  36. Slide 36: Key Metrics

    Key Metrics a Type 3Q2014 2Q2014 Movement Property Income (RM'000) 33,004 34,839 - 5.27% Property Expenses (RM'000) 5,099 5,379 - 5.20% Net Property Income (RM'000) 27,905 29,460 - 5.28% Occupancy 90.54% 91.95% -1.41%

  37. Slide 37: Key Metrics – Average Rental

    Key Metrics a Average Rental Type of Properties 2Q2014 2Q2014 Movement Office (RM/Sq ft) 4.56 4.52 +0.88% Office Industrial (RM/Sq ft) 2.60 2.55 +1.96% Manufacturing Facilities (RM/Sq ft) 0.84 0.84 No change Warehouse/Logistics (RM/Sq ft) 1.63 1.65 -1.21% Hypermarket (RM/Sq ft) 2.24 2.24 No change

  38. Slide 38: Space Under Management (Sq Ft)

    a Space Under Management (Sq Ft)

  39. Slide 39: Lease Expiry Profile

    Lease Expiry Profilea Year % of % of Rental Year % of % of Rental Year % of % of Rental Property 2014 Total NLA Income/month 2015 Total NLA Income/month 2016 Total NLA Income/month Menara Axis 54,587 1.03 2.39 - - 0.03 91,514 1.72 3.57 Crystal Plaza 81,339 1.53 3.04 3,407 0.06 0.08 120,122 2.26 4.70

  40. Slide 40: Income Growth – Rental Reversions

    Income Growth – aRental Reversions Space Renegotiated Properties (Sq. Ft.) % Rent Movement MENARA AXIS 15,763 +4.87% CRYSTAL PLAZA 7,747 +9.91% AXIS BUSINESS PARK 136,809 +11.43% INFINITE CENTRE 28,074 +11.76% WISMA KEMAJUAN 3,571 +4.66% AXIS EUREKA * +2.41% AXIS STEEL CENTRE 366,839 -17.54% SPLW 3

  41. Slide 41: Income Growth – Lease Renewal & Rental Reversions

    a Income Growth – Lease Renewal & Rental Reversions  The Manager has successfully renegotiated 1,417,938 sq. ft. of space for 3Q 2014 out of 1,825,948 sq. ft. space due for renewal in 2014.  77.65% tenants retention rate achieved.  Rental growth of 575,050 sq. ft. space achieved from pre-negotiat

  42. Slide 42: Portfolio Occupancy Rate

    a Rate Portfolio Occupancy As at 30 September 2014 Axis REIT has 12 out of 30 properties that carry vacancy. 18 properties enjoy 100% occupancy. Occupancy As at 30 June 2014 91.95% As at 30 September 2014 90.54% Vacancy As at 30 September 2014 9.46% For Axis Multi-tenanted Buildings Q3 2014 Occupanc

  43. Slide 43: Potential DPU upside 4.6 sen per unit/year

    a Rate Portfolio Occupancy Vacancy As at 30 Sept 2014 9.46% Spaces to be let out 503,588 sq. ft. Unbilled spaces income RM21.1 million per year Potential DPU upside 4.6 sen per unit/ year

  44. Slide 44: Occupancy Rates by Property

    a As at 30 September 2014 Occupancy Rates by Property % Occupancy

  45. Slide 45: Portfolio Diversification by Type

    Diversified Portfolioa Portfolio Diversification by Type and Diversification 11.45% Office Office/ 29.02% Industrial Hypermarkets 6.98% Logistic 44.51% Warehouses Manufcturing 8.04% Facilities 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% 45.00%

  46. Slide 46: Portfolio Location

    Portfolio Location Nilai Cyberjaya Penang Kedah Johor Klang Shah Alam Petaling Jaya Portfolio Analysis by Geographical Location and NLA 5.48% 2.21% 4.05% 2.59% 8.79% 98% 11.33% 37.58 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00%

  47. Slide 47: Tenancy Mix – Single Tenant Vs Multi-Tenants

    Tenancy Mix a Single Tenant Vs Multi-Tenants

  48. Slide 48: Occupancy of Properties Below 90%

    a Occupancy Properties Below 90% Occupancy rates of properties below 90% as of 30 September 2014 Annex is seeking a new operator for its futsal centre Vacant space Fontera HQ is built for their future expansion Axis Business Park is enhancing Block C

  49. Slide 49: Weighted Average Lease Expiry (WALE)

    a Expiry (“WALE”) Weighted Average Lease The Average “WALE” For the Portfolio is: By Year Q3 2014 Q2 2014 By NLA 3.90 4.04 By Rental 4.06 4.12

  50. Slide 50: Portfolio Efficiency

    Portfolio Efficiency a(“PE”) The Efficiency Ratio (“ER”) ER= The Operating Cost for the Portfolio / Gross Property Income 3Q2014 2Q2014 15.84% 15.97%

  51. Slide 51: Top Tenants

    a Rental Covenants Top 10 Tenants - Strong 1. Konsortium Logistik Bhd 2. LF Logistics Services (M) Sdn Bhd 3. Schenker Logistics (M) Sdn Bhd 4. Tenaga Nasional Berhad 5. Tesco Stores (M) Sdn Bhd 6. DHL Properties (M) Sdn Bhd 7. Strateq Data Center Sdn Bhd 8. GCH Retail (Malaysia) Sdn Bhd 9. Nippon E

  52. Slide 52: Asset Enhancement Initiatives

    a Asset Enhancement Initiatives

  53. Slide 53: Axis Business Campus West Block (Before)

    a Axis Business Campus West Block (Before)

  54. Slide 54: Axis Business Campus West Block (After)

    a Axis Business Campus West Block (After )

  55. Slide 55: Axis Business Campus South Block (Before)

    a Axis Business Campus South Block (Before)

  56. Slide 56: Axis Business Campus South Block (After)

    a Axis Business Campus South Block (After)

  57. Slide 57: Refurbishment Axis Business Campus Overall (After)

    a Refurbishment Axis Business Campus Overall (After)

  58. Slide 58: Property Awards

    Property Awards a AXIS BUSINESS CAMPUS WINS INTERNATIONAL PROPERTY AWARD FOR COMMERCIAL RENOVATION/ REFURBISHMENT IN MALASYIA AND ASIA PACIFIC Axis REIT walked away as winners at the prestigious Asia Pacific Property Awards 2014, taking home 2 awards for Axis Business Campus. At the awards ceremony

  59. Slide 59: Axis Business Campus Project Analysis

    a – Projected ROI Axis Business Campus Project Analysis Axis Business Initial Cost : RM 34,173,526.21 Campus (ABC) Redevelopment : RM 23,639,326.00 Total cost : RM 57,812,852.21 NLA : 155,401 sq. ft. Estimated Property Income : RM 7,600,000 Projected Gross Yield: 13%

  60. Slide 60: Axis Business Park Block C Current Status

    a C Axis Business Park Block Current Status

  61. Slide 61: Axis Business Park Block C After Enhancement

    a C Axis Business Park Block After Enhancement

  62. Slide 62: Axis Business Park Block C After Enhancement

    a C Axis Business Park Block After Enhancement Lift Lobby Entrance Lobby F&B Corner

  63. Slide 63: Axis Business Park Block C Projected ROI

    a C – Projected ROI Axis Business Park Block Project Analysis ABP Block C Initial Cost : RM 46,393,274 Refurbishment Redevelopment : RM 12,324,149 (est.) Total cost : RM 58,735,423 NLA : 182,187 sq. ft. Number of Car parks: 166 Estimated Property Income : RM 7,200,000 Projected Gross Yield : 12.26%

  64. Slide 64: Annex Redevelopment Current Status

    Annex Redevelopmenta Current Status

  65. Slide 65: Annex Redevelopment After Enhancement

    Annex Redevelopmenta After Enhancement

  66. Slide 66: Annex Redevelopment – Projected ROI

    a Annex Redevelopment – Projected ROI Project Analysis Annex Initial Cost : RM 12,289,272.25 Redevelopment Redevelopment : RM 30,000,000.00 (est.) Total cost : RM 42,289,272.25 NLA : 127,133 sq. ft. (30% office & 70% warehouse) Number of Car Parks: 266 Estimated Gross Property Income : RM 4,500,000

  67. Slide 67: Investor Relations Report

    Investor Relations Report AtslS REAL ESTATE INVESTMENT TRUST

  68. Slide 68: Price Performance

    a Price Performance 3.80 3.69 3.62 3.55 3.54 3.50 3.38 3.37 3.30 3.31 3.09 2.93 2.85 2.80 2.30 1.80 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 68

  69. Slide 69: Volume Performance

    a Volume Performance • Prices are now at RM 3.62 (30 Sept 2014). • Unit Price appreciation from Dec 31 2013 to 30 Sept 2014 is 24%. Note : October volume is up to 10 October 2014 69

  70. Slide 70: KLCI vs AXREIT Price & Volume Statistics

    KLCI vs AXREIT a 1 Jan 2013 – 30 September 2014 Price & Volume Statistics Unit Price 30 Sept 2014 RM 3.62 Unit Price @ 31 Dec 2013 RM 2.93 Unit Price @ 30 June 2014 RM 3.31 Highest Price 3Q2014 RM 3.63 (September 2014) Lowest Price 1Q 2014 RM 2.80 (January 2014) Average Monthly Volume 8,124,000 YTD

  71. Slide 71: Top 10 Unitholders

    a Top 10 Unitholders 1 EMPLOYEES PROVIDENT FUND 2 SKIM AMANAH SAHAM BUMIPUTERA 3 KUMPULAN WANG PERSARAAN (DIPERBADANKAN) 4 TEW PENG HWEE @ TEOH PENG HWEE 5 ALEX LEE LAO 6 EXEMPT AN FOR AIA BHD. 7 DATO’ CARL GUNNAR MYHRE 8 AS 1 MALAYSIA 9 AMANAH SAHAM DIDIK 10 PUBLIC SMALLCAP FUND Top Unitholders’Per

  72. Slide 72: Improving Investor Visibility & Liquidity

    a & Liquidity Improving Investor Visibility No. of CDS Accounts 3,500 3,242 3,228 3,138 3,009 3,000 2,850 2,702 2,420 2,500 2,080 2,000 1,652 1,500 1,000 500 - 2008 2009 2010 2011 2012 2013 1Q2014 2Q2104 3Q2014  Quarter-on-quarter, total number of CDS accounts decreased by 90 to 3,138.  Total fore

  73. Slide 73: Business Development Report

    a Business Development Report

  74. Slide 74: Current Acquisitions

    Current Acquisitions a RELATED PARTY ACQUISITIONS  Entered into SPAs for 3 related party assets on 4 August 2014.  Total purchase price for all 3 RPTs – RM280.5 million.  All 3 RPTs assets are located in Shah Alam prime : • SADC 2 - Section 16 • SADC 3 – Section 33 • Axis MRO Hub – Section 15  E

  75. Slide 75: SADC 3 – Section 33

    SADC 3 – Section 33 a Building C – LF Logistics Building A&B – Konsortium Logistik 75

  76. Slide 76: SADC 3 – Section 33 Details

    SADC 3 – Section 33 a Land Area : approximately 23 acres Gross floor area : Total – approx 694,000 sf : Building A & B – approx 362,000 sf (Konsortium Logistik) : Building C – approx 331,000 sf (LF Logistics) Land Tenure : Freehold Occupancy : 100% Solar panel leases : approx 297,000sf of roof space

  77. Slide 77: SADC 2 – Section 16

    SADC 2 – Section 16 a 77

  78. Slide 78: SADC 2 – Section 16 Details

    SADC 2 – Section 16 a Land Area : approximately 6 acres Gross floor area : 171,650 sf Land Tenure : Leasehold expiring 8 August 2066 Occupancy : 100% Solar panel leases : approx 145,000sf of roof space Purchase Price : RM45 million Valuation : RM46 million Projected initial net yield : 7.0% 78 WALE

  79. Slide 79: Axis MRO Hub – Section 15

    Axis MRO Hub – Section a15 79

  80. Slide 80: Axis MRO Hub – Section 15 Details

    Axis MRO Hub – Section a15 Land Area : approximately 3 acres Gross floor area : Total – approx 172,000 sf Land Tenure : Leasehold – exp 12 Jan 2086 Occupancy : 100% Purchase Price : RM52.5 million Valuation : RM53 million Projected initial net yield : 7.07% Overall WALE : approx 7 years 80

  81. Slide 81: Axis Steel Center @ SiLC

    Axis Steel Center @ SiLC a Land Area : approximately 27 acres Gross floor area plus hardstand : 504,400 sf + 183,611 sf Land Tenure : Freehold Occupancy : 100% Purchase Price : RM153.5 million Valuation : RM156.0 million Projected initial net yield : 7.2% Overall WALE : 15 years 81

  82. Slide 82: Axis Steel Center @ SiLC Location

    Axis Steel Center @ SiLC-aLocation 82

  83. Slide 83: Thank you

    ANS REAL! INVESTMENT TRU:

Axis Real Estate Investment Trust — Q3 2014 Earnings Presentation on 6ix