Janus Electric Holdings Limited · ASX:JNS
Janus Electric — Geodynamics — Investor Presentation (June 2013)
16 slides from Janus Electric's investor presentation, June 2013
Slide 1: Geodynamics: Power from the Earth
Geodynamics: Power from the Earth Three Tickers, Twenty Minutes Geoff Ward – CEO and Managing Director Sydney , June 2013
Slide 2: Important Information
IMPORTANT INFORMATION Disclaimer Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect and these statements speak only as of the date of this presentation. This presentation should not be relied upon as a recomm
Slide 3: Geodynamics Limited
Geodynamics Limited • Australia’s largest and most prospective geothermal resource capable of supplying national scale power - Innamincka Deeps Project • Global leader in Enhanced Geothermal Systems industry with successful demonstration of 1MWe Habanero Pilot Plant at Innamincka • Savo Island Proje
Slide 4: Team and Capability
Team and Capability Geodynamics has capability to effectively develop our portfolio of geothermal projects; the successful commissioning of our 1 MWe Habanero Pilot Plant demonstrates ability to meet key milestones and continues recent record of successful field programs in Cooper Basin and Solomon
Slide 5: Geothermal Energy
Geothermal Energy Geothermal has attractive characteristics that offer long term energy security, sustainability and affordability. • Low emissions with lowest carbon footprint of available renewable energy technologies • Large resource base capable of supplying national scale power for many decades
Slide 6: How does geothermal work?
How does Geodynamics’ portfolio contains both volcanic and enhanced geothermal system projects geothermal work? A geothermal project requires: • A production well to extract hot water from the resource • Extraction of energy from the hot water for electricity generation • An injection well so water
Slide 7: Innamincka Deeps
Innamincka Deeps The Innamincka granite resource alone has the potential to make a material contribution to Australia’s long term energy supply. • ~1,200 km2 of high heat producing granite in Cooper Basin tenements • High temperatures of ~240ºC at 4,000 m and ~270ºC at 4,900 m • Demonstrated highly
Slide 8: Australia's Energy Future
Australia's Long-term Treasury modelling indicates geothermal has the potential to supply 10 – 20 % of Australia’s Energy Future energy needs 8
Slide 9: Habanero Project
Habanero Project Over the past 12 months Geodynamics has achieved significant progress in its Cooper Basin EGS project culminating in the commissioning of the 1MWe Pilot Plant in April. • Safe drilling of Habanero 4 to 4,204 m and completion of first reverse cementing operation in Australasia • Firs
Slide 10: Habanero 4 Test Program
Habanero 4 Test Program 10 VIDEO CLIP: Steam flow at Habanero 4
Slide 11: Habanero Power Station
Habanero Power Station • 6 well development in established An initial 5 - 10 MWe power station selling to Habanero reservoir Cooper Basin gas producers would be the first • Lower drilling costs through large scale geothermal operation in Australia improved design and improvements identified in Haban
Slide 12: What makes a successful geothermal project?
What makes a successful geothermal project? There are a range of market opportunities where geothermal is highly cost competitive and its attractive characteristics are maximised. Attractive project and market characteristics: • High temperature, low cost resource • High local tariff and lack of com
Slide 13: Savo Island Geothermal Power Project
Savo Island Geothermal Power Project The project aims to deliver lower end user prices, improved reliability, displacement of diesel consumption and reduced CO2 emissions, whilst providing an attractive return to investors. Solomon Islands project characteristics: • Savo Island – indications of high
Slide 14: Savo Project Summary
Savo Project Summary Exploration drilling is planned for 2014 to prove a geothermal reserve capable of supporting an initial 20MW project • Geodynamics farmed-in to the Savo JV with Kentor Energy in November 2012 • Farm-in Stage One completed in April with the finalisation of Initial Resource Assess
Slide 15: Financial Management
Financial Management Careful financial management has maximised available funds for investment at Habanero, Savo Island and acquisition of further projects. • Sale of Rig 100 and 200 assets raised a total of $26.5 million (GDY share) • Draw down of REDP funding $20.4 million as at February 2012; ant
Slide 16: Investment highlights
Investment highlights As Australia’s leading geothermal exploration company, Geodynamics has the technical expertise and funds to progress our Cooper Basin and Savo Island projects to the next stage. • Australia’s largest and most advanced geothermal resource with potential to supply gigawatt scale