Ramelius Resources Limited · ASX:RMS
Ramelius Resources — Investor Presentation (June 2007)
24 slides from Ramelius Resources's investor presentation, June 2007
Slide 1: Investor Presentation
INVESTOR PRESENTATION Joe Houldsworth Managing Director June 2007
Slide 2: Ramelius Resources Limited
RAMELIUS RESOURCES LIMITED LISTED MARCH 2003 ACHIEVEMENTS • Discovery and Development of Wattle Dam Gold Mine • Cash Acquisition of Burbanks Treatment Plant • Refurbishment and Recommissioning of Plant FUTURE • Increase Mineable Resources at Wattle Dam • Burbanks Treatment Plant Production • Explora
Slide 3: Capital Structure
CAPITAL STRUCTURE (at 31 May 2007) ISSUED CAPITAL 107,731,636 fully paid ordinary shares 32,915,098 options (18.687c) Expire 31 Dec 07 26,222,877 options (17.5c) Expire 30 June 07 TOP TEN SHAREHOLDERS % Beach Petroleum Limited 13,400,002 12.44 HSCB Custody Nominees (Australia) Pty Ltd 7,105,709 6.60
Slide 4: Corporate Structure
CORPORATE STRUCTURE DIRECTORS • Chairman: Bob Kennedy • Managing Director: Joe Houldsworth • Non-Executive Director: Reg Nelson SENIOR MANAGEMENT • CFO/Company Secretary: Dom Francese • Business Development Manager: Ian Gordon • Mines Manager: Brian Kelty • Process Manager: Tony Webb • Senior Geolog
Slide 5: Capital Management Program
CAPITAL MANAGEMENT PROGRAM • Ramelius recently announced a capital management program following the exceptional results from the Wattle Dam Gold Mine. • Future operations including the cut-back to the existing Wattle Dam open pit and potential underground mining are expected to be self- funding from
Slide 6: Spargoville Project Area
SPARGOVILLE PROJECT AREA •Tenements extend over 30 kilometres strike length •Located Along Regional Shears •Large Mineralised System in Mafic and Ultramafic Rocks
Slide 7: Pit at Completion of First Phase
PIT AT COMPLETION OF FIRST PHASE 1ST NOVEMBER 2006 - 53.5 METRES DEPTH
Slide 8: Wattle Dam Gold Mine Diagramatic Longitudinal Projection
7700 mN 7750 mN 7800 mN 7850 mN 7900 mN 7950 mN 8000 mN Ramelius Resources Limited Wattle Dam Gold Mine Diagramatic Longitudinal Projection Looking: West RAMELIUS *RESOURCES Surface - SOUTH 300 mmRL. a "4 £ ° B a WDRC225 3m @ 32g/t Au from 150m ( or'13m @ seni Au from 150m (eut) 150 mRL ‘© Eastern Z
Slide 9: 3D View of Wattle Dam Looking North West
3D View of Wattle Dam Looking North West
Slide 10: 3D View of Wattle Dam with drill holes
3D View of Wattle Dam Looking North West with drill holes
Slide 11: Mine Development
MINE DEVELOPMENT at 1st November 2006 (At 53.5 metres depth, mining suspended.) Ore Mined 160,123 t Cumulative (Uncut) Gold Grade 10.1g/t CURRENT GOLD STOCKS Gold Sales 16,553 oz (sold at an average $833/oz for $13,798,150) Stockpiles (mine & mill) approx ~35,000 oz (value $28 million at $800/oz) Ou
Slide 12: Predicted Production
PREDICTED PRODUCTION For Six months to January 2008 • ORE STOCKPILED ~100,000 Tonnes at 10g/t • MILLING RATE 15,000 Tonnes per month • EST. MONTHLY GOLD PRODUCTION 4,800 ozs (Annualised equivalent 50,000 ozs/year)
Slide 13: Exploration
EXPLORATION Discovering our Future
Slide 14: Spargoville Belt is a Large Mineralised System
SPARGOVILLE BELT IS A LARGE MINERALISED SYSTEM WITH - ~20 Priority Gold Targets ~17 Priority Nickel Sulphide Targets Several TantalumTargets
Slide 15: Wattle Dam Gold System
WATTLE DAM GOLD SYSTEM NOTE THE PROXIMITY OF WATTLE DAM GOLD MINE AND GOLDEN ORB PROSPECT(S) ~600 METRES EFFECTIVELY UNTESTED
Slide 16: Drilling at Golden Orb Prospect
DRILLING at GOLDEN ORB PROSPECT (7000N) 600m SOUTH OF WATTLE DAM GOLD MINE ECONOMIC GRADES INTERSECTED AT SHALLOW DEPTH
Slide 17: Golden Orb Prospect Cross Section
GOLDEN ORB PROSPECT CROSS SECTION • 50M Wide Mineralization • Higher Grade zones • Open to North West
Slide 18: Golden Orb Prospect Cross Section
GOLDEN ORB PROSPECT CROSS SECTION • 50M Wide Mineralization • Higher Grade zones • Open to North West
Slide 19: Logan's Larkinville Project
LOGAN’S LARKINVILLE PROJECT • Gold in Soil Anomalies • First Pass RAB Drilling Returned 52m at 1.4g/t gold including 32m at 2.0g/t gold from 12m depth. • RC follow-up drilling planned for July 07
Slide 20: Ramelius Nickel Rights
RAMELIUS NICKEL RIGHTS Hilditch 90% Wattle Dam 80% Logans Larkinville 80% Generated 17 Nickel Sulphide targets. RAB Drilling on these targets commenced June 2007
Slide 21: Burbanks Treatment Plant
BURBANKS TREATMENT PLANT A Recent Cash Acquisition 8 kms to Coolgardie Crushing Ball Mill CIP Circuit Water Licence Tailings Disposal Workshops Laboratory Operated by Ramelius Milling Services Pty Ltd (A Wholly Owned Subsidiary of Ramelius Resources Limited)
Slide 22: Burbanks Treatment Plant
BURBANKS TREATMENT PLANT • Acquired 180,000 tpa Gold Plant • Funded from Reserves • Advances Cash Flow • Security of Processing Availability • Re-commissioning Completed – Running 24/7
Slide 23: Outlook
OUTLOOK • WATTLE DAM GOLD MINE • RESOURCE ESTIMATE OPTIMISED FOR MINE PLAN • CUT-BACK AND UNDERGROUND OPERATIONS • GROWTH ACTIVITIES • PROCESS ORE STOCKPILES AT BURBANKS TREATMENT PLANT • EXPLORATION FUNDED FROM CASH FLOW • FOCUS ON GOLD TARGETS AT SPARGOVILLE • EXPAND NICKEL SULPHIDE EXPLORATION AT
Slide 24: Wattle Dam Keeps on Delivering!
I Wattle Dam open pit WATTLE DAM KEEPS ON DELIVERING! Ramelius holds over 300 square kilometres and 30 kilometres of strike in the Spargoville Area. This flagship project covers some of the most prospective yet least explored gold and nickel ground in Australia. Wattle Dam Gold Mine Diagramatic Long
Ramelius Resources — Investor Presentation (June 2007) on 6ix