Iluka Resources Limited · ASX:ILU
Iluka Resources — Bank of America Global Metals and Mining Conference 2010
26 slides from Iluka Resources's conference presentation, May 2010
Slide 1: Iluka Resources Limited
Iluka Resources Limited David Robb – Chief Executive Officer Bank of America Global Metals and Mining Conference May 2010
Slide 2: Disclaimer – Forward Looking Statements
Disclaimer – Forward Looking Statements This presentation contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing and sale of minerals. These forward-looking statements are subject to a range of risk factors associated, but n
Slide 3: Iluka's Position in Mineral Sands
Iluka’s Position in Mineral Sands • #1 global producer of zircon • #2 global producer of titanium dioxide • Significant market share position in the high value titanium dioxide products - rutile (34%), synthetic rutile (62%) and chloride ilmenite (42%) Major Zircon and Titanium Dioxide Feedstock Pro
Slide 4: Iluka Resources (ASX: ILU) Overview & Investment Proposition
Iluka Resources (ASX: ILU) Overview & Investment Proposition Market Capitalisation ~A$1.8 billion (418 million shares on issue) Industry Sector Materials - mineral sands exploration, project development, operations and marketing - iron ore royalty from BHP Billiton’s Mining Area C, Western Australia
Slide 5: Portfolio Characteristics
Portfolio Characteristics Improved Margin Structure from Two Main Assets • Murray Basin and Jacinth-Ambrosia will contribute most of Iluka’s production from 2011 - 80-90% of zircon and rutile production • Higher cash margin structure than historical assets Indicative Asset Characteristics Jacinth-Am
Slide 6: Murray Basin Stage 2
Murray Basin Stage 2 Major Rutile and Zircon Production Province 6
Slide 7: Eucla Basin
Eucla Basin Jacinth-Ambrosia – Major New Zircon Development 7 Source: Iluka
Slide 8: Jacinth-Ambrosia
Jacinth-Ambrosia Aerial View 8
Slide 9: Jacinth-Ambrosia Assemblage Characteristics
Jacinth-Ambrosia Assemblage Characteristics Global Outlier Zircon Content 3.00 Iluka Jacinth-Ambrosia 2.50 2.00 Zircon to titanium tioxide ratio 1.50 1.00 Namakw a A ustralian Zircon Gunson Resources Iluka Mid West Iluka V irginia Iluka Murray Basin 0.50 DuPont CRL Ticor SA RBM BeMax Tiw est JV MDL
Slide 10: Competitive Revenue:Cash Cost Position
Competitive Revenue:Cash Cost Position Iluka’s Portfolio Transformed with New Production Base Industry Revenue to Cash Cost Ratio* 2011 -2013 First Quartile Second Quartile Third Quartile Fourth Quartile Ambrosia Jacinth- Murray Basin Iluka Other Iluka US Iluka WA Iluka Avg 2011-13 = 1.8 Ratio Iluka
Slide 11: Capital Expenditure, Cash Flow and Debt Profile
Capital Expenditure, Cash Flow and Debt Profile High Level Summary 2006 - 2008 2011 - 2013 $m 2009 (annual average) (annual average) Capital Expenditure 155 521 ~75 Operating Cash Flow 133 77 Ç Net Debt 471 382 È Gearing 35.7 25.9 È (net debt/debt+equity) % Ç = increase relative to 2006 - 2008 È = d
Slide 12: Mining Area C Iron Ore Royalty
Mining Area C Iron Ore Royalty Background Outlook • Mining Area C (MAC) covers a part of BHP • BHP has stated intentions to increase total iron ore output from WA BIlliton’s iron ore mining operations in WA’s to 350mtpa past 2015. MAC production at end of 2000 was ~40 Pilbara region, operated by BHP
Slide 13: Mining Area C Royalty
Mining Area C Royalty High Quality Iron Ore Exposure 2008 2009 % change Annual Production to 30 June MDMT 29.3 37.8 29.0 Sales Volume to 31 December MDMT 36.8 40.3 9.5 Royalty Income $m 50.8 42.6 (16.1) Capacity Payments $m 6.0 8.0 33.3 Iluka EBIT $m 56.4 50.2 (11.0) • 1.25% of A$ FOB revenue from A
Slide 14: Iluka Sales - Zircon
Iluka Sales - Zircon kt Zircon Sales 300 200 100 • China increasingly 0 important to zircon sales Asia China Europe Americas Other volumes -100 1H 2008 2H 2008 1H 2009 2H 2009 Change (2H 2008 to 2H 2009) • European market slow to recover over 2009 Change Sales Volumes 1H 2H 1H 2H (2H 2008 to 2H k to
Slide 15: Iluka Sales – Rutile and Synthetic Rutile
Iluka Sales – Rutile and Synthetic Rutile kt Rutile and Synthetic Rutile Sales 400 300 200 100 • Small growth in most 0 markets, second half 2009 Asia China Europe Americas Other versus second half 2008 -100 1H 2008 2H 2008 1H 2009 2H 2009 Change (2H 2008 to 2H 2009) • European markets remained down
Slide 16: Iluka Production and Sales
Iluka Production and Sales 2009 Supply Matched to Annual Demand Production 1H 2009 2H 2009 2009 Total Variance from 2008 k tonnes Zircon 165 98 263 (122) Rutile 64 63 127 (13) Synthetic Rutile 239 166 405 (62) Total 468 327 795 (197) Sales Volumes 1H 2009 2H 2009 2009 Total Variance from 2008 k tonn
Slide 17: Zircon Demand
Zircon Demand Consumption Accelerated by Developing/Urbanising Economies Global Zircon Consumption CAGR since 1990 is 3.4% while China’s CAGR is 17.2% Zircon Consumption Trends Rest of World vs China Growth Zircon (kt) 1.4 Zircon Demand Growth World China Rest of World 1990-08 CAGR • Demand 3.4% CAG
Slide 18: Pigment Demand
Pigment Demand Intensity of Use is GDP-linked China’s pigment consumption CAGR since China Pigment Intensity of Use (per capita cf USA) 1990 is 18.9% compared to the rest of world China’s pigment use per person is 20% of US levels of 1.8% 100% Rest of World vs China Pigment Demand Pigment (mt) 80% 6
Slide 19: Industry Zircon:TiO2 Ratio
Industry Zircon:TiO2 Ratio Despite Advent of Jacinth-Ambrosia, Industry Z:TiO2 Ratio Remains Stable mt of TiO2 or Zircon Ratio t Zircon/t TiO2 7.0 0.35 TiO2 Historical Supply Zircon Historical Supply 6.0 0.3 Zircon/TiO2 Ratio All 5.0 Feedstock Producers 0.25 (including J-A) 4.0 0.2 3.0 0.15 Zircon/T
Slide 20: Mineral Sands Supply
Mineral Sands Supply Main Characteristics Inducement of New Supply • Iluka undertakes inducement analysis of all known Project Ranking – Illustrative Inducement Analysis mineral sands projects • Analysis suggests prices would need to be significantly higher to warrant support for all but a Rutile Pr
Slide 21: Zircon Supply
Zircon Supply Supply Crunch Near Term? Zircon Supply • Few material new zircon sources Induced New Projects at 0%, 25% and 50% Zircon - primary contribution from existing suppliers price rises (on 2008 levels) • Even with advent of Jacinth-Ambrosia, relative 1800 ktpa industry zircon:Ti02 production
Slide 22: High Grade Titanium Dioxide Supply
High Grade Titanium Dioxide Supply Supply Crunch Near Term? High Grade Titanium Dioxide Supply Induced New Projects at 0%, 25% and 50% Rutile price rises (on 2008 levels) • Significant price increases required to induce ktpa supply 3500 Current Producers No price rise • Even with 50% price increase
Slide 23: Mineral Sands Market Conditions – Zircon 2010
Mineral Sands Market Conditions Zircon – 2010 • Zircon demand across all main markets rebounded strongly in first quarter − uncontracted bulk shipments to Europe − steady improvement in North American market − continued strong demand in China • Iluka advised customers of 1st of at least 2 price incr
Slide 24: Mineral Sands Market Conditions – High Grade Titanium Dioxide
Mineral Sands Market Conditions High Grade Titanium Dioxide – 2010 • Rutile and synthetic rutile demand increased during the first quarter − buoyant demand from the US and Europe for high grade feedstocks • Iluka expects high grade titanium dioxide sales to remain constrained by production • Evident
Slide 25: Iluka Outlook
Iluka Outlook Confluence of Positive Factors • Transition to high quality long life production operations almost complete • Additional high margin zircon and rutile production over the next 3 years • Tight industry supply conditions for high grade titanium dioxide and zircon − Iluka’s inducement ana
Slide 26: Closing Slide
Closing Slide Iluka Resources Limited Closing Statement For further information, contact: Robert Porter, General Manager, Investor Relations [email protected] +61 3 9225 5481 Iluka’s website www.iluka.com
Iluka Resources — Bank of America Global Metals and Mining Conference 2010 on 6ix