Ivanhoe Mines Ltd. Class A · TSX:IVN

Ivanhoe Mines Ltd. Class A — Investor Presentation (December 2018)

50 slides from Ivanhoe Mines Ltd. Class A's investor presentation, December 2018

  1. Slide 1: Ivanhoe Mines Corporate Presentation December 2018

    December 2018 Bottom of the box cut for Platreef’s Shaft 2, showing the 10-metre-diameter outline for the planned shaft

  2. Slide 2: Forward-looking statements & Qualified Person

    Forward-looking statements & Qualified Person Certain statements in presentation constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws, including, without limitation, the timing and results of: (i) statements regarding the ongoing d

  3. Slide 3: Kamoa-Kakula, Platreef and Kipushi projects

    KAMOA-KAKULA Initial development of two mining areas on world’s 4th-largest copper discovery Democratic Republic of Congo’s Central African Copperbelt PLATREEF KIPUSHI Ultra-high-grade Mine projected to be historic mine being Africa’s lowest-cost producer upgraded to produce of platinum-group metals

  4. Slide 4: Platreef discovery & mine development

    Platreef discovery & mine development South Africa 4

  5. Slide 5: Platreef Shaft 1 reached 850 metres below surface

    December 18, 2018: Platreef’s Shaft 1 reached a depth of 850 metres below surface after intersecting 29 metres of high-grade Flatreef mineralization. Shaft 1 is expected to reach its projected, final depth of 980 metres below surface in early 2020 5

  6. Slide 6: Platreef long-term processed wastewater agreement finalized

    December 18, 2018: Platreef’s long-term processed wastewater agreement finalized to supply most of the bulk water needed for the first phase of production Dr. Patricia Makhesha, Ivanplats’ Managing Director (left), and Kenneth Maluleke, Mogalakwena Acting Municipality Manager, finalize Platreef’s lo

  7. Slide 7: Platreef underground team excavating rock at Shaft 1

    Members of Platreef’s underground mining team using a “cactus grab” mucker to excavate broken rock from the bottom of Shaft 1 7

  8. Slide 8: Miners on Shaft 1's 750-metre level

    Miners on Shaft 1’s 750-metre level. The 750-metre and 850-metre stations will provide initial, underground access to the high-grade orebody 8

  9. Slide 9: Platreef Shaft 2 box cut alongside Shaft 1 headframe

    Platreef’s Shaft 2 box cut (now completed to a depth of 29 metres) alongside Shaft 1 headframe. Construction of the concrete hitch (foundation) for Shaft 2 now is underway 9

  10. Slide 10: Geotechnical engineers inspecting Shaft 2 box cut walls

    Platreef’s geotechnical engineers inspecting the 29-metre-high walls of Shaft 2’s box cut 10

  11. Slide 11: Shaft 2 concrete headframe and hoisting facilities

    Two cut-away perspectives of Shaft 2’s 103-metre-tall concrete headframe and internal permanent hoisting facilities 11

  12. Slide 12: Definitive feasibility study issued for Platreef Project

    July 31, 2017: Definitive feasibility study issued for Platreef Project  First phase envisages annual throughput rate of four million tonnes of ore per year, producing 476,000 ounces of platinum, palladium, rhodium and gold (3PE+Au), plus 33 million pounds of nickel and copper.  Projected to be Af

  13. Slide 13: Platreef at the bottom of the cash-cost curve

    Platreef’s potential US$351 per 3PE+Au ounce (net of base-metal by-products) at the bottom of the world’s cash-cost curve $1,600 $1,400 $1,200 Ivanhoe’s Platreef Project at the bottom $1,000 of the cash-cost curve. $800 $600 $400 $200 $0 3PE+Au oz production Platreef 4Mtpa FS Northern limb Zimbabwe

  14. Slide 14: Platreef would be the world's largest PGM mine

    At 12 million tonnes of ore per year, Platreef would be the world’s largest platinum-group metals mine 1,400 Platreef Phase 3 (12 Mtpa) Ni + Cu + Cr production (eq. Pt oz) 1,200 Ir + Ru production (eq. Pt oz) 1,000 Platreef Phase 2 (8 Mtpa) 4E production (eq. Pt oz) 800 Platreef Phase 1 (4 Mtpa) 600

  15. Slide 15: Platreef B-BBEE partnership a top performer

    Platreef's B-BBEE partnership a top performer in South Africa’s platinum sector Platreef 26% ownership stake by Black Economic Empowerment (BBE) partners is one of the broadest empowerment transactions ever settled in South African mining. • 20% held by a trust to benefit 20 local host communities,

  16. Slide 16: Kamoa & Kakula: Development of two mining areas

    Kamoa & Kakula: Development of two mining areas; ongoing exploration Democratic Republic of Congo 16

  17. Slide 17: Kamoa-Kakula world's fourth-largest copper discovery

    February 2018: A new resource estimate established Kamoa-Kakula as the world’s fourth-largest copper discovery. Copper grades at the two adjacent deposits are the highest, by a wide margin, of the world’s top 10 copper deposits. 17

  18. Slide 18: 12 million hours without lost-time injuries

    December 2018: Kamoa-Kakula employees and contractors celebrating their outstanding workplace achievement of logging a total of 12 million hours without any lost-time injuries 18

  19. Slide 19: Indicated Mineral Resources, Kamoa-Kakula Project, February 2018

    Indicated Mineral Resources, Kamoa-Kakula Project, February 2018 Cut-off Contained Contained Tonnes Area Copper Category Grade Copper Copper (millions) (Sq. km) Grade (Cu%) (kTonnes) (billion lbs) Indicated 3.0 396 33.2 4.79% 19,000 41.8 Indicated 2.5 535 44.0 4.25% 22,800 50.2 Indicated 2.0 780 53.

  20. Slide 20: Kamoa-Kakula Mining Licence and Western Foreland licences

    Kamoa-Kakula Mining Licence and the adjacent Western Foreland exploration licences 20

  21. Slide 21: Kamoa, Kakula and Kakula West resource areas

    Kamoa, Kakula and Kakula West Indicated and Inferred Mineral Resource areas, with existing power and rail infrastructure 21

  22. Slide 22: Among the world's largest copper deposits with highest grades

    Among the world’s largest copper deposits, Kamoa-Kakula also has the highest copper grades Measured & Indicated Resource and Grade Inferred Resource and Grade 150 3.0% Contained Copper (Mt) 125 2.5% Copper Grade (%) 100 2.0% 75 1.5% 50 1.0% 25 0.5% - - Source: Wood Mackenzie *Note: Selected based on

  23. Slide 23: Largest undeveloped copper deposit in the world

    Kamoa-Kakula is the largest undeveloped copper deposit in the world 45 Measured & Indicated Resource and Grade Inferred Resource and Grade 3.0% 40 Contained Copper (Mt) 2.5% Copper Grade (%) 35 30 2.0% 25 1.5% 20 15 1.0% 10 0.5% 5 - - Source: Wood Mackenzie *Note: Contained copper in undeveloped dep

  24. Slide 24: Kakula and Kakula West discovery areas grades

    Kakula and Kakula West discovery areas showing grades of Indicated and Inferred Mineral Resource blocks at a 3% copper cut-off Kakula declines Kakula box cut 24

  25. Slide 25: Exploration drilling extending Kakula West discovery

    Exploration drilling is continuing to extend the northwestern limits of the Kakula West discovery 25

  26. Slide 26: Brick-making supported by Sustainable Livelihoods Program

    Brick-making operations at Kamoa-Kakula, supported by the Kamoa Copper Sustainable Livelihoods Program 26

  27. Slide 27: Bornite core at Kamoa North prospect

    Drillers displaying a core box of visual bornite (a high tenor copper mineral) in a recent drill hole in the Kamoa North prospect area Exploration drilling at Kamoa North has delineated two new, continuous corridors containing zones of shallow, thick, high-grade copper mineralization. 27

  28. Slide 28: Geological workshop with Kamoa-Kakula exploration team

    David Broughton, Ivanhoe Mines’ Senior Advisor, Exploration and Geology (centre, kneeling), using samples of drill core as part of a geological workshop with members of the Kamoa- Kakula exploration team and geology students from several universities in the DRC. Mr. Broughton led Ivanhoe’s 2008 disc

  29. Slide 29: Ivanhoe Mines and Zijin Mining at Kakula southern box cut

    Members of senior management from Ivanhoe Mines and Zijin Mining at the new box cut on the southern side of the Kakula Deposit 29

  30. Slide 30: Construction at Kakula southern box cut and second decline

    Construction underway at Kakula’s southern box cut and a second decline to provide access to the high- grade copper on the southern side of the Kakula Deposit 30

  31. Slide 31: Development options

    Development options Up to three mines, each 6 million tonnes a year, with central concentrator! That would be 18 million tonnes of ore each year! 1. Kakula mining area − being fast-tracked to production with capacity of 6 million tonnes of ore per year (Mtpa). 2. Kansoko mining area (at Kamoa) − dev

  32. Slide 32: Kamoa-Kakula PEA long-term development plan

    Kamoa-Kakula PEA long-term development plan Source: OreWin 2017 32

  33. Slide 33: 2025 top producing mines by paid copper production

    2025 top 20 producing mines by paid copper production Paid Copper Production (ktpa) Note: Kamoa-Kakula production based on projected peak copper production (which occurs in year nine) of the 12 Mtpa development plan for the Kamoa-Kakula Project as detailed in the Kakula 2017 PEA. Source: Wood Macken

  34. Slide 34: Top largest new greenfield projects

    Top 10 largest new greenfield projects (Nominal production and head grade) First tenyears’ First 10 years average grade average grade 400 7.0% 350 6.0% 300 5.0% 250 4.0% 200 3.0% 150 100 2.0% 50 1.0% -- -- Nominal Production (kt/a) Copper Resource Grade (%Cu) Note: Top 10 largest new greenfield copp

  35. Slide 35: Mwadingusha hydroelectric plant upgrade

    Mwadingusha hydroelectric plant upgrade  Mwadingusha is the first of three hydroelectric power plants in the DRC being upgraded by Ivanhoe, Zijin and SNEL to secure a supply of clean, sustainable electricity for the development of Kamoa-Kakula.  Its output has tripled, to 32 megawatts (MW), and sh

  36. Slide 36: Fish ponds teaching aquaculture skills to local communities

    Nine fish ponds near Kamoa-Kakula are designed to teach aquaculture skills to local communities, help enhance nutrition, and provide opportunities for earning additional income 36

  37. Slide 37: Kaponda secondary school opening

    The opening assembly for the new Kaponda secondary school constructed by Kamoa Copper in a local community near the Kamoa-Kakula Project 37

  38. Slide 38: Core from recent drilling at the Makoko Discovery

    Core from recent drilling at the Makoko Discovery 38

  39. Slide 39: Ivanhoe announces the Makoko Copper Discovery

    October 1, 2018: Ivanhoe announces the Makoko Copper Discovery on its 100%-owned Western Foreland licences  Ivanhoe’s third Selected drill holes at the Makoko Discovery: major copper discovery in the DRC. The licence area remains open.  Makoko’s high- grade copper shows characteristics identical t

  40. Slide 40: Makoko shows characteristics identical to Kamoa-Kakula

    Makoko high-grade copper shows characteristics identical to tier-one Kamoa-Kakula Discoveries 40

  41. Slide 41: Makoko drilled over 4.5 by 1.5 kilometres and remains open

    Makoko has been drilled over an area measuring 4.5 kilometres by 1.5 kilometres and remains open 41

  42. Slide 42: Exploration rig drilling at the Makoko Discovery

    An exploration rig drilling at the Makoko Discovery on Ivanhoe's 100%-owned Western Foreland licences 42

  43. Slide 43: Kipushi Mine development & upgrading

    Kipushi Mine development & upgrading for a new era Democratic Republic of Congo 43

  44. Slide 44: Kipushi Fault Zone and Big Zinc

     Kipushi Fault Zone was mined 1924-1993 to approx. 1,150-metre level.  Big Zinc discovered prior to 1993 closure; never mined. 44

  45. Slide 45: Pre-feasibility study for Kipushi zinc-copper mine

    December 13, 2017: Ivanhoe announced a pre-feasibility study for the rebirth of the historic Kipushi zinc-copper-silver-germanium mine The planned return to production would establish Kipushi as the world’s highest-grade major zinc mine. 45

  46. Slide 46: Primary rock crusher 1,150 metres underground

    Primary rock crusher 1,150 metres underground, ready for operation 46

  47. Slide 47: Refurbished Shaft 4 conveyor tower

    The recently refurbished Shaft 4 conveyor tower, one of the surface infrastructure upgrading projects now underway at Kipushi 47

  48. Slide 48: Engineers monitoring air quality at Kipushi ventilation shaft

    Engineers monitoring air-quality readings at one of Kipushi’s ventilation shafts 48

  49. Slide 49: Local students receiving scholarships from Kipushi Project

    Students from a local high school who receive scholarships and bursaries awarded by the Kipushi Project 49

  50. Slide 50: Thank you

    Thank you IVANHOEMINES NEW HORIZONS

Ivanhoe Mines — Investor Presentation (December 2018) on 6ix