  1. Slide 1: Community Consultative Committee Peppertree Quarry & Marulan South Limestone

    Click to edit Master title style Subheader Community Consultative Committee Peppertree Quarry & Marulan South Limestone November 2022

  2. Slide 2: Agenda

    AGENDA 1. Welcome and introductions 2. Confirmation of minutes and actions 3. Business arising 4. Correspondence 5. Operations over the last 3 months 6. Environmental performance a. Incidents b. Complaints c. Air d. Noise e. Blast f. Water – surface and ground g. Heritage h. Ecology 7. Stakeholder E

  3. Slide 3: Welcome and apologies

    01 Welcome and apologies

  4. Slide 4: Confirmation of minutes

    O2 — Confirmation of minutes

  5. Slide 5: Business arising

    03 Business arising • Circulate link for 2021 PTQ AEMR

  6. Slide 6: Correspondence Jul 2022 – Nov 2022

    04 Correspondence Jul 2022 – Nov 2022

  7. Slide 7: Peppertree Quarry correspondence

    Peppertree Quarry Department of Planning and Environment Submission of Rehab Bond calculation EPA Nil Resource Regulator Lifting equipment Explosives Goulburn Mulwaree Council Council visit Geoff Clark weather data reviews – weather station monthly reviews Peppertree Quarry & Marulan South Limestone

  8. Slide 8: Marulan South Limestone correspondence

    Marulan South Limestone Department of Planning and Environment • Assessing Environmental Management Plans (EMP's) EPA • Environmental Protection Licence will be amended upon approval of EMP's Resource Regulator • Mine and dump stages for Rehabilitation Management Plan (RMP) have been drafted. Waitin

  9. Slide 9: Operations Past 3 months

    05 Operations Past 3 months

  10. Slide 10: Peppertree Quarry

    Peppertree Quarry Safety LTI/MTI Overburden Overburden is being stripped focusing in a Southerly direction circa 1.5 million m3 has been moved. Pit Update Contract crushing, conveyor re-alignment (CV110) Processing (STQ) Some rail disruptions due to rail contractor industrial action. Temporary appro

  11. Slide 11: Marulan South Limestone

    Marulan South Limestone Safety Focus on training, including safety focus seminars and workshops, safety supervision and specific hazard training eg. electrical awareness and train shunting. Overburden Stripping Overburden Overburden Stripping has been progressing at a steady 375,000t/month and will

  12. Slide 12: Environmental Performance

    06 Environmental Performance

  13. Slide 13: Environmental Performance Peppertree Quarry

    06.1 Environmental Performance Peppertree Quarry

  14. Slide 14: Environmental Incidents Jan 2017 to Nov 2022

    Environmental Incidents Jan 2017 to Nov 2022 ˃ Aug- nil Sep- nil Oct- nil (1 x localised oil spill) Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 14

  15. Slide 15: Environmental Complaints Jan 2017 to Nov 2022

    Environmental Complaints Jan 2017 to Nov 2022 ˃ Aug- nil Sept- nil Oct- nil Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 15

  16. Slide 16: Air – Dust deposition Gauge D1

    Air – Dust deposition Gauge D1 Peppertree Quarry Deposited Dust 2017 - 2022 Onsite (NW boundary) 30 25 g/m2/month 20 15 10 5 0 rolling Annual… Jul-2018 Jul-2022 Jul-2017 Jul-2019 Jul-2020 Jul-2021 Mar-2019 Mar-2017 Mar-2018 Mar-2020 Mar-2021 Mar-22 May-2017 May-2020 May-2018 May-2019 May-2021 May-22

  17. Slide 17: Air – Dust Deposition Gauge D2

    Air – Dust Deposition Gauge D2 Peppertree Quarry Deposited Dust 2017 - 2022 683 Marulan South Road 10.00 9.00 g/m2/month 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 rolling Annual… Mar-2017 Mar-2018 Mar-2019 Mar-2020 Mar-2021 May-2020 May-2022 May-2017 May-2018 May-2019 May-2021 Jul-2021 Jul-2017 J

  18. Slide 18: Air – Dust Deposition Gauge D3

    Air – Dust Deposition gauge D3 Peppertree Quarry Deposited Dust 2017 - 2022 432 Long Point Road, Tallong 20 18 g/m2/month 16 14 12 10 8 6 4 2 0 rolling Annual… Jul-2017 Jul-2021 Jul-2018 Jul-2019 Jul-2020 Jul-2022 Mar-2017 Mar-2020 Mar-2018 Mar-2019 Mar-2021 Mar-22 May-2017 May-2020 May-2018 May-201

  19. Slide 19: Air – PM10 annual average

    ug/m3 In compliance 10.00 25.00 30.00 15.00 20.00 35.00 5.00 0.00 6/01/2019 30/01/2019 17/02/2019 19/03/2019 18/04/2019 18/05/2019 17/06/2019 17/07/2019 Annual Average goal of 25ug/m3 16/08/2019 15/09/2019 15/10/2019 14/11/2019 Annual average below goal at the boundary 14/12/2019 13/01/2020 12/2/202

  20. Slide 20: Air – PM10 24 Hour performance

    ug/m3 50 0 250 300 350 100 150 200 6/01/2019 24/01/2019 In compliance 11/02/2019 1/03/2019 25/03/2019 18/04/2019 12/05/2019 5/06/2019 24 hour goal of 50ug/m3 29/06/2019 23/07/2019 16/08/2019 9/09/2019 3/10/2019 27/10/2019 20/11/2019 14/12/2019 Annual average below goal at the boundary 7/01/2020 31/0

  21. Slide 21: Air – Total Suspended Particulates

    100.00 200.00 300.00 400.00 500.00 600.00 0.00 4/1/17 9/02/2017 In compliance 17/03/2017 22/04/2017 28/05/2017 3/07/2017 8/08/2017 13/09/2017 19/10/2017 24/11/2017 Annual Average goal of 90ug/m3 30/12/2017 4/02/2018 12/03/2018 17/04/2018 23/05/2018 Annual average below goal at the boundary 28/06/201

  22. Slide 22: Air – PM2.5

    0.00 5.00 25.00 30.00 35.00 10.00 15.00 20.00 40.00 45.00 2/6/2021 2/20/2021 3/6/2021 3/20/2021 4/3/2021 4/17/2021 5/1/2021 Air – PM2.5 5/15/2021 In compliance for the past 3 months. 5/29/2021 6/12/2021 6/26/2021 7/10/2021 7/24/2021 8/7/2021 8/21/2021 9/4/2021 9/18/2021 Peppertree Quarry & Marulan S

  23. Slide 23: Noise – quarterly monitoring

    Noise – quarterly monitoring Monitoring was undertaken over 29th, 30th, and 1st June/July 2022, 30th, 31st and 1st August/September Results for the June/July and August/September round are in compliance. Next round due in December. Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environm

  24. Slide 24: Blasting - Overpressure

    Blasting - Overpressure 140 OVER PR ESSUR E 2021-2022 120 100 80 60 40 20 criteria 1 criteria 2 north west boundary north east boundary 683 Marulan sth road Pace 0 In Compliance Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 24

  25. Slide 25: Blasting – ground Vibration

    Blasting – ground Vibration Vibration 2021-2022 12 10 8 6 4 2 0 criteria 1 criteria 2 north west boundary north east boundary 683 Marulan sth road Pace In Compliance Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 25

  26. Slide 26: Surface Water

    Surface Water Quarterly monitoring round undertaken in July – September 2022 with sampling on Thursday 18th August 2022 No issues with water supply or quality over the last 3 months Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 26

  27. Slide 27: Surface water - pH

    Surface water - pH Peppertree Water Samples pH 2012 to 2022 10 9.5 9 8.5 8 pH 7.5 7 6.5 6 5.5 5 T1 dam lower criteria (6.5) higher criteria (8.5) MSth creek U1 barbers creek Within guideline for August samples with the Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Perform

  28. Slide 28: Surface water - Turbidity

    Surface water - Turbidity Peppertree water samples - Turbidity 2012 - 2022 300 250 200 150 NTU 100 50 0 T1 Main dam ANZECC guideline U1 MSth creek Below guideline for August samples Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 28

  29. Slide 29: Surface water – Total dissolved solids

    Surface water – Total dissolved solids Peppertree water samples - Turbidity 2012 - 2022 300 250 200 150 NTU 100 50 0 T1 Main dam ANZECC guideline U1 MSth creek Below guideline for August samples Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 29

  30. Slide 30: Surface water – total Phosphorus

    Surface water – total Phosphorus Peppertree Quarry Total Phosphorus (mg/l) 2012 - 2022 0.6 0.5 0.4 m g/l 0.3 0.2 0.1 0 T1 dam marulan sth creek trigger U1 barbers creek Below guideline for August samples Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 30

  31. Slide 31: Surface water - Total Nitrogen

    Surface water - Total Nitrogen Peppertree Quarry Total Nitrogen (mg/l) 2014 to 2022 12 10 8 m g/l 6 4 2 0 T1 dam marulan sth creek trigger U1 barbers creek Below guideline for August samples with exception of main dam and T1 Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental P

  32. Slide 32: Environmental Flow

    Environmental Flow year total in flow 10% total out flow in compliance comment Aug-2021 18 1.8 166.28 yes Rainfall - possible overflow of the V notch weir Sept-2021 5 0.5 7.3 yes Oct-2021 0.5 0.05 3.07 yes Nov-2021 42.6 4.26 936.71 yes Rainfall - possible overflow of the V notch weir Dec-2021 19.9 1

  33. Slide 33: Ground water

    Ground water ˃ Monitoring conducted in May 2022 and September 2022. ˃ May results all good, waiting on September results. ˃ Results show no changes to the groundwater Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 33

  34. Slide 34: Ground water – water levels

    Ground water – water levels Standing Water Levels Groundwater 2016 - 2022 615.00 610.00 605.00 600.00 595.00 mAHD 590.00 585.00 580.00 575.00 570.00 565.00 560.00 555.00 550.00 8/18/2016 6/14/2017 9/22/2017 4/10/2018 7/19/2018 5/15/2019 8/23/2019 12/1/2019 3/10/2020 6/18/2020 9/26/2020 4/14/2021 7/2

  35. Slide 35: Heritage

    Heritage Artefact analysis due to start in the coming weeks. Approximately 65 000 artefacts have been returned to country in September Reconciliation week activity being developed onsite, potential artwork in courtyard and artefact display for staff Scar tree relocation being planned, currently unde

  36. Slide 36: Ecology

    Ecology Three year plan developed for ongoing rehabilitation and maintenance - 16.5ha of tree planting in spring - 5km of direct seeding in spring - Approx 80 000m2 hydromulched Rapid Visual Assessment + Weed assessment and ecological assessment to take place in November Weed management undertaken i

  37. Slide 37: Environmental Performance Marulan South Limestone

    06.2 Environmental Performance Marulan South Limestone

  38. Slide 38: Air – Dust deposition Site 1

    Air – Dust deposition Site 1 Annual Average goal of 4gm2/month In compliance Annual average below goal at the boundary Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 38

  39. Slide 39: Air – Dust deposition Site 2

    Air – Dust deposition Site 2 Annual Average goal of 4gm2/month In compliance Annual average below goal at the boundary Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 39

  40. Slide 40: Air – PM10 annual average

    ug/m3 In compliance 10.00 25.00 30.00 15.00 20.00 35.00 5.00 0.00 6/01/2019 30/01/2019 17/02/2019 19/03/2019 18/04/2019 18/05/2019 17/06/2019 17/07/2019 Annual Average goal of 25ug/m3 16/08/2019 15/09/2019 15/10/2019 14/11/2019 Annual average below goal at the boundary 14/12/2019 13/01/2020 12/2/202

  41. Slide 41: Air – PM10 24 Hour performance

    ug/m3 50 0 250 300 350 100 150 200 6/01/2019 24/01/2019 In compliance 11/02/2019 1/03/2019 25/03/2019 18/04/2019 12/05/2019 5/06/2019 24 hour goal of 50ug/m3 29/06/2019 23/07/2019 16/08/2019 9/09/2019 3/10/2019 27/10/2019 20/11/2019 14/12/2019 Annual average below goal at the boundary 7/01/2020 31/0

  42. Slide 42: Air – Total Suspended Particulates

    100.00 200.00 300.00 400.00 500.00 600.00 0.00 4/1/17 9/02/2017 In compliance 17/03/2017 22/04/2017 28/05/2017 3/07/2017 8/08/2017 13/09/2017 19/10/2017 24/11/2017 Annual Average goal of 90ug/m3 30/12/2017 4/02/2018 12/03/2018 17/04/2018 23/05/2018 Annual average below goal at the boundary 28/06/201

  43. Slide 43: Air – PM2.5

    0.00 5.00 25.00 30.00 35.00 10.00 15.00 20.00 40.00 45.00 2/6/2021 2/20/2021 3/6/2021 3/20/2021 4/3/2021 4/17/2021 5/1/2021 Air – PM2.5 5/15/2021 In compliance for the past 3 months. 5/29/2021 6/12/2021 6/26/2021 7/10/2021 7/24/2021 8/7/2021 8/21/2021 9/4/2021 9/18/2021 Peppertree Quarry & Marulan S

  44. Slide 44: Blasting - Overpressure

    Blasting - Overpressure In Compliance Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 44

  45. Slide 45: Blasting – ground Vibration

    Blasting – ground Vibration In Compliance Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 45

  46. Slide 46: Surface Water

    Surface Water Surface water monitoring is undertaken biannually with sampling due in November 2022 which will be presented at the next CCC meeting. Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 46

  47. Slide 47: Ground water

    Ground water ˃ We are currently awaiting results which will be displayed at the next CCC meeting. Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 47

  48. Slide 48: Ecology

    Ecology Currently Rehabilitating the Western Overburden Elevation Peppertree Quarry & Marulan South Limestone Mine CCC item 6 Environmental Performance 48

  49. Slide 49: Stakeholder Engagement

    07 Stakeholder Engagement

  50. Slide 50: Community engagement activities

    Goulburn Mulwaree Council community bike ride Tallong public school numeracy award Tallong skate park Pejar Local Aboriginal Land council yarning circle Peppertree Quarry & Marulan South Limestone Mine CCC item 7 Stakeholder Engagement 50

  51. Slide 51: Operations Next 3 months

    O8 - Operations Next 3 months

  52. Slide 52: Peppertree Quarry

    Peppertree Quarry Safety Focus on the "life saving commitments"- particular focus on one per month Overburden Continue to strip in a Southerly direction. Pit Update Metso has been realigned to follow overburden stripping in a Southerly direction Processing (STQ) Continue to supply aggregates and san

  53. Slide 53: Marulan South Limestone

    Marulan South Limestone Overburden Safety Placement Focus on the behavioural safety. Overburden Overburden Stripping Overburden placement to begin, post final management plan approval, extending the western emplacement and adjacent to lime plant Pit Update Also waiting on final approval of managemen

  54. Slide 54: General Business

    O9 - General Business

  55. Slide 55: Other

    Other Peppertree Quarry & Marulan South Limestone Mine CCC item 9 General Business 55

  56. Slide 56: Next meeting Jan 2023

    Next meeting Jan 2023 BCORAL

  57. Slide 57: Thanks for your participation