Glencore Plc · LSE:GLEN

Glencore — Investor Day (December 2014)

19 slides from Glencore's investor day presentation, Dec 10, 2014

  1. Slide 1: Investor Day

    Zinc ingot, Asturiana de Zinc, Spain Investor Day 10 December 2014 08:00 - Welcome and Overview | Ivan Glasenberg 08:20 - Finance Update | Steven Kalmin 08:45 - Copper | Telis Mistakidis 09:15 - Coal | Tor Peterson & Peter Freyberg 09:45 - Break 10:05 - Zinc | Daniel Maté & Chris Eskdale 10:35 - Nic

  2. Slide 2: Forward looking statements

    Forward looking statements This document contains statements that are, or may be deemed to be, “forward looking statements” which are prospective in nature. These forward looking statements may be identified by the use of forward looking terminology, or the negative thereof such as "plans", "expects

  3. Slide 3: Zinc

    Removing dross from top of furnace, CEZ zinc refinery, Canada Zinc Daniel Maté, Chris Eskdale

  4. Slide 4: Zinc summary

    Zinc summary Zinc market fundamentals remain strong and continue to improve Our industry leading zinc business combines world class zinc assets with our marketing reach and expertise Unique combination of mines and smelters in a single company • mined production of 1.4Mt in 2013 rising to 1.6Mt by 2

  5. Slide 5: Global zinc market

    Concentrate loading facility for McArthur River zinc mine, Australia Global zinc market

  6. Slide 6: World zinc metal consumption 2012A – 2019F

    World zinc metal consumption 2012A – 2019F • Consumption growth in 2012-2014 has been c.3.7% y-o-y • 2014 is expected to be in a deficit of 260-270kt • Stocks (LME + SHFE and bonded warehouse in China) have declined for each of the last 12 consecutive quarters • This translates to incremental metal

  7. Slide 7: Where will these units come from?

    Where will these units come from? 7

  8. Slide 8: Concentrates requirement, production and deficit outlook

    Concentrates requirement, production and deficit outlook • Approximately additional 3Mt of zinc in concentrates is needed in the next 5 years to meet forecast metal demand (and balance the current c.260-270kt metal deficit) • Non-Chinese mine production is forecast to add a net 600-650kt of zinc in

  9. Slide 9: Chinese mine production

    Chinese mine production • During the last 10 years, Chinese mine production has on average increased 225kt per year • To meet global zinc metal demand, Chinese mine production would need to increase by c.2-2.5Mt of zinc in concentrates over the next 5 years – an average of c.450-500kt per year Annua

  10. Slide 10: Mine deficit can only partially be covered by available stock

    Mine deficit can only partially be covered by available stock • Assuming Chinese mine production increases c.210-220kt per year, there will be a global deficit of c.1.0-1.5Mt of zinc in concentrates over the forecast period • Deficit of concentrates will result in drawdown of metal stocks • 2014 for

  11. Slide 11: Price is closely correlated to available stock levels

    Price is closely correlated to available stock levels • Historically, zinc prices have responded to the upside as the “stocks:consumption” ratio approaches 3 weeks of zinc metal consumption LME zinc price ($/t) vs stocks to consumption ratio (weeks) 3,500 LME Zn price $/t 0.4 Inverse weeks 0 0.7 sto

  12. Slide 12: Zinc metal stocks outlook

    Zinc metal stocks outlook • Stocks are forecast to fall below the critical “stocks:consumption” inflection point of 3 weeks consumption Sensitivity of zinc metal stocks to global zinc demand 5 Weeks consumption Inflection point Feb 2016 Apr 2016 Oct 2016 4 3 2 1 0 2014F 2015F 2016F 2017F 2018F 2019F

  13. Slide 13: Zinc industrial overview

    McArthur River zinc mine metallurgical plant, Australia Zinc industrial overview

  14. Slide 14: Glencore zinc assets

    Glencore zinc assets Industrial assets comprise: 24 mines, 7 zinc smelters, 6 lead smelters/refineries with operations and assets in 12 countries and key marketing offices spread across 5 continents, ~50k employees 14

  15. Slide 15: A large long-life, low-cost, optimised asset base

    A large long-life, low-cost, optimised asset base Expansions – delivery of 3 Australian projects Illustrative Zinc C1 cash cost curve • capex spend on budget • Lady Loretta project ahead of schedule “Steady State” operations • benchmarking and subsequent cost reduction/turnaround projects – savings

  16. Slide 16: Forecast zinc mine production profile

    Forecast zinc mine production profile Own source contained zinc mine production (kt zinc) 1,800 1,620 1,640 1,580 1,600 1,399 1,380 1,400 1,200 1,000 800 600 400 200 0 2013A 2014F 2015F 2016F 2017F Australia Kazzinc North America Antamina Other Zinc Glencore Smelting Capacity Source: Glencore, smelt

  17. Slide 17: Australian expansion projects update

    Australian expansion projects update Mt Isa Operations: Rock bolting, Lady Loretta mine • Capital cost of US$245M for new hoisting shaft and associated infrastructure • Nov 2014 run-rate of 4.3Mtpa ore mined • Hoist commissioning anticipated in Q1 2015 • Sustainable 4.5Mtpa ore mined run rate by Q2

  18. Slide 18: Conclusion

    Conclusion • Zinc market fundamentals remain strong and continue to improve • Our industry leading zinc business combines world class zinc assets with our marketing reach and expertise • unique combination of mines and smelters in a single company • industrial assets fully integrated into global mar

  19. Slide 19: Q&A

    George Fisher underground mine shift change, Australia Q&A

Glencore — Investor Day (December 2014) on 6ix