Aya Gold & Silver Inc. · TSX:AYA

Aya Gold & Silver — Investor Presentation (November 2026)

62 slides from Aya Gold & Silver's investor presentation, November 2026

  1. Slide 1: Unlocking Silver Value in Morocco

    Unlocking Silver Value in Morocco INVESTOR PRESENTATION NOVEMBER 2026 TSX: AYA | NASDAQ: AYA

  2. Slide 2: Important Information

    IMPORTANT INFORMATION Forward-Looking Statements This presentation contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide informatio

  3. Slide 3: Important Information

    IMPORTANT INFORMATION Aya’s growth strategy; Aya’s ability to obtain and maintain insurance; occupational health and safety risks; adverse publicity risks; third party risks; disruptions to Aya’s business operations; Aya’s reliance on technology and information systems; litigation risks; interest an

  4. Slide 4: Aya Gold & Silver | Company Overview

    Aya Gold & Silver | Company Overview WHO WE ARE A Silver Producer Focused Exclusively on Morocco. • Silver Producer: the Zgounder Silver Mine, one of the world's highest-grade primary silver operations • Polymetallic Asset Development: Boumadine - gold-led (~60% Au / 30% Ag) • First-mover advantage

  5. Slide 5: Proven Management Team

    Aya Gold & Silver | Proven Management Team Benoit La Salle, FCPA, MBA Mustapha Elouafi Ugo Landry-Tolszczuk Elias J. Elias President & CEO, Director President-Managing Director, Morocco Chief Financial Officer Chief Legal and Sustainability Officer Benoit has over 30 years of experience developing a

  6. Slide 6: Capital Structure | Strong Balance Sheet

    Capital Structure | Strong Balance Sheet Market Data and Capital Structure Ownership 2 Analyst Coverage All data in USD - unless otherwise noted Beacon Securities Exchanges TSX: AYA | NASDAQ: AYA Board & Management 6% BMO Capital Markets Shares – Basic (Nov 11, 2026) 144.2M Family Offices* 38% Canto

  7. Slide 7: Value Opportunity | Growing Silver Production Profile

    Value Opportunity | Growing Silver Production Profile P / NAV (Consensus | x) Revenue by Metal (2026E Consensus) Silver Gold Other SilverCrest 100% 1.92x Transaction Multiple Gatos Silver 1.77x Transaction Multiple 80% First Majestic 1.71x 62% Transaction MAG Silver 1.60x Multiple 60% Hecla Mining 1

  8. Slide 8: Morocco | Top Mining Jurisdiction

    Morocco | Top Mining Jurisdiction Morocco: #15 Globally By the numbers (#2 in Africa) by Silver Phosphate Barite Investment 1st 1st producer in Africa, 1st 1st 1st producer in Africa, 1st producer in Africa, Attractiveness1 z 15th worldwide 4th worldwide 3rd worldwide Inhabitants of Morocco’s 10% GD

  9. Slide 9: First Mover Advantage in Morocco

    Aya Gold & Silver | First Mover Advantage in Morocco Aya has established a strategic first-mover advantage in Imiter bis North Africa’s most prospective precious-metal districts Efficient permitting / Mining-Friendly Jurisdiction Underexplored geologically rich region Tizi Skilled Mining Workforce E

  10. Slide 10: Our Assets | Morocco-Focused, Quality Growth Portfolio

    Our Assets | Morocco-Focused, Quality Growth Portfolio PRODUCTION DEVELOPMENT EXPLORATION UPSIDE Zgounder Silver Mine Boumadine Polymetallic Project Multiple Pathways to Growth • Ownership: 100% • Ownership: 85% (15% ONYHM) • Early-stage exploration • Status: Operating • Status: PEA level1,2,3 • Zag

  11. Slide 11: Expanding Exploration Footprint in Morocco

    Expanding Exploration Footprint in Morocco | Acquisitions • Morocco land package grows 50% to over 1,200 km2 Reinforcing our first-mover position in Morocco Consolidating our district-scale exploration footprint in the region Creating a pipeline of opportunities for future discovery Broadening our e

  12. Slide 12: Industry-Low Discovery Cost

    Industry-Low Discovery Cost Industry-low Discovery Cost Driven by Extensive Drilling and Resource Growth RESOURCE GROWTH1,2,3,4 DRIVING OUNCES PER-SHARE 4.20 3.45 3.96 $0.10/oz-$0.15/oz 401 382 Industry-low Discovery Cost 318 Q2-2020 M&I up 5x, Inferred +400 Moz AgEq since 2021 204 New management 0.

  13. Slide 13: Zgounder Silver Mine | Reserve & Resource Update

    Zgounder Silver Mine | Reserve & Resource Update Strengthening the Geological Model and Mine Plan Key Highlights4 Exploration Success Delivered Reserve Replacement And Net Resource Growth1,2, P&P Reserves +4% Ag ounces vs. prior estimate (net of depletion) Contained Metal Tonnes (kt) Ag (g/t) (koz A

  14. Slide 14: Zgounder Silver Mine | Updated LOM Plan (2025)

    Zgounder Silver Mine | Updated LOM Plan (2025) 73Moz Zgounder Production Profile2 P&P reserves1 In Million Silver Ounces 6 Moz Ag - LOM Average 7.0 6Moz 6.0 5.2-5.8 Avg. annual Ag production 5.0 4.8 4.0 $16.26/oz 3.0 Cash costs (LOM) 2.0 1.6 1.0 0.7 11-year 0.0 2020 2021 2022 2023 2024 2025 2026E 20

  15. Slide 15: Q3-2026 | Production Results

    Q3-2026 | Production Results Q3 Production Highlights Zgounder Record consolidated Silver produced (oz) 1,497,749 2.0Moz production Average grade processed (g/t Ag) 146 Recovery (%) 92.0 Record production Boumadine 1.5Moz at Zgounder Silver produced (oz) 244,875 Gold produced (oz) 4,300 Silver equiv

  16. Slide 16: Q3-2026 | Strong Quarter on Record Production

    Q3-2026 | Strong Quarter on Record Production SILVER EQUIVALENT PRODUCTION Strong Revenues, Net Income and Operating Cash Flow In Moz AgEq driven by optimization of the Zgounder Silver Mine and strong silver price Zgounder Silver Mine Boumadine Reclaim Operations 2.03 $M 103 1.68 0.53 +90% 1.35 0.19

  17. Slide 17: YTD-2026 | Operational and Financial Highlights

    YTD-2026 | Operational and Financial Highlights YTD-2026 OPERATIONAL PERFORMANCE YTD-2026 FINANCIALS September 30, 2026 CONSOLIDATED 5.2Moz $16.30/oz $317M REVENUE OF SILVER EQUIVALENT CASH COSTS PER (AGEQ) PRODUCED AGEQ OZ SOLD ZGOUNDER $119M / $0.81 4.3Moz $17.32/oz NET INCOME BASIC EPS* OF SILVER

  18. Slide 18: 2026 Guidance | Updated to Higher End of Production Range

    2026 Guidance | Updated to Higher End of Production Range Q3-2026 Initial (In US dollars) Update Guidance Total production Moz AgEq1 6.6 – 6.8 6.2 – 6.8 Zgounder production Moz Ag 5.6 – 5.8 5.2 – 5.8 Boumadine pyrite reclaim operation Moz AgEq1 1.0 1.0 Zgounder avg cash costs2 $/oz AgEq Below 21.50

  19. Slide 19: Exploration | Zgounder and Regional

    Exploration | Zgounder and Regional 2026 Program ZGOUNDER NEAR-MINE DRILLING TARGET: 20,000 m • Focus: Underground exploration west of the Zgounder Fault and pit-adjacent programs. • Scope: Leverage AI and remote sensing results from 2025 plus detailed near-mine mapping. Imiter bis REGIONAL DRILLING

  20. Slide 20: Zgounder | At-depth Drilling of Near-Mine Permits

    Zgounder | At-depth Drilling of Near-Mine Permits Discovery of a new mineralized zone located north of the current open-pit1 Drilling confirmed mineralization at depth at the granite contact outside of the current resource boundary. Recent Drilling Highlights2 4,489 g/t Ag over 6m 6,223 g/t Ag over

  21. Slide 21: Zgounder Regional

    Zgounder Regional Zgounder Regional1 Increased prospectivity of the Zgounder Regional Project. • 6 new permits acquired (Zgounder Nord). • Total regional footprint3 of 346km², strengthening exploration pipeline. • Grab sample results have identified some high- grade grab Ag-Cu, and Au, along with ma

  22. Slide 22: Boumadine PEA | Compelling Development Opportunity

    Boumadine PEA | Compelling Development Opportunity District-Scale Low-Risk Proven Tier-1 Precious Standalone Model Track Record Metals Asset based on Three Significant Resource Growth Potential Payable Concentrates in the Region Exceptional Self-funded Permitted Economics and Access to with Mining L

  23. Slide 23: Boumadine PEA | Standing out on Value, Return & Capital Efficiency

    Boumadine PEA | Standing out on Value, Return & Capital Efficiency $3.5B 93% $463M 7.6x After-Tax NPV5% After-Tax IRR Initial Capex Capital Efficiency Ratio3 348/271 koz 3.9 Moz AuEq $11.0B $4.7B AuEq1,2 LOM4 production LOM LOM Free cash flow Avg. annual production Revenues (yrs 1-5) / LOM 1. Metal

  24. Slide 24: Boumadine PEA | Significant Leverage to Precious Metal Prices

    Boumadine PEA | Significant Leverage to Precious Metal Prices AFTER-TAX UNITS BREAK-EVEN3 -25% BASE CASE SPOT PRICE4 UPSIDE Gold / Silver price $1,704 / $24 $2,625 / $38 $3,500 / $50 $4,472 / $67 $5,250 / $75 NPV5% $B - 1.8 3.5 5.5 6.7 IRR % - 57% 93% 128% 146% Payback yrs - 1.3 0.7 0.5 0.4 Capital

  25. Slide 25: Boumadine PEA | Production Profile

    Boumadine PEA | Production Profile Longer mine life, higher production and strong head grades, underpinned by industry-low AISC3 Avg. grade: 4.11 g/t AuEq 348 koz / 271 koz (Y1-Y5) Avg. Annual Production (AuEq koz)1,2 600 Yrs 1-5 / LOM Avg. grade: 3.10 g/t AuEq (LOM) 500 Production, Au-Eq ('000 oz/y

  26. Slide 26: Boumadine PEA / District Land Position

    Boumadine PEA / District Land Position The Boumadine 339 km2 Property is located Land Package in the Province of Errachidia, in the 600 km2 Anti-Atlas Exploration Authorization Mountains in the Kingdom of 31 Permits and Licenses Morocco, ~220 km east of the City of Ouarzazate and BASIS FOR CURRENT P

  27. Slide 27: Gold & Silver

    rN GOLD & SILVER :

  28. Slide 28: Boumadine Mineral Permits

    Legend Boumadine Mineral Permits Bee POWERED BY ¢VRIFY

  29. Slide 29: Km strike length of geophysical anomalies

    6 km strike length.of geophysical anomalies

  30. Slide 30: 30

    30

  31. Slide 31: Boumadine PEA | 2026 Mineral Resource Estimate

    Boumadine PEA | 2026 Mineral Resource Estimate Mineral Resource Statement for the Boumadine Project, Morocco, as at an effective date of February 28, 2026 (1-13) Cutoff Tonnes Average Grade Contained Metal NSR US$/t (kt) Ag (g/t) Au (g/t) Cu (%) Pb (%) Zn (%) AuEq (g/t) Ag (koz) Au (koz) Cu (kt) Pb

  32. Slide 32: Boumadine PEA | Updated 2026 Mineral Resource

    Boumadine PEA | Updated 2026 Mineral Resource MRE GROWTH & CONVERSION TO M&I RESOURCES Contained Metal in Moz AuEq February 2025 Updated Mireral Resource INDICATED 0.8 1.1 +68% Estimate Excludes 2025 0.4 2-YR CAGR drilling campaign of 3.7 4.2 4.3 140,000 m 2024 MRE 1,4,5 2025 MRE 2,4,6 2026 MRE 3,4,

  33. Slide 33: Boumadine PEA | Mine Design

    Boumadine PEA | Mine Design South Pit North Pits Center Pit • Open pit 54% / Underground 46% • Open pit mining includes 6 pits • Mining sequence: High grade material processed Y1-Y5 • Open pit strip ratio 21:1 • Underground production: Starting in Y3 33

  34. Slide 34: Highly Capital Efficient Project | Capex Intensity Ratio of 7.6

    Highly Capital Efficient Project | Capex Intensity Ratio of 7.6 LOW INITIAL CAPEX of $463M Capital Expenditures ($M) Initial Sustaining Total Direct Costs 299 507 806 Open Pit Mining 52 59 112 Underground Mining 0 407 407 Processing Plant 175 0 175 Shipping HIGHLIGHTS / KEY ASSUMPTIONS 11 0 11 Infra

  35. Slide 35: Industry Leading Operating Costs

    Industry Leading Operating Costs LOW AISC $1,300/oz AuEq Cash Cost Breakdown (LOM AVG.) TSF & Water Operating Costs Year 1-5 LOM 1% Cost per tonne milled G&A Mining (underground and open pit) $/t milled 51 44 5% Processing $/t milled 18 18 G&A $/t milled 6 5 Process Plant TSF and Water $/t milled 0.

  36. Slide 36: Gold & Silver Process Flow

    i AN GOLD & SILVER Faw Wawr S1orage Process Water Storage Filtration Reagent Mixing Zinc Flotation Grinding Pyrite Fitration Pai) ee Thickening — Pyrite Flotation Crushing “i

  37. Slide 37: Boumadine PEA | Mill Flowsheet

    Boumadine PEA | Mill Flowsheet GRINDING CYCLONES Processing of mineralized JAW CRUSHER material using conventional crushing, SAG MILL BALL MILL grinding, and flotation to CRUSHED ROCK produce separate Lead, STOCKPILE Zinc, and Pyrite LEAD FLOTATION ZINC FLOTATION PYRITE FLOTATION concentrates TAILIN

  38. Slide 38: Boumadine PEA | Metallurgy & Processing

    Boumadine PEA | Metallurgy & Processing High recoveries, conventional processing, and multiple commercialization pathways positions Boumadine as a technically sound and highly economic development project Gold Silver Zinc Lead AuEq LOM (g/t) (g/t) (%) (%) Average (g/t) Select Processing Metrics Grad

  39. Slide 39: Boumadine PEA | Revenue Model (Concentrates)

    Boumadine PEA | Revenue Model (Concentrates) Revenue based on production of three gold- and silver- Strong Market Interest and Payables Established bearing concentrates: Multiple traders have expressed firm interest in purchasing lead, Lead, Zinc and Pyrite zinc, and pyrite concentrates. Based on re

  40. Slide 40: Infrastructure | Building on Established Strengths

    Infrastructure | Building on Established Strengths Strong existing infrastructure within Location: Accessible via Errachidia Tanger Port Nador West Port International Airport (to Casablanca) the region and road from Marrakech (~420 km). Oujda Casablanca Port Taourirte • Water Supply: Study completed

  41. Slide 41: Project Timeline | Next Steps

    Project Timeline | Next Steps • Exploration Program: A 400,000 m drilling campaign is underway, planned to be completed by the end of 2027. With 360,000 m focused on Mineral Resource definition, with the objective of converting inferred Mineral Resources into indicated Mineral Resources required for

  42. Slide 42: 2026 | Focused on Execution

    2026 | Focused on Execution ACCELERATING BOUMADINE DEVELOPMENT Early earthworks, late 2026–Q1 2027 — ahead of H2 FS, scale-up from base case • Finalize offtake agreements (payabilities) • Finalize ESIA & trade-off optimization • Finalize mining, processing & water studies • Finalize logistics 2026 D

  43. Slide 43: Ag (g/t)

    Ag (g/t)

  44. Slide 44: Boumadine PEA | Key Takeaways

    Boumadine PEA | Key Takeaways DISTRICT-SCALE PRECIOUS METALS OPPORTUNITY WITH STRONGER ECONOMICS, REDUCED EXECUTION RISK AND A CLEAR PATH TO PRODUCTION. DELIVERED UPDATED PEA 1 AFTER-TAX NPV5% / IRR AVG. ANNUAL PRODUCTION (AuEq)2 INITIAL CAPEX AISC ($/OZ AuEq)3 $3.5B / 93% 348 / 271 Koz $463M $1,105

  45. Slide 45: Investment Opportunity & Path Forward

    Investment Opportunity & Path Forward Boumadine's ramp-up takes Group free cash flow from US$268M to US$1.1B — a step-change not reflected in the current market capitalization 4.1x 25.3% INVESTMENT HIGHLIGHTS FCF Growth 2026E → Avg. '30–34E '30–34E FCF Yield on Current Market Cap¹ 1 Two-Asset Growth

  46. Slide 46: Contact Details

    1320 GRAHAM, SUITE 132 MONT-ROYAL, QC H3P 3C8 BENOIT LA SALLE: [email protected] ALEX BALL: [email protected] www.ayagoldsilver.com | [email protected] TSX: AYA | NASDAQ: AYA TSX: AYA | NASDAQ: AYA 46

  47. Slide 47: Supplementary Slides

    Supplementary Slides 47 TSX: AYA | NASDAQ: AYA

  48. Slide 48: Boumadine | Production Stage Benchmarking

    Boumadine | Production Stage Benchmarking 2026E PRODUCTION (KOZ AUEQ) 644 580 500 435 414 405 348 344 Average: 350 298 278 271 266 263 260 193 185 180 Kibali Boddington (1) Fruta Del Morelos Cote Fekola Boumadine (2) Loulo Buritica(3) Blackwater Boumadine(2) Obuasi (3) Greenstone Brucejack Lamaque G

  49. Slide 49: Boumadine | Development Stage Benchmarking

    Boumadine | Development Stage Benchmarking LOM AVERAGE ANNUAL PRODUCTION (KOZ AUEQ) 351 350 348 340 320 303 296 273 271 Average: 272 251 223 217 190 148 (1) (2) (1) (2)(3) Omai Oko West Boumadine Rogue Eskay Creek Spring Stibnite Tower Boumadine Troilus Kone Coffee Cariboo Diablillos (Year 1-5) Vall

  50. Slide 50: Boumadine | Development Stage Benchmarking

    Boumadine | Development Stage Benchmarking NPV/CAPEX 7.6x 4.2x 3.0x 2.8x 2.8x 2.2x 2.1x 2.0x Average: 2.1x 1.8x 1.5x 1.3x 1.1x 0.7x Boumadine Diablillos Coffee Omai Eskay Creek Troilus Oko West Rogue Spring Valley Kone Stibnite Cariboo Tower LOM/POST-TAX PAYBACK PERIOD 20.6x 14.7x 10.0x 7.4x 7.2x 6.

  51. Slide 51: Boumadine | Development Stage Benchmarking

    Boumadine | Development Stage Benchmarking AVERAGE ANNUAL PRODUCTION (KOZ AUEQ) VS. CAPITAL INTENSITY (US$/OZ AUEQ) $12,000 Initial CapEx Stibnite US$400M $10,000 Capex (US$) / Avg. Annual prod. (oz AuEq) US$2B $8,000 Troilus Tower Diablillos $6,000 Omai Cariboo Coffee Rogue $4,000 Spring Valley Oko

  52. Slide 52: Aya Gold & Silver | Experienced Board of Directors

    Aya Gold & Silver | Experienced Board of Directors Benoit La Salle, FCPA, MBA Ghislane Guedira Annie Torkia Lagacé Yves Grou, CPA, CA President & CEO, Director Chair and Director (Independent) Director (Independent) Director (Independent) Benoit has over 30 years of experience developing and Ghislan

  53. Slide 53: Aya | Our History

    Aya | Our History Imiter bis, Amizmiz, Azegour projects acquired Construction of Zgounder expansion / Extensive drilling program completed Zgounder flotation 2009–2011 plant commissioned bringing production capacity to 700tpd 2022-2024 2019 Boumadine acquired 2013 Nasdaq listing May 2026 2012 2020 2

  54. Slide 54: Zgounder | Top Silver Intercepts Globally

    Zgounder | Top Silver Intercepts Globally Los Ricos, 1 118,399 Zgounder reported 3 out of the top 10 and 15 out of the Zgounder, 2 Elizabeth Hill, 3 85,450 80,762 Filo del Sol, 4 77,683 top 50 global silver intersections of 2020-2024 YTD¹ La Colorada, 5 Breccia, 6 69,147 65,930 Diablillos, 7 64,287

  55. Slide 55: Boumadine PEA | Strong Project Economics

    Boumadine PEA | Strong Project Economics AFTER-TAX UNITS 2026 PEA 2025 PEA CHANGE Gold / Silver price $3,500 / $50 $2,800 / $30 NPV5% $B 3.5 1.5 140% 2026 PEA Highlights IRR % 93% 47% 46 pts Updated metal price Payback yrs 0.7 2.1​ -1.4​ assumptions Capex yrs 463 446 4% Higher payable metal Capital

  56. Slide 56: Boumadine PEA | Mine Schedule

    Boumadine PEA | Mine Schedule OP Mined tonnage (kt) UG Mined tonnage (kt) 5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0 Yr-0 Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 Yr-14 Yr-15 OP Mined tonnage (kt) 1,333 2,504 1,811 2,258 3,426 1,978 2,383 853 1,208 2,726 1,874 Ope

  57. Slide 57: ESG | Sustainability Highlights

    ESG | Sustainability Highlights Ore processed nearly tripled in 2025 while emissions intensity and freshwater use per tonne declined ENVIRONMENT SOCIAL GOVERNANCE -27% GHG emissions intensity 0 fatalities 20% 22.1 tCO₂e/kt of ore processed in 2025, vs. Zero-fatality target met in 2025, a year of Exe

  58. Slide 58: Appendix

    Appendix TSX: AYA | NASDAQ: AYA 58

  59. Slide 59: Appendix A | Technical Reports

    Appendix A | Technical Reports Boumadine Project The 2026 PEA is based on the updated Mineral Resource Estimate for the Project, effective February 28, 2026. The key assumptions, parameters and methods used to estimate the mineral resource estimate for the Boumadine Project and the identification of

  60. Slide 60: Appendix B | Zgounder Mineral Resources and Reserves

    Appendix B | Zgounder Mineral Resources and Reserves The information below refers to the Zgounder technical report for the Zgounder project titled “Technical Report – Updated Mineral Resource and Mineral Reserves Estimate of the Zgounder Silver Mine Operation, Kingdom of Morocco” dated as of Decembe

  61. Slide 61: Appendix C | Non-IFRS Measures and Other Financial Measures

    Appendix C | Non-IFRS Measures and Other Financial Measures Boumadine PEA - Non-IFRS Measures and Other Financial Measures This document includes certain performance measures commonly used in the mining industry that are not defined under IFRS. These measures do not have any standardized meaning und

  62. Slide 62: Aya Gold & Silver | Why Invest

    Aya Gold & Silver | Why Invest Exceptional underexplored geology District-scale potential Robust Assets Extensive Exploration Track-Record Mining Friendly Deep Talent Pool 62

Aya Gold & Silver — Investor Presentation (November 2026) on 6ix