Banque nationale de Belgique SA · EURONEXT:BNB
Banque nationale de Belgique SA — Investor Presentation (March 2023)
52 slides from Banque nationale de Belgique SA's investor presentation, Mar 16, 2023

Slide 1: Scarce, Abundant, or Ample? A Time-Varying Model of the Reserve Demand Curve
Scarce, Abundant, or Ample? A Time-Varying Model of the Reserve Demand Curve G. Afonso1 , D. Giannone2,3,4 , G. La Spada1 , J. Williams1 1 New York Fed 2 Amazon 3 University of Washington 4 CEPR National Bank of Belgium Brussels, 16 March 2023 Disclaimers: The views presented here are solely those o

Slide 2: The Reserve Demand Curve
The Reserve Demand Curve I Reserve demand curve: price at which banks are willing to trade reserves with each other as a function of aggregate reserves in the banking system 1. FOMC communicates stance via range for reserves’ lending rates 2. Fed can change aggregate reserves, but other factors can

Slide 3: The FOMC's Ample Reserves Regime
The FOMC’s Ample Reserves Regime I “[T]he Committee reaffirms its intention to implement monetary policy in a regime in which an ample supply of reserves ensures that control over the level of the federal funds rate and other short-term interest rates is exercised primarily through the setting of th

Slide 4: Demand for Reserves: Data
Demand for Reserves: Data I Goal of this paper: measure the ampleness of the supply of reserves 3 / 51

Slide 5: This Paper Estimates Reserve Demand Curve in 2010-2021
This Paper Estimates Reserve Demand Curve in 2010-2021 I Three main challenges: nonlinear relationship between prices and quantities unobserved structural changes ⇒ low-frequency movements endogeneity of reserves supply I Our approach: time-varying structural (IV) estimation of price sensitivity wit

Slide 6: Key Results
Key Results I Time-varying estimates of demand elasticity: Large elasticity → “scarce” reserves (2010, 2019) Near-zero elasticity → “abundant” reserves (2012-2017, 2020-now) Intermediate elasticity → “ample” reserves (2011, 2018) I Ample-to-abundant transition: reserves ∼ 12-13% of bank assets I Dem

Slide 7: Outline
Outline 1. Institutional background 2. Model & Identification Strategy 3. OOS Forecast Evaluation (if time permits) 4. Results 6 / 51

Slide 8: Reserves in the U.S. Banking System, 2010-21
Reserves in the U.S. Banking System, 2010-21 Long Sample I Reserves: deposits held by banks at the Fed I Billions before 2008 (GFC) → trillions after 2008 7 / 51

Slide 9: How Do Reserves Change? Two Ways
How Do Reserves Change? Two Ways I Reserves: assets for the banks, liability for the Fed Size of Fed’s balance sheet changes Composition of Fed’s liabilities changes I Left: Fed expands balance sheet → reserves increase I Right: another Fed’s liability decreases → reserves increase 8 / 51

Slide 10: Non-Reserve Liabilities
Non-Reserve Liabilities I Reserves are not a closed system: banks transact with holders of non-reserve Fed liabilities Two important examples: 1. Treasury General Account (TGA) 2. Overnight Reverse Repo Facility (ONRRP) 9 / 51

Slide 11: The Growth of Non-Reserve Liabilities
The Growth of Non-Reserve Liabilities Up to Oct 2022 Non-Reserves/Reserves TGA ONRRP 10 / 51

Slide 12: The Federal Funds Market
The Federal Funds Market I “Banks” trade reserves in the federal funds market unsecured lending (mainly overnight) I Absent frictions, the federal funds rate should be: above interest on reserve balances (IORB) below discount window (DW) rate 11 / 51

Slide 13: Reserve Demand Curve: Theory
Reserve Demand Curve: Theory I Between “scarce” and “abundant” → “ample” reserves 12 / 51

Slide 14: Monetary Policy Pre 2008
Monetary Policy Pre 2008 I Reserves: billions & not remunerated (IORB = 0) ⇒ steep curve I Fed hits target rate by adjusting reserve supply 13 / 51

Slide 15: Monetary Policy Post 2008
Monetary Policy Post 2008 I Reserves: trillions & IORB > 0 ⇒ flat curve I Fed changes IORB (and DW) rate to hit target range 14 / 51

Slide 16: Two Important Frictions
Two Important Frictions 1. Market segmentation: main money-market lenders do not earn IORB Federal Home Lending Banks (FHLB): federal funds; Money Market Funds (MMF): Eurodollar, repos 2. Banks’ balance-sheet constraints: Banks are unwilling to borrow if rate is not sufficiently lower than IORB ⇒ EF

Slide 17: Low-Frequency Drivers of Reserve Demand Post 2008
Low-Frequency Drivers of Reserve Demand Post 2008 I Liquidity regulation and internal liquidity-risk management Examples: Liquidity Coverage Ratio (LCR), thin late-day funding market I Banks’ balance-sheet costs (size-based) Examples: Supplementary Leverage Ratio (SLR), Federal Deposit Insurance (FD

Slide 18: Outline
Outline 1. Institutional background 2. Model & Identification Strategy 3. OOS Forecast Evaluation (if time permits) 4. Results 17 / 51

Slide 19: Reserve Demand Curve: Theory
Reserve Demand Curve: Theory I Non-linear reserve demand curve with vertical and horizontal shifts: pt = pt∗ + f (qt − qt∗ ; θ) + t pt : spread between federal funds rate and IORB qt : ratio of aggregate reserves to bank assets pt∗ : vertical location (curve’s lower bound) qt∗ : horizontal location

Slide 20: Estimating the Slope of the Reserve Demand Curve
Estimating the Slope of the Reserve Demand Curve I Structural demand curve at daily frequency: pt = αt + βt qt + σt υt pt : spread between federal funds rate and IORB qt : ratio of aggregate reserves to bank assets βt : elasticity of reserve demand (slope) I Idea: time-varying parameters capture non

Slide 21: First Type of Endogeneity: Fed's Interventions
First Type of Endogeneity: Fed’s Interventions I Fed adjusts reserve supply in response to unusual price dislocations Examples: September 2019, March 2020 I Response is quick but with delay of at least one day I Prices respond quickly returning to prior level within days 20 / 51

Slide 22: Second Type of Endogeneity: Non-Reserve Liabilities
Second Type of Endogeneity: Non-Reserve Liabilities 1. Changes in non-reserve liabilities mechanically affect level of reserves 2. They can also correlate with reserve-demand shocks! I Non-reserve liabilities are used by key money-market participants Treasury (TGA), MMFs (ONRRP), FHLBs (ONRRP, Fed a

Slide 23: Example: Banks' Window-dressing
Example: Banks’ Window-dressing I Month-ends: European banks reduce wholesale short-term borrowing ⇒ Downward pressure on reserve demand I MMFs place more cash at ONRRP ⇒ Reserves decrease I Window-dressing of European banks reverts within few days 22 / 51

Slide 24: Example: Treasury Auctions
Example: Treasury Auctions I Settlement dates: banks’ demand for overnight funding increases ⇒ Upward pressure on reserve demand I Banks send reserves to the Treasury (TGA) for the securities ⇒ Reserves decrease I Transient but frequent confounding factor Similar: corporate tax payments 23 / 51

Slide 25: Estimation: Instrumental Variables (IV) Approach
Estimation: Instrumental Variables (IV) Approach 1. Forecasting model of joint dynamics of reserves (q) and rates (p) Time-varying VAR with stochastic volatility Daily data; 10 lags Bayesian estimation Coefficients follow random walk slower than daily shocks Good out-of-sample (OOS) accuracy 2. Five

Slide 26: Our IV Methodology
Our IV Methodology I Estimate TV-VAR → reserves’ forecast errors uq,t = qt − qt|t−1 I Use error uq,t−5 as instrument for qt in structural equation: st = αt + βt qt + σt υt (IV ) covt (st , uq,t−5 ) ⇒ IV estimate: βbt = covt (qt , uq,t−5 ) I Instead of usual 2SLS, pull back cov(·) from the inversion

Slide 27: Our IV Methodology in Detail (I)
Our IV Methodology in Detail (I) I The forecasting model: time-varying vector autoregressive (TV-VAR) model with stochastic volatility (Primiceri, 2004): qt = cq,t +bq,q,1,t qt−1 +bq,p,1,t pt−1 +...+bq,q,m,t qt−m +bq,p,m,t pt−m +uq,t , pt = cp,t +bp,q,1,t qt−1 +bp,p,1,t pt−1 +...+bp,q,m,t qt−m +bp,p

Slide 28: Our IV Methodology in Detail (II)
Our IV Methodology in Detail (II) I Instead of usual IV estimation (2SLS) I We directly pull back IV covariances from reduced-form VAR’s estimation ∞ X ∞ X qt = ψq,q,j,t uq,t−j + q̃t & st = ψs,q,j,t uq,t−j + s̃t j=1 j=1 ψq,q,· & ψs,q,· : GIRFs of reserves and rates to reserves IRFs of reserves and r

Slide 29: Exogeneity of Our Instrument: Daily Data Are Key
Exogeneity of Our Instrument: Daily Data Are Key I Exclusion restriction: uq,t−5 uncorrelated with υt (demand’s error) 1. Fed’s response to price dislocations has a delay of at least a day And prices normalize quickly 2. Confounding factors via non-reserve liabilities last less than 5 days Examples:

Slide 30: Relevance of Our Instrument
Relevance of Our Instrument 1. Persistence of reserves’ path in our sample 2. Forecasting accuracy of our model (even OOS) ⇓ I 5-day-ahead reserve-to-reserve IRF: significant throughout sample equivalent of first-stage in traditional IV 29 / 51

Slide 31: Advantages & Robustness
Advantages & Robustness I Automatically robust to weak instruments (vs ordinary 2SLS) β’s posterior already reflects uncertainty in denominator IRF I Robust to autocorrelation & heteroskedasticity Ratio of IRFs estimated from VAR with 10 lags & stochastic volatility I Robustness checks: Add confound

Slide 32: Outline
Outline 1. Institutional background 2. Model & Identification Strategy 3. OOS Forecast Evaluation (if time permits) 3. Results 31 / 51

Slide 33: Out-of-Sample (OOS) Forecasting Accuracy
Out-of-Sample (OOS) Forecasting Accuracy 32 / 51

Slide 34: Out-of-Sample (OOS) vs In-Sample (IS)
Out-of-Sample (OOS) vs In-Sample (IS) 33 / 51

Slide 35: Calibration
Calibration : h=10 ' h=20 09 0! 08 uf a7 ao : Beal 06 vo I 05 af 0. 04 ig 03 ogo, , m0 02 ly aay 0 4 d 0 0102 0304 05 06070809 1 0 0102030405 06070809 1 0 010203 040506070809 1 PIT PIT PT Empiric (Federal Funds. Oo A 0 0 0.10.2 0.3 04 05 0.6 0.70809 1 “0 0102 03 0405 06070809 1 0 0.1 0.2 0.3 0.4 0.5

Slide 36: Estimated Slope of the Reserve Demand Curve
Estimated Slope of the Reserve Demand Curve I Statistically significant negative slope in 2010-2011 and in 2018-2020H1 I Near-zero slope during 2012-17 and 2020H2-2021Q1 IRFs Oct 2022 35 / 51

Slide 37: From Abundant (Flat) to Ample (Gently Sloped)?
From Abundant (Flat) to Ample (Gently Sloped)? I Slope emerges around 12% of bank assets in 2011 and 13% in 2018 Reserves = $1.6tn in 2011 and $2.2tn in 2018 36 / 51

Slide 38: Real-time Monitoring of Reserve Ampleness
Real-time Monitoring of Reserve Ampleness OOS IV estimate: expanding windows every 5 days I Close to IS estimates I Becomes significant in 2018Q3-2019Q1 (12-6 months before Sept 2019) Up to Oct 2022 37 / 51

Slide 39: Robustness: Different Reserve Normalizations
Robustness: Different Reserve Normalizations I Normalizing reserves by GDP I Normalizing reserves by bank deposits 38 / 51

Slide 40: Robustness: Controlling for Other Market Rates
Robustness: Controlling for Other Market Rates I Adding repo rates in TV-VAR (trivariate) I Adding T-bill yields in TV-VAR (trivariate) I Same with MMF rates 39 / 51

Slide 41: Quantifying Horizontal and Vertical Shifts in Demand
Quantifying Horizontal and Vertical Shifts in Demand I Specify non-linear functional form with vertical & horizontal shifts Only 3 periods for simplicity (but daily varying also possible) I Non-linear fit on draws from time-varying forecasting model: p̂i,t = pt∗ + f (q̂i,t − qt∗ ; θ) + ei,t θ1 − x π

Slide 42: Post-processing Non-linear Fit on Model Forecasts
Post-processing Non-linear Fit on Model Forecasts I Horizontal shift to the right: 1-2 percentage points I Vertical shift upward: 12-13 basis points ⇒ Spread by itself is not a reliable summary statistic of rate sensitivity Up To Oct 2022 41 / 51

Slide 43: Possible Drivers of Horizontal and Vertical Shifts
Possible Drivers of Horizontal and Vertical Shifts I Horizontal shifts: Post-crisis liquidity regulation Post-crisis changes in internal liquidity-risk management Precautionary demand due to lack of depth in late-day market I Vertical shifts: Bargaining power of key lenders such as FHLBs & MMFs Vari

Slide 44: From Ample (Gently) to Scarce (Steeply Sloped)?
From Ample (Gently) to Scarce (Steeply Sloped)? I Non-linear post-processing fit allows to look at ample-to-scarce transition IV structural estimates can’t because they are locally linear √ I Point of maximum slope growth (θ1 + θ2 / 3): Slope changes from gentle to steep 8-10% pre 2015 & 10-12% post

Slide 45: Conclusions
Conclusions I Methodology to identify abundant, ample, and scarce reserves in real time I Time-varying estimates of demand elasticity: Large elasticity → “scarce” reserves (2010, 2019) Near-zero elasticity → “abundant” reserves (2012-2017, 2020-now) Intermediate elasticity → “ample” reserves (2011,

Slide 46: Numerator and Denominator of IV Estimate
Numerator and Denominator of IV Estimate 45 / 51

Slide 47: Estimated Slope Up To October 2022
Estimated Slope Up To October 2022 46 / 51

Slide 48: Real-time Monitoring of Reserve Ampleness
Real-time Monitoring of Reserve Ampleness OOS IV estimate: expanding windows every 5 days I Close to IS estimates I Becomes significant in 2018Q3-2019Q1 (12-6 months before Sept 2019) 47 / 51

Slide 49: Post-processing Non-linear Fit on Model Forecasts
Post-processing Non-linear Fit on Model Forecasts I Horizontal shift to the right: 0-2 percentage points I Vertical shift upward: 12-13 basis points ⇒ Spread by itself is not a reliable summary statistic of rate sensitivity 48 / 51

Slide 50: The Growth of Non-Reserve Liabilities
The Growth of Non-Reserve Liabilities Non-Reserves/Reserves TGA ONRRP 49 / 51

Slide 51: Overnight Reverse Repo Facility (ON RRP)
Overnight Reverse Repo Facility (ON RRP) Figure: Reserve demand curve (theory). I 2013: Fed introduced ONRRP for FHLBs & MMFs → floor on rates 50 / 51

Slide 52: Reserves in the U.S. Banking System
Reserves in the U.S. Banking System 51 / 51
Source: Internet Archive copy of nbb.be
More decks from Banque nationale de Belgique SA
Investor Presentation (October 2026)16 slides · Oct 14, 2026
Investor Presentation (October 2026)20 slides · Oct 14, 2026
National Bank of Belgium — Investor Presentation (October 2026)27 slides · Oct 14, 2026
Nationale Bank van België — Investor Presentation (February 2026)31 slides · Feb 27, 2026
National Bank of Belgium — Technical Presentation (February 2026)36 slides · Feb 5, 2026
Technical Presentation (December 2025)57 slides · December 2025