Delta Resources Limited · TSXV:DLTA

Delta Resources — Investor Presentation (March 2024)

19 slides from Delta Resources's investor presentation, March 2024

  1. Slide 1: The Delta-1 Gold Project. A Mine in the Making in Thunder Bay

    DLTA | TSX-V DTARF | Frankfurt | OTC – 6G01 Leaving No Stone Unturned. THE DELTA-1 GOLD PROJECT. A MINE IN THE MAKING IN THUNDER BAY ONTARIO, CANADA. Corporate Presentation MARCH, 2024

  2. Slide 2: Disclaimer

    Disclaimer Forward Looking Information Certain information contained or incorporated by reference in this presentation, operating or technical difficulties in connection with mining exploration or including any information as to our future financial or operating performance, development activities;

  3. Slide 3: Board of Directors & Management

    Board of Directors & Management Andre C. Tessier, Frank Candido Nathalie Laurin P.Eng., P.Geo CHAIRMAN CFO PRESIDENT, CEO B.A., +25 years financial +25 years experience in consultant, specializing in & DIRECTOR the financing of private administration, project management and public early-stage and ac

  4. Slide 4: The Company In A Nutshell

    The Company In A Nutshell Numbers at March 15, 2024 12-Month Stock Chart Trading as DLTA-V 102M Shares May 17, 2023 in Canada Outstanding $10M Bought Deal Financing $0.60 (also trading on the OTC in US as DTARF $0.50 and in Frankfurt 6G01) Last Trade $0.15 CDN $0.40 Price/Prix Market Cap 15M CDN $0.

  5. Slide 5: Projects

    Projects Delta-1 Gold  50 km west of Thunder Bay. Ontario.  Delta owns a 100% interest | ~107 km² Delta-2 Gold-Polymetallic  35 km southeast of Chibougamau, Quebec.  Delta owns a 100% interest | ~194 km² 5 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ne

  6. Slide 6: Location & Access

    Delta-1 Location & Access Delta-1 – GOLD PROJECT Thunder Bay, Ontario o 50 km west of Thunder Bay. Ontario. o Straddling the Trans-Canada Highway o Thunder Bay (~120,000 pop) o Delta owns 100% interest | ~107 km² 6 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u

  7. Slide 7: Proximity to Infrastructure

    Delta-1 Proximity to Infrastructure Delta-1 – GOLD PROJECT Thunder Bay, Ontario o Adjacent to Trans-Canada Highway. o Two existing Power Lines. o Planned Waasigan High-Voltage Transmission Line. 7 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.

  8. Slide 8: Regional Geology

    Delta-1 Regional Geology DELTA-1 PROPERTY Thunder bay Mining District, Ontario, CANADA N DELTA-1 PROPERTY Regional Geology Shebandowan DELTA-1 PROPERTY Opawica Gneissic Belt Thunder Bay Lake Superior 5 8 Shebandowan N 6 DELTA-1 PROPERTY SCALE 4 7 0 5 10 15 20 25 1 kilometres 3 LEGEND 2 Massive Grano

  9. Slide 9: Gold Deposit Surface Geology

    Delta-1 Gold Deposit Surface Geology DELTA RESOURCES LIMITED DELTA-1 PROPERTY N Geology of the Eureka Gold Zone LEGEND Shebandowan Clastic Sediments (2680-2690 Ma) Conglomerate (Shebandowan Fm) Clastic Sediments (Greenwater 2719-2722ma) Mafic Volcanics Greenwater Fm (2719-2722 Ma) Pillowed Mafic Vol

  10. Slide 10: Gold Zone – Isometric View

    Delta-1 Gold Zone – Isometric View 10 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.

  11. Slide 11: Gold Mineralization-3D Block Model

    Delta-1 Gold Mineralization-3D Block Model Isometric View Looking NNE Looking E ~100 m ~250 m Cross-Section Looking East 11 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.

  12. Slide 12: Gold Grades & Long Section

    Delta-1 Gold Grades & Long Section Isometric View Looking NNE X X Gold Grades X Greater than 1 g/t Gold Only 12 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.

  13. Slide 13: Gold Mineralization-Stockwork

    Delta-1 Gold Mineralization-Stockwork Drill Hole D1-23-30 Stockwork of quartz-ankerite-albite- pyrite veinlets from drill hole D1-23-30. 2.06 g/t Au over 65.8 m Here the zone is hosted by altered Greenwater basalt. ALTERATION Ankerite-Sericite-Albite-Quartz ~2-3% Disseminated Pyrite 13 TSX-V : DLTA

  14. Slide 14: Gold Mineralization

    Delta-1 Gold Mineralization D1-23-33 62.6m V1 asp D1-23-33 16.5m 0.81 g/t Au 3.85 g/t Au V2 V1 asp D1-23-31 36m Various drill-core samples showing 3.4 g/t Au V1 V2 V1 several generations of gold-bearing V2 V1 veinlets within the mineralized zone. Preliminary observations suggest that arsenopyrite-ri

  15. Slide 15: Current and Future Work

    Delta-1 Current and Future Work INITIAL 2024 DRILLING PROGRAM UNDERWAY (5,000 metres started January 17 increased to 8,000 metres March 7, 2024): OBJECTIVES: o Increase the gold inventory and gain additional confidence in Delta’s current interpretation, o Expand the gold mineralized zone east, west

  16. Slide 16: What's Next - 2024 Drill Targets

    Delta-1 WHAT’S NEXT - 2024 Drill Targets West Extension East Extension IP Anomalies Rake #3 Rake #1 Rake #2 16 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.

  17. Slide 17: 3D Induced Polarization Survey Resistivity Map View

    Delta-1 3D Induced Polarization Survey Resistivity Map View 17 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.

  18. Slide 18: Conclusion

    Conclusion Delta-1 Project Location Project Timing People  Located in a pro-mining  ALL THE INGREDIENTS  Just started a 5,000  Dedicated team to jurisdiction. FOR A MAJOR ECONOMIC metres drill program. add value for GOLD DEPOSIT. shareholders.  Immediately adjacent to  Currently at a Cdn $10 I

  19. Slide 19: Contact us

    Contact us André C. Tessier, President & CEO www.deltaresources.ca [email protected] 1718 Christine Cr, Kingston, On, CANADA, K7L 4V4 Frank Candido, Chairman Tel: 613.328.1581 [email protected] 19

Delta Resources — Investor Presentation (March 2024) on 6ix