Enertopia Corp. · CSE:ENRT

Enertopia — Investor Presentation (March 2023)

17 slides from Enertopia's investor presentation, March 2023

  1. Slide 1: March 2023 West Tonopah (WT) Lithium Presentation

    March 2023 West Tonopah (WT) Lithium Presentation 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company make

  3. Slide 3: Project Location Nevada State Map

    Project Location Nevada State Map Enertopia currently controls 100% of 88 royalty free lode claims covering approximately 1,760 acres in Big Smoky Valley four miles west of Tonopah, Nevada. The project area is adjacent to paved highways and grid power access as well as nearby local sources of water.

  4. Slide 4: Table of June 2022 Drill Assay Results

    Table of June 2022 Drill Assay Results HOLE # From ft To ft PPM Li Avg PPMLi high Assay Claystone Horizon type Comments DH22-01 13 120 738 1,120 Li claystone open to depth DH22-04 30 190 408 630 Li claystone open to depth DH22-05 32.5 120 799 1,140 Li claystone open to depth DH22-06 47.5 120 843 1,2

  5. Slide 5: Drill core photo

    Drill core photo Photo shows the green higher grade Li Claystone intersected in holes DH22-01 05, 06, & 07. Core photo is from hole DH22-07 of the last 10 foot interval, from 110’-120’ which ran 783 ppm Li. Note how soft the claystone is with the indentations made by putty knife handle. 5

  6. Slide 6: Drill core photo

    Drill core photo Photo shows the black Li Claystone intersected in holes DH22-16, 19 and 20. This photo was from near, or at the bottom of each of the respective drill holes 6

  7. Slide 7: Enertopia West Tonopah (WT) Lithium Project

    Enertopia West Tonopah (WT) Lithium Project Photo looking southwest from DH-07 location which intersected 107 feet of 738 PPM Li. The bottom 20 feet of DH- 07 assayed 905 ppm and is open at depth. 7

  8. Slide 8: Enertopia West Tonopah Lithium Project: Next Steps 2023 Drill Program

    Enertopia West Tonopah Lithium Project NEXT STEPS “2023 Drill Program” The Company received approval from the BLM on February 28, 2023 with respect to the second phase drill program. The approved drilling program is for up to 12 holes, with drilling depths of 450 feet each. The next drill program wi

  9. Slide 9: June 2022 Completed Drill Hole Locations and planned 2023 Drill hole locations

    West Tonopah Lithium Project June 2022 Completed Drill Hole Locations and planned 2023 Drill hole locations Shallow drilling up to 200 feet from surface has confirmed an extensive area of lithium bearing claystone that underlies the project area. All holes ended in lithium claystone mineralization wi

  10. Slide 10: EV Wars for Battery Grade Lithium Supply!

    EV Wars for Battery Grade Lithium Supply! If EV growth continues at its current pace, the potential new mine supply will simply not be able to keep pace with demand. From 2023-2028 an estimated $45B will need to be invested in lithium mining projects & battery infrastructure to reach the projected d

  11. Slide 11: Lithium Demand from 2021 to 2040 estimated to grow 40x

    Lithium Demand from 2021 to 2040 estimated to grow 40x 11

  12. Slide 12: Li-ion battery prices per watt expected to fall by over 60% by 2040

    Li-ion battery prices per watt expected to fall by over 60% by 2040 from 2022 levels 12

  13. Slide 13: Management

    MANAGEMENT President, CEO and Director: Robert McAllister Mr. McAllister has served as President of Enertopia since November 2007 and as a Director since April 2008. Mr. McAllister was responsible for Investor Relations and Corporate Communications for publicly traded mining and oil & gas listed com

  14. Slide 14: Board of Directors

    Board of Directors Director: Kevin Brown Mr. Brown brings over 18 years of diversified financial and business management experience in private companies, covering the high-tech, mining, and the health and wellness industries. Director: Robert McAllister Mr. McAllister has served as President of Ener

  15. Slide 15: Advisory Consultants

    ADVISORY CONSULTANTS Dr. John Thomas - Technical Advisor Dr. Thomas is a professional engineer, and holds a B.Sc., an M.Sc., and a Ph.D. in chemical engineering from the University of Manchester in the United Kingdom. He also received a diploma in accounting and finance from the U.K. Association of

  16. Slide 16: President's Message

    President’s Message “We are very happy with our accomplishments in 2022 as we moved the WT lithium project from concept to proving a lithium deposit underlies our project. We look forward to bigger steps in 2023 and beyond ” Stated President Robert McAllister The Qualified Person: The technical proje

  17. Slide 17: Contact Information

    CONTACT INFORMATION President & CEO Robert McAllister Phone: 250-870-2219 Share Structure March 2023 Email: [email protected] Issued and Outstanding 155,166,088 Head Office Address: Warrants 4,923,369 1873 Spall Road # 18 Kelowna, BC Options 9,100,000 V1Y 4R2 Fully Diluted 169,189,457 17

Enertopia — Investor Presentation (March 2023) on 6ix