TerraForm Power Inc

TerraForm Power — Investor Presentation (January 2015)

34 slides from TerraForm Power's investor presentation, Jan 14, 2015

  1. Slide 1: Safe Harbor Statement

    Exhibit 99.1 Safe With cause Power, registration statements This TerraForm 2apresentation. SunEdison Harbor presentation the actual Inc. exception represent POWER (“TerraForm” statement results company also of tothe for historical differ includes Companies’ its and, materially initial together non-G

  2. Slide 2: Forward-Looking Statements

    Forward-Looking This to “forecast,” statements Factors price costs Wind borrow generation are update TerraForm’s that 3aTerraForm SunEdison certain subject may report fluctuations, during wind or additional that affect risks, revise operations, contained believe POWER “intend,” to contains generatin

  3. Slide 3: Section 1: Executive Summary

    USA: Section aTerraForm SunEdison Mt. 1: Signal Executive POWER company 266Summary MW

  4. Slide 4: TerraForm Power Overview

    Growth Dividend Targeting 2015 Visibility 10.7 Proprietary 1. 2. 3. 4. 7aTerraForm SunEdison Approximately Represents ProGW Expected forma and of to per 5-year Power POWER M&A expected growth dividend-oriented for company share target Cash the compounded 70% Overview pipeline, (DPS) 5-year First Ava

  5. Slide 5: Scale and Growth Since IPO

    Acquisitions @ Total Call 2015 Long-Term Dividend 1. 8aTerraForm SunEdison TerraForm IPO Right EBITDA CAFD MW July Guidance Growth 808 Pipeline(1) Increased POWER 15% 2014 Guidance company and also MW Guidance 24% drop HUDSON Target has $0.90 1,507 aScale aSunEdison 60% 1.1 downs $107M 6-year $193M

  6. Slide 6: Strong Execution Since IPO

    Strong IPO Increased Dividend DPS Long-term 15% Install 189 Closed Drop Two 76 US Third Announced 624 Expected New Wind 9aTerraForm SunEdison MW DG MW Commitments U.K. growth Global Downs Doubled Party 157 Track the solar 32 to growth annualized utility MW following POWER dividend M&A agreement clos

  7. Slide 7: Increased Dividend Guidance

    First Hudson 44% $$1.08 $0.90 @IPO(1) 1. 2. aTerraForm 10 SunEdison 0.90 Based Includes Wind DPS $0.22 $0.90 $0.18 &on 4Q Growth Capital 2015 IPO POWER Hudson IPO $0.90 $0.18 company Dividend Revised portfolio. $1.30 Dynamics Energy Annualized DPS Solar acquisitions Guidance and (2)Capital 2015E and

  8. Slide 8: Best-in-Class Dividend Growth Profile

    Best-in-Class $2.61 Target Guidance @IPO $0.90 $1.08 $1.30 $1.53 $1.90 Execution Note: aTerraForm 11 SunEdison Dividend Growth 4Q Annualized CAFD POWER company Dividend CAGR perGrowth share Dividend 24% Target numbers DPS $2.28 Growth Growth 2015 include 2016 Profile the 2017 impact 2018of2019 First

  9. Slide 9: Visible Growth: Total Shareholder Return

    Visible At 7.0% Growth: RNW 6.0% Total ABY Yield PEGI 5.0% LQA TERP(2) 3.0% 2.0% PSXP EQM VLP 0.0% 1.0% SHLX Dividend MLP Note: 1. 2. aTerraForm 12 SunEdison Assumes Management IPO YieldCo NYLD AM Return: Dividend NEP 3.0% Reflects Growth 15% /4.0% DM Distributions POWER 6.0% $0.90 company 19% TERP

  10. Slide 10: Visible 4Q Growth: Total Return

    Visible 4Q Growth: Total LQA 107.0% SHLX MPLX DM NEP PSXP EQM VLP AM NYLD TERP(3) TERP(2) PEGI ABY RNW Dividend MLP Note: 1. 2. 3. aTerraForm 13 .0% SunEdison Assumes Management Dividend YieldCo Dividend Return: 6.0% 3.0% Reflects Growth 20% Yield: / Distributions POWER 5.0% 6.0% $0.90 $1.08 company

  11. Slide 11: Visible First Wind Growth: Total Return

    Visible First Growth: Total LQA 17.0% SHLX MPLX DM NEP PSXP EQM VLP AM NYLD TERP(4) TERP(3) TERP(2) PEGI ABY RNW 0.0% Dividend MLP Note: 1. 2. 3. 4. aTerraForm 14 SunEdison 2Assumes Management Wind YieldCo Dividend Return: 6.0% 3.0% Reflects Growth 24% Yield: / Pro Distributions POWER 5.0% 6.0% $0.9

  12. Slide 12: Section 2: Our Portfolio

    Section USA: aTerraForm SunEdison Alamosa 2: Our POWER company Portfolio 8 MW

  13. Slide 13: TerraForm's Focus Markets

    Focus 4321TerraForm’s Note: 1. U.S. OR VT Copiapo Chile Ampney UK Wiltshire Ontario Canada Hamps Kent Fairwinds Cornwall Crundale Pembrokeshire Bristol U.K. Devon aTerraForm 16 SunEdison High Favorable Stable Pro ME NV 1,206 162 101 Symbols forma on quality growth 38 NY CA market (Atacama Crucis Hig

  14. Slide 14: Pro Forma Portfolio Characteristics

    First Physical Name Solar KWP Kahuku Mars Steel Cohocton Stetson Rollins Sheffield Bull Total Significant Location VT MA HI ME NY Long-Term Contract >19 0–4 15–19 10–14 5–9 COD 2012 2014 2006 2007 2011 2009 2010 TERP’s 1. 2. aTerraForm 17 SunEdison The First KWP 15% 8% 31% 42% 8% 50% 3% Hill Wind Wi

  15. Slide 15: High Quality, Diversified Assets

    High Canada Location Chile UK US Assets Generation Wind Solar Diversification Asset >5 2-5 <2 Most average S&P NR AA+ AA AA- A+ A A- BBB+ BBB BBB- Remaining 0–5 20+ 6–10 11–15 16–20 Average Note: aTerraForm 18 SunEdison 20% Years 30% 80% 12% Years 6% 1% 11% Years <1% Counterparty Years Quality 7% <1

  16. Slide 16: Section 3: Key Growth Drivers

    USA: Section aTerraForm SunEdison KWP 3: Key POWER Icompany 30Growth MW Drivers

  17. Slide 17: Multiple Pillars Drive Visible Growth

    Multiple PillarsGrowth Drive Visible Pillars Growth Drivers Projected FTM CAFD Commitment $175M Call Right Projects 1.7 GW + 1 Sponsor Drop Downs First Wind Pipeline CAFD of $221M(1) Call Right Projects 1.6 GW + Supporting High CAFD Growth ROFO 6 years ~10.7 GW of visibility(2) + 2 Third Party M&A T

  18. Slide 18: SunEdison Produces Leads

    1 SunEdison Produces 6.0 ~3.2 0.4 23.9 7.6 2.7 Leads Qualified Pipeline Backlog Conversion Cycle Utility-scale 612 DG Pro Visibility First 1.6 Expected SunEdison 1. aTerraForm 21–SunEdison’s Conversions –GW ~3.0 10.7 0.5 1.8 12 Forma ~1.9 36 GW Wind Time 10% months 1.1 months of GW Ex. 90% Visibilit

  19. Slide 19: Sponsor Drop Down Pipeline

    1CirstwindR SunEdisonR Ontario Tenaska fEnergy + 1,734 Project Seven Kawailoa Waiawa Mililani Four Oakfield South Bingham Hancock Weaver Rattlesnake Route Bowers Pro 1,611 Inventory COD MW 52% 2016 28% 2015 20% 2019 2017- Chile UK Note: 90% US a5% TerraForm POWER 22 ommitted SunEdison AP Western Blu

  20. Slide 20: Strong Renewable Market Opportunity

    2Renewable Strong A + CAGR GW 72 35 47 51 56 60 2013 39 Solar SunEdison Entry Global TERP ~115 Markets Rest ~240 Other ~200 Countries Wind 624 Source: 1. a2. TerraForm POWER 23SunEdison cquisition Lazard Includes 54 MW of 2014 GW GW(2) Wind is will into 62 OECD Current Market Renewables Installed 16

  21. Slide 21: SunEdison Distributed Generation Overview

    2DSunEdison Distributed Overview Highly Stronger 2012-2016 Utility 44% 39% 22% Source: The Acquisition Leadership — Pro 83% 17% 2015 1. 73% Utility(3) 27% DG 2. a3. TerraForm POWER 24istributed Pro Source: Includes Distributed SunEdison Drives Forma Contribution acquired CAFD forma Growth fragmented

  22. Slide 22: Representative Third Party Acquisitions

    2Representative TERP STONE RIVER Mt. HUDSON Madison MDPR CapitalDynamics SOLAR @IPO DEShaw&Co FirstwindR #Size Locations Generation Utility Remaining MW–Weighted Rating(1) CAFD Equity Closed Closing 1. 2. a3. TerraForm POWER 25SunEdison of For Represents Hudson Signal Power 266 Mt. acquired “Small”

  23. Slide 23: Strong Growth Capital from SunEdison

    Growth Strong firstwind SunEdison First $500M CORPORATION $600M $1.5B $400M Ring-fenced Identified Provides Attractive Warehouse Operating Construction aDevelopment TerraForm POWER 26 SunEdison Reserve development Term Equity Revolver Supported construction fleet cost Facility facility entity, compa

  24. Slide 24: Section 4: Financials

    USA: aSection TerraForm POWER SunEdison DG4: 2009-2013 Financials companyPortfolio of 15.2 MW

  25. Slide 25: Significant Increase in CAFD and EBITDA Guidance

    Significant ($M Initial Previous Current $360 $268 $193 87% $214 $156 $107 Increase 100% 2015E a1. TerraForm POWER 28SunEdison Prounless Portfolio forma CAFD EBITDA Guidance Guidance Increase otherwise for company @IPO First (November (November inWind. noted) (July CAFD18, and 18, 5,2014) 2014) 2014

  26. Slide 26: First Wind Acquisition Sources and Uses

    Acquisition ($M Sources HY PIPE $800.0 Public 350.0 Undrawn Uses $550.0 First Refinancing $862.0 Expenses 573.5 Total 64.5 1. $1,500.0 a2. TerraForm POWER 29SunEdison Original Estimated Notes unless Wind of Sources Uses Offering Equity Funds ofRevolver and Offering Consideration Funds(1) bridge othe

  27. Slide 27: Strong, Well-Capitalized Liquidity Position

    Strong ($M Significant Well-Capitalized Cash $130 $215 ($75) $605 $335 as Current Revolver LC Liquidity First 1. A TerraForm POWER 30 SunEdison Does ofRequirements unless Wind 1/13/2015(1) onLiquidity Revolver not Hand size Upsize Pro Close flexibility otherwise consider Company Forma to be Position

  28. Slide 28: Significant Liquidity to Support Growth

    Liquidity Corporate ~$600M(1) Warehouse Aggregate $1.5B Our $2.1B Note: 1. A TerraForm POWER 31 SunEdison Pro current assumes forma to Liquidity: Liquidity: Liquidity: CAFD: liquidity Support for Company assets the ~$55M First Growth position acquired Total CAFD: Wind CAFD: provides $135M atacquisit

  29. Slide 29: Section 5: Summary

    Section USA: A TerraForm POWER SunEdison Stetson 5: Summary Company Wind I 57 MW

  30. Slide 30: Growth and Dividend Visibility

    Growth Dividend Visibility 10.7 Proprietary 1. 2. 3. A TerraForm POWER 33 SunEdison Represents Pro GWforma and of to per Power M&A expected growth dividend-oriented for share Company target the Overview pipeline (DPS) 5-year First powerWind growth and CAGR plants renewable demonstrated acquisition a

  31. Slide 31: Appendix

    USA: Appendix A TerraForm POWER SunEdison Nellis Air company Force Base 14 MW

  32. Slide 32: Current Asset Portfolio

    Current Credit Asset Distributed Hudson Summit Enfinity US California MA CD DG Mt. Utility: Regulus NC Atwell Nellis Alamosa CalRENEW-1 Marsh SunE Crundale Stonehenge Says Crucis Fairwinds Norrington CAP Subtotal Total A TerraForm POWER 35SunEdison DG DG Portfolio Signal 2014 2015 Operating Court 10

  33. Slide 33: Reconciliation of Net Income to Adjusted EBITDA

    TERP Year As (In Nov. Costs 55,700 General 17,200 Total 180,400 Operating 150,300 59,200 Net Depreciation, Add: 107,500 Interest 91,100 Income 23,000 Stock 10,500 $Adjusted 1. compensation 2. provided A TerraForm POWER 36 330,700 36,200 268,300 SunEdison Adjusted Reflects of thousands) income Ending

  34. Slide 34: Reconciliation to Estimated CAFD

    TERP Year Nov. Depreciation, Non-cash Adjustments Net Changes Deposits Cash Scheduled Non-expansionary Contributions Other Estimated 1. A TerraForm POWER 37 SunEdison Represents income cash Ending 5th distributions (600) (900) Reg. Revised in provided into/withdraws items cash project-level assets G

TerraForm Power — Investor Presentation (January 2015) on 6ix