  1. Slide 1: Expert Presentation to Community Liason Committee

    www.geosyntec.com Expert Presentation to Community Liason Committee Dr. Michael Kavanaugh – Geosyntec Consultants Dr. Paul Johnson – Arizona State University Orica Botany Groundwater Cleanup Project 20 February 2014 Sydney, Australia 1 www.geosyntec.com

  2. Slide 2: Influences from Recent Years

    Influences from Recent Years ESTCP/SERDP Project Results Expert Committee Reports Empirical Performance Assessments Source Mechanistic Studies Characterization 2 www.geosyntec.com

  3. Slide 3: Remediation Strategy

    Remediation Strategy • Orica remediation strategy: (from 2014 Draft Report to Regulators) • Containment of dissolved phase CHC plumes on and off site to ensure risks to human health and the environment remain below target levels. • Continual optimization of operation of hydraulic containment and the

  4. Slide 4: CSM Updates: Decreased Risk to Receptors

    CSM Updates: Decreased Risk to Receptors DNAPL as CHC concentrations in CHCs concentrations n pore source of Springvale Drain water in Penrhyn Estuary below CHCs decreased several OoM Trigger Values Dissolved Decreases in CHC plumes concentrations in shallow groundwater as a result of Fill groundwat

  5. Slide 5: Groundwater Capture - Shallow

    Groundwater Capture - Shallow Hydraulic control is maintained From Figure 3.1 of 2013 Monitoring Report 5 www.geosyntec.com

  6. Slide 6: Groundwater Capture - Deep

    Groundwater Capture - Deep Hydraulic control is maintained Figure 3.2 of 2013 Monitoring Report 6 www.geosyntec.com

  7. Slide 7: Groundwater Extraction Performance

    Groundwater Extraction Performance • Approximately 14,000 ML groundwater has been removed (versus a plume pore volume of approximately 7,500 ML). Removal of close to two plume pore volumes Removal of 80-90% of dissolved mass – matches simple Pore Flushing Model • Total extraction rate is on target w

  8. Slide 8: Mass Removal/Concentration

    Mass Removal/Concentration • Total average extracted CHC concentration reaching asymptote Source: 2014 Botany Groundwater Review 8 www.geosyntec.com

  9. Slide 9: Remedial System Performance Summary

    Remedial System Performance Summary • System is meeting remedial objectives • Groundwater plumes are contained (shallow and deep) • Significant mass removal by extraction treatment • Potentially significant removal by transformation processes (hydrolysis, reductive dehalogenation, abotic reductions)

  10. Slide 10: Large-Scale, High Concentration Plume – B.F. Goodrich Superfund Site

    Large-Scale, High Concentration Plume – B.F. Goodrich Superfund Site • B.F. Goodrich Superfund Site, Calvert City, Kentucky has some similarities to BIP • Active chemical manufacturing facility • Large size, multiple sources, presence of multicomponent DNAPL with significant EDC fraction • High conc

  11. Slide 11: B.F. Goodrich Superfund Site

    B.F. Goodrich Superfund Site Source: Google Earth. 11 www.geosyntec.com

  12. Slide 12: Closing Thoughts

    Closing Thoughts • Current containment strategy is technically appropriate. • Current containment strategy is technically manageable – system rehabilitation/optimization required to meet RAOs in Voluntary Management Plan. • Complete isolation or removal of DNAPL sources not technically practical – p