  1. Slide 1: Interim Half Year Report — January 2006

    My, New Hope Corporation Limited Interim Half Year Report — January 2006.

  2. Slide 2: Highlights — Interim Half Year Report

    y Nee) Highlights — Interim Half Year Report New Hope Corporation Limited to 3 ] st Ja Nn var 2006 + Listed on ASX with Washington H. Soul Pattinson shareholding of 61.6 % + Group profit after tax of $40.3 million = Australian operations result up by 80%. — Last year comparative $42. 1m (including o

  3. Slide 3: Production & Sales Statistics

    ee Production & Sales Statistics Corporation Limited| Production* 1.823 1.831 Domesticsales |. 0.664 ~—S «4 -~—C«O BO

  4. Slide 4: Acland Location

    ea ie Acland Location Corporation Limited| / Meandu (Rio Tinto)’ GlenWilga (Farong) Kogan ‘Creek (Aberdare) Kogan Creak Powar'Siation “yar under construction: ~ Wilkio Créek (Poabody} ome Hate Millmerran Power Station

  5. Slide 5: Acland Stage II Expansion

    Mee Acland Stage II Expansion Corporation Limited| Initial Design Capacity | 700 TPH feed rate 2.0 MTPA 2.45 MTPA Stage Il Expansion | 350 TPH feed rate}. 1.0 MTPA ~4.20 MPTA Seer fo | 3.65 MTPA

  6. Slide 6: Acland Expansion Facilities

    Me Acland Expansion Facilities Corporation Limited| © Existing Enfrastructure in Black Stage 2 Expansion in Blue REWORK COAL AUSTRALAS, CRAP COAL, BRE IENT ‘Sage 8 twronstess

  7. Slide 7: Queensland Bulk Handling (QBH)

    Mee Queensiand Bulk Handling (QBH) Corporation Limited| Owned 50:50 by New Hope and Patrick Corporation ~* Throughput of 2.2mt (1.8mt for previous equivalent period) - = 4.2mt record for year ending December 2005 + Brisbane Port remains congestion free as a despatch coal

  8. Slide 8: Exploration Activities

    vo Exploration Activities Corporation Limited| + Activity is centred around — Acland on the Darling Downs — Central Queensland coal fields + Acland thermal coal resource and quality ~ confirmation programme has been active for. -12 months and will continue to mid 2007

  9. Slide 9: Exploration Activities (cont)

    vo Exploration Activities (cont) Corporation Limited| | * Central Queensland exploration has identified possible indications of underground hard coking coal resources | — Lenton = Saraji East

  10. Slide 10: Lenton Project Location

    rN New Hope Corporation Limited| Lenton Project Location Rail aporox. 3okrn |

  11. Slide 11: Lenton Project

    Mae Lenton Project Corporation Limited| + Structural repeat of the coal seams hosting the Burton Coal Mine of Peabody (2 kms to the east) ~ Exploration target is a mix of open cut coking coal and thermal coal, combined with underground coking coal ‘resources -

  12. Slide 12: wage

    wage a yan ste ba ep. . ro TARGET: Leichhardt-Vermont Seam — Intersected 3.2m at 267.8m depth Quality - Coking Coal

  13. Slide 13: Saraji East Location

    vo Saraji East Location Corporation Limited| Most prospective Dysart Seam occurrence for underground development. North-South Long Section / Most prospective Harrow Creek Seam occurrence for underground development Oysart Moranbah Road

  14. Slide 14: Saraji East Project

    vo Saraji East Project Corporation Limited| ~ Down dip coal seam extensions of those mined at the BMA Saraji open cut mine + Exploration target is for underground hard coking coal resources ad Preliminary drilling has confirmed the presence of two potential ~-underground coal mining horizons: ~ Uppe

  15. Slide 15: Saraji East — Indicative Coal Quality

    ve Saraji East — Indicative Coal Quality Corporation Limited| Seam Thickness (m) 44 3.7 Simulated Yield (% ad) 75.8 79.5 | Simulated Ash (% ad) 95 90 Volatile Matter(% ad) | ttit«é‘i 47.0.

  16. Slide 16: Financial Summary

    Meee Financial Summary Corporation Limited| + New Hope has returned $180 million to shareholders + Remaining funds ($400 + million) to be used in optimising base business, expanding existing capacity, exploration a and. development as well as investment i in complimentary - businesses BSS!

  17. Slide 17: Pricing Outlook

    vo Pricing Outlook Corporation Limited| + Coal pricing volatility will be influenced by both buyer and seller operating costs including transport costs, which will influence power generators choice of multiple energy fuel alternatives and supply sources — . Lower sales volume expected over remaining