Orbit Resources Limited · ASX:OBT

Orbit Resources — Godolphin Resources — Noosa Mining Investment Conference 2024

21 slides from Orbit Resources's conference presentation, Nov 13, 2024

  1. Slide 1: Godolphin Resources Limited

    Godolphin Resources Limited Gold, copper, base metals and rare earths in Australia’s best mining jurisdiction 1 3 N o v e m b e r 2 0 2 4 | A S X : G R L NO O SA MIN IN G IN VEST MEN T CO N FER EN C E RARE EART H ELEM EN T S | COP P ER -G OLD -BASE M ETALS

  2. Slide 2: Disclaimer and Competent Persons Statement

    DISCLAIMER AND COMPETENT PERSONS STATEMENT C O M P E T E N T P E R S O N S S TAT E M E N T JORC INFORMATION The Presentation has been prepared with reference to public reports made by Ardea Resources Limited (Ardea) (ASX:ARL) and Godolphin Resources Limited (Godolphin or Company) (ASX:GRL). Notably,

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT Major shareholders % held American Rare Earths Limited (ASX:ARR) 8.58% Shares on Issue Options on Issue Brian O’Shannassy & Associates 3.42% 316.2m 89.3m Ian Buchhorn & Associates 3.37% Market Capitalisation Share Price Calama Holdings Pty Ltd 3.13% 5.7m $0.018 Saba Nominees Pty L

  4. Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS Focused on the exploration and development of Maiden JORC 2012 MRE* at Narraburra Rare Earth gold, copper, base metals and critical minerals project to 94.9Mt @ 739 ppm including high grade projects across a large tenement suite in NSW core of 20Mt @ 1,079 TREO using a 600 ppm

  5. Slide 5: Significant Foothold in NSW

    SIGNIFICANT FOOTHOLD IN NSW A S TA B L E J U R I S D I C T I O N Project suite: • Lewis Ponds (100%) – Gold, copper and base metals • Narraburra (100%) – Rare earth elements (REE) • Cambrai (100%) – REE, tin and copper • Trungley (100%) – REE • Yeoval (100%) – Copper and gold • Copper Hill East (100

  6. Slide 6: Lewis Ponds Gold, Copper & Base Metals Project

    LEWIS PONDS GOLD, COPPER & BASE METALS PROJECT • Project covers ~148km2 and is located 15km east of Orange, NSW • Area was an active historical mining centre – project hosts extensive historic gold and base metals workings • Project has a JORC 2012 Inferred MRE of 6.2Mt @ 2.0 g/t gold, 80 g/t silver

  7. Slide 7: Lewis Ponds Exploration Potential

    LEWIS PONDS DISCLAIMER EXPLORATION AND COMPETENT POTENTIAL PERSONS STATEMENT • Spicers & Toms Lodes open to the north, south and at depth – no drilling undertaken to date • Large gaps within the resource – infill drilling can provide upside • Untested Downhole EM off hole conductors – not tested to

  8. Slide 8: Lewis Ponds Exploration Potential

    LEWIS PONDS EXPLORATION POTENTIAL INCREASING THE LEWIS PONDS OPPORTUNITY Results from an orientated soil survey north of known mineralisation at Lewis Ponds identified areas of elevated gold in soils, co-incident with VTEM anomalies with a similar signature to the main mineralised lodes at Lewis Pon

  9. Slide 9: Narraburra: Rare Earth Optionality with Scale Potential

    NARRABURRA RARE EARTH OPTIONALITY WITH SCALE POTENTIAL Identified by the Australian Government Department of Industry, Science and Resources in 2022 Critical Minerals Strategy as a major REE deposit – also listed as a critical minerals project by the Government’s Trade and Investment Commission. Mai

  10. Slide 10: Narraburra Rare Earth Distribution

    NARRABURRA RARE EARTH DISTRIBUTION T OTA L R A R E E A R T H O X I D E S ( T R E O ) V E R S U S T OTA L P E R M A N E N T M AG N E T M I N E R A L O X I D E S (MREO) DISTRIBUTION 2 MREO 24% 1 TREO = 550.45ppm 76% 1 Total Rare Earth Oxides (TREO) = Total REOs (La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 +

  11. Slide 11: Narraburra: Low Cost Development Potential

    NARRABURRA LOW COST DEVELOPMENT POTENTIAL Outstanding metallurgy results point to low-cost development & processing potential Testing completed with Australian Nuclear Science and Technology Organisation (ANSTO) Phase 1: 2023 delivered 92% recovery of key magnet REEs (Pr, Nd, Tb, Dy) with best resul

  12. Slide 12: MREC (Mixed Rare Earth Carbonate)

    MREC (Mixed Rare Earth Carbonate) MREC composition indicate a high value product due to high concentrations of Tb and Dy and low impurities Slurry leach results indicate MREO extraction rates up to 90% with limited deleterious element (impurity) extraction and low (1.2kg/t) acid consumption Phase 3

  13. Slide 13: MREC Composition

    Godol " of MR of TREO R R of TREO LazOe 0.58 8.13 $0.05 $0.08 0.2% | 21.6 $0.12 0.8% | 33.00 $0.18 $0.32 1.49 ce. 1.01 9.09 $0.09 $0.16 05% | 0.73 $0.01 0.0% | 0.79 $0.01 $0.01 0.1% PreOrs 60.30 2.46 $1.48 $2.59 7.3% | 4.21 $2.54 17.0% | 4.90 $2.96 $5.16 22.1% NdzO3 60.30 8.65 $5.22 $9.05 25.7% | 14

  14. Slide 14: Investment Summary

    INVESTMENT SUMMARY EXCEPTIONAL OPTIONALITY & MULTICOMMODITY EXPOSURE • Extensive foothold in the Lachlan Fold Belt, NSW’s premier mining and exploration jurisdiction • Four JORC 2012 MREs across project suite with a current resource inventory of 519koz gold • JORC 2012 Inferred MRE at Lewis Ponds of

  15. Slide 15: 6 Month Exploration Timeline October 24 - March 25

    6 MONTH EXPLORATION TIMELINE – October 24 –March 25 LEWIS PONDS LEWIS PONDS ONGOING COMMENCEMENT LEWIS PONDS M E TA L L U R G I C A L LEWIS PONDS M E TA L L U R G I C A L DRILLING OF LEWIS PONDS STUDY M R E U P DAT E STUDY U P DAT E S A S S AY R E S U LT S DIAMOND COMMENCES RESULTS DRILLING FIRST MR

  16. Slide 16: Contact

    CONTACT GODOLPHINRESOURCES.COM.AU Jeneta Owens – Managing Director [email protected] 10/259 Clergate Rd Orange, NSW, 2800 Australia +61 417 344 658

  17. Slide 17: Appendix: Copper, Gold and Base Metals Projects Overview

    APPENDIX 1 CO P P E R , G O L D A N D BA S E M E TA L S PROJECTS OVERVIEW Lewis Ponds: • JORC 2012 Inferred Mineral Resource Estimate of 6.20 Mt at 2.0g/t gold, 80g/t silver, 2.7% zinc, 1.6% lead and 0.2% copper • Resource is part of a larger mineral system extending over 9km SE with extensive gold,

  18. Slide 18: Appendix 2: Unlocking Value at Lewis Ponds

    APPENDIX 2: UNLOCKING VALUE AT LEWIS PONDS Grade Contained metal Tonnage Class (Mt) Au (g/t) Ag (g/t) Zn ((%) Pb (%) Cu (%) AuEq (g/t) Au (koz) Ag (moz) Zn (kt) Pb (kt) Cu (kt) Inferred 6.2 2.0 80 2.7 1.6 0.2 6.0 398 15.9 170 99 11 Total 6.2 2.0 80 2.7 1.6 0.2 6.0 398 15.9 170 99 11 *Lewis Ponds Res

  19. Slide 19: Appendix: Yeoval Copper Gold Project

    APPENDIX 3 YEOVAL COPPER GOLD PROJECT Yeoval Project (EL8538) covers ~290km2 , with over 60 historic copper- gold mine workings along 20km strike length Typical porphyry Cu-Au style mineralisation at Yeoval with disseminated and vein-hosted chalcopyrite, molybdenite and bornite Recent diamond drilli

  20. Slide 20: Appendix: Copper Hill East Copper and Gold Project

    APPENDIX 4 COPPER HILL EAST (CHE) COPPER AND GOLD PROJECT • Project located in the same volcanic sequence as Boda (50km north) and Cadia- Ridgeway (50km south) • Two drilling phases completed in 2020 • Preliminary indications from work include: ⚬ Copper and gold in soils anomaly ⚬ Minimum of 7km str

  21. Slide 21: Appendix: CHE Turrawonga Copper Gold Porphyry Potential

    APPENDIX 4 CHE TURRAWONGA – COPPER GOLD PORPHYRY POTENTIAL • Prospect hosts a magnetic anomaly with coincident Au/Cu anomaly-tested with four RC drill holes, two with diamond tails • Drill holes intersected: ⚬ Multiple intrusions ⚬ Zones of strong magnetite and pyrite ⚬ Chlorite-epidote-albite alter

Godolphin Resources — Noosa Mining Investment Conference 2024 on 6ix