Lion Rock Resources Inc · TSXV:ROAR
Lion Rock Resources — Investor Presentation (October 2026)
15 slides from Lion Rock Resources's investor presentation, October 2026
Slide 1: Building a US Critical Minerals Powerhouse
73 50 3 79 Ta Sn Li Au CORPORATE PRESENTATION | OCTOBER 2026 Building a US Critical Minerals Powerhouse Tantalum, tin and lithium at the past-producing Volney Project in South Dakota’s Black Hills, with a new gold discovery on the same property. TSXV: ROAR | OTCQB: LRRIF | FSE: KGB
Slide 2: Important Disclosure
LEGAL Certain statements contained herein may constitute “forward-looking information” within the meaning of Canadian securities legislation. Forward-looking information is often, but not always, identified by the use of Important words such as “anticipate”, “plan”, “estimate”, “expect”, “may”, “wil
Slide 3: A US Critical Minerals Past Producer
WHY LION ROCK A US Critical Minerals Past Producer 1,080 t of spodumene (lithium) concentrate for the US war effort, 1941–44, under a government contract LITHIUM CONCENTRATE TIN CONCENTRATE TANTALUM CONCENTRATE 5.6–6.3% Li₂O 30.7% Sn 38.7–57% Ta₂O₅ Tantalite concentrate was shipped to US processing
Slide 4: Three Minerals America Needs
WHY THESE MINERALS Three Minerals America Needs 73 50 3 Ta Tantalum Sn Tin Li Lithium 100% 77% >50% US import reliance, 2021–25 US refined tin import reliance, 2025 US import reliance, 2023–25 Not mined in the US since 1959 Not mined in the US since 1993 Chile and Argentina lead US supply Supply con
Slide 5: Why Tantalum Matters
TANTALUM 73 Ta Why Tantalum Matters Tantalum Up to 25 68% US$243/lb tantalum capacitors on boards housing Nvidia of 2025 world mine supply came from conflict- 30% tantalum ore, CIF China, October 19, 2026 H100 cards risk countries, the DRC and Rwanda CONFLICT-RISK SUPPLY 68% ELSEWHERE 32% DRC Rwanda
Slide 6: Licensed and Bonded to Mine Pegmatite
READY TO MOVE Licensed and Bonded to Mine Pegmatite PERMITTING IN PLACE AT VOLNEY Typical US mine PERMITS 7 to 10 years to permit County CUP Granted Volney State mining license Issued Reclamation bond Posted TODAY Permits in hand 0 5 10 yrs SITE 142 ha of private land In South Dakota, pegmatite mine
Slide 7: A Proven District
LOCATION AND ACCESS A Proven District 142 ha of private land All-season road access to site I-90 at Spearfish; ~113 km (70 mi) to Rapid City rail ~22 km from the historic Homestake Mine, 40M+ oz Au produced Wharf Mine (Coeur Mining) operating in the same district Mineralization at nearby properties
Slide 8: Phase 1 Drill Results
PHASE 1 DRILLING Phase 1 Drill Results 15 holes, ~3,600 m. Lithium, tin and tantalum from surface, open in all directions. 2.3% Li₂O 5.7 m VOL24-007 0.8% Li₂O 25.4 m VOL24-004 0.3% Sn 3.0 m VOL24-006 3,715 ppm Ta₂O₅ 1.0 m VOL25-013 788 ppm Ta₂O₅ 5.9 m VOL25-010 >0.1% Li₂O >0.1% Sn Completed drill ho
Slide 9: Extending the System
2026 SURFACE PROGRAM Extending the System Mineralization identified up to ~300 m beyond previously reported mineralization. Quartz muscovite (Sn-Ta) Spodumene quartz (Li-Ta) Amblygonite (Li) Microcline / quartz albite Monzonite / mica schist Pegmatite sample Cassiterite sample (Sn) Tantalite sample
Slide 10: A New Gold Discovery
A SECOND SYSTEM: GOLD A New Gold Discovery 500 m × 400 m × 200 m system, open in all directions. 10.9 m @ 2.0 g/t Au VOL25-006 within 24.8 m @ 0.8 g/t Au 4.6 m @ 2.1 g/t Au VOL25-002 within 36.5 m @ 0.5 g/t Au 23.2 m @ 1.1 g/t Au VOL25-013 2.1 m @ 5.0 g/t Au VOL25-014 1.6 m @ 4.1 g/t Au VOL25-009 1.
Slide 11: Routes to Potential Production
INFRASTRUCTURE Routes to Potential Production 01 Shallow system Mineralization starts at surface, and the largest intervals sit less than 40 m deep, supporting evaluation of open-pit options. 02 Direct-shipping potential Near-surface pegmatite could potentially be shipped to processing facilities wi
Slide 12: Phase 2 and Upcoming Catalysts
WHAT COMES NEXT Phase 2 and Upcoming Catalysts 01 COMPLETE 02 PHASE 2 State mining license Definition and expansion drilling State mining license issued, complementing the county CUP for Define continuity of tantalum, tin and lithium mineralization within the pegmatite mining. Establishes the permit
Slide 13: Capital Structure
CORPORATE Capital Structure FULLY DILUTED MARKET DATA 173.8M Share price $0.22 Market capitalization $25.5M SHARES OUTSTANDING WARRANTS OPTIONS TSXV: ROAR 115.9M 47.5M 10.4M OTCQB: LRRIF 66.7% of fully diluted 27.3% of fully diluted 6.0% of fully diluted FSE: KGB Share structure as of October 5, 202
Slide 14: Management, Board and Advisors
LEADERSHIP Management, Board and Advisors MANAGEMENT BOARD OF DIRECTORS ADVISORS R. Dale Ginn, P.Geo. Laurence Farmer Col. Leon Ray, USAF (Ret.) President & CEO, Director Director Advisor 30+ years as a geologist and executive; General Counsel and Corporate Secretary, 31 years in the US Air Force; f
Slide 15: Investor Contact
INVESTOR CONTACT EMAIL [email protected] PHONE +1 604 678 5308 WEB LionRockResources.com TSXV: ROAR | OTCQB: LRRIF | FSE: KGB
Lion Rock Resources — Investor Presentation (October 2026) on 6ix