Slide 1: Q1 FY27 Quarterly Results
Q1 FY27 Quarterly Results 29 October 2026 Presented by: Andre Labuschagne
Slide 2: Disclaimer
DISCLAIMER This investor presentation has been prepared by Aeris Resources Limited (“Aeris” or the “Company”). By attending an FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS investor presentation or briefing, or accepting, accessing or reviewing this presentation, you acknowledge and agree to Thi
Slide 3: Disclaimer
DISCLAIMER DISCLAIMER NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES To the maximum extent permitted by law, Aeris and each of its respective related bodies corporate, shareholders and This Presentation does not constitute an offer to sell, or the solicitation of an offer to buy, any securitie
Slide 4: Aeris Resources
AERIS RESOURCES Australian mid-tier, copper and gold producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x
Slide 5: Group Q1 Summary
FY27 Unit Jun 26 QTR Sep 26 QTR Guidance GROUP Q1 SUMMARY Safety – LTIFR Copper produced /mmhr kt 4.6 6.5 5.1 5.9 22 – 27 Solid quarter, operations on track Gold produced koz 12.9 10.8 42 – 51 Silver produced koz 71.5 48.8 130 – 160 Cu eq production1 kt 11.3 9.3 37 – 46 Copper equivalent production
Slide 6: Tritton
TRITTON- New South Wales
Slide 7: Tritton Q1 Results
Jun 26 Sep 26 FY27 Production Summary Unit QTR QTR Guidance TRITTON Q1 RESULTS Ore Mined Mined Grade kt % Cu 615.9 1.46 756.5 1.08 - - Ore Milled kt 451.1 452.0 - Production ahead of plan Milled Grade % Cu 1.61 1.47 - Recovery % Cu 90.1 88.4 - Copper Produced kt 6.5 5.9 22 – 27 Gold Produced koz 2.4
Slide 8: Avoca Tank
AVOCA TANK Additional ore included in FY27 mine plan
Slide 9: Constellation Update
CONSTELLATION UPDATE Construction Construction underway Underway Site construction underway Mining Lease 5km of 25km haul road completed and sealed Granted 22 July 2026
Slide 10: Constellation Waste Stripping
CONSTELLATION WASTE STRIPPING Construction Construction underway Underway Mining Lease Granted 22 July 2026
Slide 11: Cracow
= 9 < oe 8 xe) tes xe) n (a ® 0) 5) ©)
Slide 12: Cracow Q1 Results
FY27 Production Summary Unit Jun 26 QTR Sep 26 QTR Guidance CRACOW Q1 RESULTS Ore Mined Mined Grade Ore Milled kt g/t kt 150.3 2.33 167.1 127.4 2.24 157.3 - - - Strong mined and milled tonnes Milled Grade g/t 2.20 1.97 - Recovery % Au 88.9 88.4 - Gold Produced koz 10.5 8.8 34 – 41 Gold Sold koz 10.8
Slide 13: Golden Plateau
GOLDEN PLATEAU Material increase to Mineral Resource1 Grade Contained Metal Tonnes Deposit Category Au Ag Au Ag (kt) (g/t) (g/t) (koz) (koz) 220% increase in contained gold metal Measured 95 2.8 8 8.4 23 Indicated 910 2.1 5 60 160 Open Pit Measured and Indicated Mineral Resources now Inferred 1,500
Slide 14: Golden Plateau
GOLDEN PLATEAU Construction Construction underway Underway Mining Lease Granted 22 July 2026 Jun 26 MRE Drill hole Oct 26 MRE Drill hole
Slide 15: Projects and Corporate
PROJECTS AND CORPORATE
Slide 16: Group Projects
GROUP PROJECTS Base metals exploration at Jaguar Assays back from drill program testing 8 base metals anomalies Encouraging results including low level sulphide mineralisation and pathfinder elements returned from Ceberus, Atalanta, Hera and Panther prospects1 Downhole EM logging of the Panther hole
Slide 17: Corporate
CORPORATE Closing cash and receivables of $178.7 million after significant capital investment Jun 26 Sep 26 (A$ Million) QTR QTR Closing Cash 164.9 127.8 Receivables – Tritton 37.4 50.8 Useable Cash and Receivables 202.3 178.7
Slide 18: Corporate: Q1 cash flow
CORPORATE Q1 cash flow ($ million) Note - Projects include, Stockman and Jaguar
Slide 19: Aeris Resources
AERIS RESOURCES Australian mid-tier, copper and gold producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x
Slide 20: 7) Reris
= 7) Reris
Slide 21: Appendix
APPENDIX
Slide 22: FY27 Guidance
FY27 GUIDANCE Group FY27 Guidance FY26 Actual Tritton FY27 Guidance FY26 Actual Production Production Copper kt 22 - 27 23 Copper kt 22 - 27 23 Gold koz 42 - 51 49 Gold koz 8 - 10 8 Silver koz 130 - 160 256 Silver koz 100 - 130 229 Copper equivalent kt 37 - 46 42 Operating Costs Operating Costs Mine