Newmont Corporation · NYSE:NEM

Newmont — Technical Presentation (February 2020)

41 slides from Newmont's technical presentation, Feb 27, 2020

  1. Slide 1: Peñasquito Site Tour

    Peñasquito Site Tour FEBRUARY 2020 PEÑASQUITO SITE TOUR 2.27.2020

  2. Slide 2: Cautionary Statement

    Cautionary Statement CAUTIONARY STATEMENT REGARDING FORWARD LOOKING STATEMENTS: This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended

  3. Slide 3: Safety reminders

    Safety reminders ▪ Safety glasses and hard hats to be worn at all times ▪ Hearing protection and gloves to be worn at the plant ▪ Dust masks to be worn at the plant and the mine ▪ Wear closed toe, flat heeled boots on site ▪ Maintain three points of contact at all times ▪ Please reference Camp map a

  4. Slide 4: Camp map and evacuation map

    Camp map and evacuation map PEÑASQUITO SITE TOUR 2.27.2020 NEWMONT CORPORATION 4

  5. Slide 5: Newmont site tour hosts

    Newmont site tour hosts TOM PALMER ROB ATKINSON NANCY BUESE STEVE GOTTESFELD President and CEO EVP and COO EVP and CFO EVP S&ER DANIEL JANNEY RYAN SWEDBURG TIM SMITH JESSICA LARGENT Regional SVP North Regional CFO North Regional Dir. Generative VP Investor Relations America America Exploration North

  6. Slide 6: World-class, poly-metallic operation

    World-class, poly-metallic operation % OF 2020E GEO* PRODUCTION ▪ Largest gold mine, second largest silver mine and one of the largest producers of zinc and lead in Mexico Peñasquito ▪ Low-cost gold operation with significant co-product revenue Nevada Gold 20% Mines ▪ Expected to produce an average

  7. Slide 7: Driving a fatality, injury and illness free workplace

    Driving a fatality, injury and illness free workplace ▪ Focusing on consistent application of Fatality Risk Management program ▪ Learning from Significant Potential Events and hard wiring into Fatality Risk Management system ▪ Rapidly replicating live work elimination improvements from across Newmon

  8. Slide 8: Substantial social investment in local communities

    Substantial social investment in local communities ▪ Directly employs more than 5,300 people, while supporting another 20,000 indirect jobs in the region ▪ Over 75% of union employees are from Zacatecas and nearly 300 employees are female ▪ Since 2005, invested >$5 billion in Peñasquito with the dev

  9. Slide 9: Communities surrounding Peñasquito

    Communities surrounding Peñasquito PEÑASQUITO SITE TOUR 2.27.2020 NEWMONT CORPORATION 9

  10. Slide 10: Peñasquito community and environmental context

    Peñasquito community and environmental context 2016 Today Unsteady Created plan for environmental Forming Supportive relationship with 24 Exploration 2007 relationship with impacts (Dust, Water-TSF, sustainable, long- communities, union, state and Sediments), closed 322 historical term solution nati

  11. Slide 11: Newmont community relations leadership in 2019

    Newmont community relations leadership in 2019 FEBRUARY 2019 JUNE 14th OCTOBER 8th OCTOBER 26th NOVEMBER 4th NOVEMBER 20th FEBRUARY 2020 Local haul truck Blockade lifted; Blockade lifted; State Governor Restart of Mediation All parties continue contractor stopped 60-day however, operation issued pub

  12. Slide 12: Peñasquito leadership team

    Peñasquito leadership team ▪ Appointed General Manager for Peñasquito in January 2020, moving across from Boddington ▪ Prior to joining Newmont, worked at Rio Tinto Iron Ore as a General Manager and Project Director of Hope Downs ▪ Extensive experience in the mining industry, with responsibility for

  13. Slide 13: Peñasquito leadership team (continued)

    Peñasquito leadership team (continued) ▪ Joined the Company in 2015 and was recently ▪ Joined the company in September 2018 with 39 years of appointed Fixed Asset Manager experience in maintenance (28 years in mining) ▪ 30 years of experience in the Mining and Oil and Gas ▪ Before joining the Peñasq

  14. Slide 14: Peñasquito leadership team (continued)

    Peñasquito leadership team (continued) ▪ Before accepting the role of Site Business ▪ Appointed to Communications Manager in Manager, Jesus was the Finance and December 2018 Administration Director since October 2017 ▪ Joined the Company in 2011 as the ▪ Over 10 years of experience in Mining and Fin

  15. Slide 15: Peñasquito site details

    Peñasquito site details World-class, polymetallic operation OWNERSHIP: 100% LOCATION: 780km northwest of Mexico City, state of Zacatecas OPERATIONS: Two open pits – Peñasco and Chile Colorado PROCESS: Sulfide processing plant – producing lead and zinc concentrates. Concentrate tailings are processed

  16. Slide 16: Peñasquito – Comprehensive Mining Fleet

    Peñasquito – Comprehensive Mining Fleet Loading Komatsu: Komatsu (PC8000 x 2) WA1200 (x 2) (PC5500 x 1) Caterpillar Hitachi WA1200 (x 2) 495HR (x 5) (EX2500 x 1) Parked Hauling Komatsu K930 (x 79) CAT777 (x 4) Water Trucks Komatsu K930 K930 (x 2) (x 4) Parked (x 6) Parked HD785 (x 7) Drilling / Auxi

  17. Slide 17: Peñasquito production outlook

    Peñasquito production outlook* TOTAL GEO AND GOLD PRODUCTION (KOZ) 2020E GEO BREAKDOWN 2,000 1,750 1,750 1,800 1,600 1,550 1,600 1,450 Zinc Gold 1,400 28% 37% 1,200 1,000 800 650 575 550 Silver 600 500 Lead 450 25% 10% 400 200 - 2020E 2021E 2022E 2023E 2024E Total GEOs Gold Production *See endnotes

  18. Slide 18: Peñasquito production outlook details

    Peñasquito production outlook details* Metric 2020E 2021E 2022E 2023E 2024E Tonnes milled: All products (k tonnes) 37,000 39,000 39,000 39,000 39,000 Average ore grade milled: Gold (g/tonne) 0.700 0.750 0.560 0.660 0.575 Silver (g/tonne) 30.75 30.25 33.00 37.15 38.05 Zinc 0.75% 0.70% 0.70% 0.90% 0.9

  19. Slide 19: Appendix

    Appendix PEÑASQUITO SITE TOUR 2.27.2020

  20. Slide 20: Peñasquito reserves (metric units)

    Peñasquito reserves* (metric units) Attributable Proven, Probable and Combined Gold Reserves , Metric Units December 31, 2019 Proven Reserves Probable Reserves Proven and Probable Reserves Newmont Tonnage Grade Gold Tonnage Grade Gold Tonnage Grade Gold Metallurgical Deposits/Districts Share (x1000

  21. Slide 21: Peñasquito resources (metric units)

    Peñasquito resources* (metric units) Attributable Gold Mineral Resources - December 31, 2019, Metric Units Measured Resource Indicated Resource Measured and Indicated Resource Inferred Resource Newmont Tonnage Grade Gold Tonnage Grade Gold Tonnage Grade Gold Tonnage Grade Gold Deposits/Districts Sha

  22. Slide 22: Santa Rosa and Santa Cruz Drilling Results

    Santa Rosa and Santa Cruz Drilling Results Historic Drill Results - Santa Rosa Historic Drill Results - Santa Cruz Drilled Drilled Hole No. Azimuth Dip From (m) To (m) Au g/t Ag g/t Zn % Pb % Hole No. Azimuth Dip From (m) To (m) Au g/t Ag g/t Zn (%) Pb (%) Width (m) Width (m) SC-01-18 14.0 108.0 94.

  23. Slide 23: Endnotes

    Endnotes Investors are encouraged to read the information contained in this presentation in conjunction with the most recent Form 10-K for the year ended December 31, 2019 filed with the SEC on February 20, 2020, and with the Cautionary Statement on slide 2 and following notes below. Outlook Assumpt

  24. Slide 24: Storyboards

    Storyboards PEÑASQUITO SITE TOUR 2.27.2020

  25. Slide 25: Peñasquito Overview

    Peñasquito Overview LARGEST ▪ World-class polymetallic operation GOLD ▪ ~3,000 employees, ~2,300 contractors PRODUCER IN MEXICO ▪ Strong relationship with unionized workforce ▪ Average ex-pit movement of 200Mt/year ▪ 12-year reserve life ▪ 2019 gold Reserves*: 8.1Moz at 0.57 g/t ▪ 2019 GEO Reserves*

  26. Slide 26: Peñasquito: The Next Boddington

    Peñasquito: The Next Boddington BODDINGTON HISTORY PEÑASQUITO OPPORTUNITY ▪ Step change improvement since 2013 with ▪ Full Potential transforming operation by cumulative Full Potential savings >$300M per eliminating constraints, reducing costs and annum increasing productivity ▪ Reserves and Resourc

  27. Slide 27: Newmont's Full Potential Process

    Newmont’s Full Potential Process Diagnose Design Deliver Refresh 4 months 12 to 18 months ▪ Develop early hypotheses ▪ Design initiatives, ▪ Implement initiatives implementation plans and ▪ Prioritize and agree on ▪ Monitor progress and KPI’s for tracking delivery opportunities to pursue capture val

  28. Slide 28: Newmont's Full Potential Process

    Newmont’s Full Potential Process Diagnose Design Deliver Refresh DIAGNOSIS AND OPPORTUNITY PRIORITIZATION Processing Mining Asset management External Spend Important Very Legend ~$10M run-rate value Important Less DESIGN AND DELIVERY Processing Mining Asset Management External Spend 5 out of 9 initi

  29. Slide 29: Full Potential Growing Margins

    Full Potential Growing Margins LEVERAGING PROVEN WORLD-CLASS PROGRAM AND TECHNICAL EXPERTISE 2022 FULL POTENTIAL BENEFITS BY AREA Supply Chain - Full Potential - External Spend Asset Mgmt 19% 3% ▪ 25% cost efficiencies Full Potential - Full Potential - Processing ▪ 75% production improvement 59% Min

  30. Slide 30: Near Mine Exploration

    Near Mine Exploration LEVERAGING FULL POTENTIAL AND EXPLORATION TECHNOLOGY TO GROW RESERVES AND RESOURCES ▪ Au-Ag-Zn-Pb deposits related ▪ 2019 Reserves ▪ Near mine exploration focused to breccia pipes; developed ▪ 8.1Moz gold @ 0.57 g/t on wingspan extensions and from hydrothermal activity deeper p

  31. Slide 31: Prospective District Exploration

    Prospective District Exploration BUILDING PIPELINE OF EXPLORATION TARGETS ▪ Brownfield target geologic models being ▪ Applying Newmont’s proprietary technology to developed (Santa Rosa and Santa Cruz) uncover geologic anomalies ▪ Prioritizing Peñasquito-style models and ▪ Geophysical deep sensing an

  32. Slide 32: Santa Rosa Recent Drilling

    Santa Rosa Recent Drilling SANTA ROSA: GEOLOGY PLAN VIEW SANTA ROSA SECTION 246125 SANTA ROSA SECTION 246287 PEÑASQUITO SITE TOUR 02.27.2020 8

  33. Slide 33: Santa Cruz Recent Drilling

    Santa Cruz Recent Drilling SANTA CRUZ: GEOLOGY PLAN VIEW SANTA CRUZ SECTION 230348 SANTA CRUZ SECTION 229641 PEÑASQUITO SITE TOUR 02.27.2020 9

  34. Slide 34: Mining Overview

    Mining Overview AVERAGE EX- ▪ Two large open pits — Peñasco & Chile Colorado; PIT MOVEMENT mined in staged laybacks OF 200MT PER ▪ Current mining fleet includes: YEAR ▪ 5 CAT 495R electric shovels ▪ 79 Komatsu K930 Haul trucks ▪ 8 Epiroc Autonomous drills MINE SEQUENCE STRIP RATIO & GEO GRADE (G/TON

  35. Slide 35: Full Potential: Mining

    Full Potential: Mining OPTIMIZING FLEET AND IMPROVING PRODUCTIVITY ▪ Focused on back-to-basics mining practices EFFICIENT HAULAGE ▪ Driving cost efficiencies and capital discipline to extend life Delivered: ✓ Shutdown near-pit sizing conveyor ~$20M 1.9 mins~4% reduction ✓ Parked excess fleet ~$8M ✓

  36. Slide 36: Processing Overview

    Processing Overview THROUGHPUT ▪ One primary crusher TARGET OF 39 ▪ Augmented feed circuit including secondary MT PER YEAR crusher, pebble crushers and high pressure grinding rolls ▪ Two SAG mills ▪ Four ball mills ▪ Four-step flotation circuit ▪ Produces lead and zinc concentrates and gold dore ▪ P

  37. Slide 37: Crushing & Milling

    Crushing & Milling Augmented Feed Circuit Comminution Circuit SECONDARY COARSE CRUSHER ORE STOCK PEBBLE CRUSHERS HPGR SAG MILLS BALL MILLS PEÑASQUITO SITE TOUR 02.27.2020 13

  38. Slide 38: Full Potential: Processing

    Full Potential: Processing INCREASING THROUGHPUT AND RECOVERIES ▪ Transition to harder rock (increased MILL THROUGHPUT sedimentary ore) impacting throughput Full-Potential Throughput Upside (Mtpa, 2019-2022) ▪ Nearly 20% improvement in throughput 6.0 expected by 2024 despite harder rock 0.9 Mine-to-

  39. Slide 39: Pyrite Leach Plant

    Pyrite Leach Plant OVERVIEW 2020 PRIORITIES ▪ First gold – November 2018 ▪ Stabilizing flotation circuit and achieving record concentrate production – Q1 2020 ▪ Newmont’s technical team deployed to accelerate plant ramp-up ▪ Aligning shutdowns with lower head grades ▪ Targeting incremental 40% gold

  40. Slide 40: Tailings Storage Facility (TSF)

    Tailings Storage Facility (TSF) SUPERIOR ▪ 100 meters high, 11 km in perimeter CONSTRUCTION ▪ Rate of rise is 5 meters per year AND STABILITY ▪ Raise construction – downstream on East embankment; centerline on North, South and West embankments ▪ Designed and permitted to contain tailings volume of 8

  41. Slide 41: TSF Management & Governance

    TSF Management & Governance NEWMONT STANDARDS AND TECHNICAL SUPPORT ▪ Internal and external governance supports continuous improvement approach ▪ Independent technical review acknowledges management practices and did not identify any high priority actions ▪ Active member of International Council of

Newmont — Technical Presentation (February 2020) on 6ix