Power Minerals Limited · ASX:PNN

Power Minerals — PepinNini Minerals — Investor Presentation (November 2020)

18 slides from Power Minerals's investor presentation, Nov 11, 2020

  1. Slide 1: Investor Presentation

    PepinNini Minerals ASX:PNN Investor Presentation For personal use only A diversified explorer pursuing world-class discoveries Managing Director Rebecca Holland-Kennedy ABN 55 101 714 989

  2. Slide 2: Disclaimer & Competent Persons Statement

    DISCLAIMER & COMPETENT PERSONS STATEMENT For personal use only • The information in this presentation is published to inform you about PepinNini Minerals Limited and its activities. All reasonable effort has been made to provide accurate information, but we do not warrant or represent its accuracy a

  3. Slide 3: Corporate Snapshot, Board and Management

    Corporate Snapshot Board Management For personal use only Share Price (10/11/20) Shares on issue Chair & Managing Director $0.17 32.75m Rebecca Holland- Argentina Kennedy Options on issue Non Executive Director Director Market cap (10/11/20) (unquoted & exercisable at Andre Wessels Ignacio Celorrio

  4. Slide 4: Projects

    For personal use only Projects

  5. Slide 5: Santa Ines Copper Gold Project – Strategic Location

    Santa Ines Copper Gold Project – Strategic Location For personal use only  Located 80km from Copper Mine Escondida (BHP) on same geological structure  High grade surface samples from historic workings – 21.7% Copper, 0.91g/t Gold, 34.9g/t Silver,  Subsequent surface sampling 3.25% Copper, 0.8g/t

  6. Slide 6: Santa Ines Copper Gold Project – Work done and planned

    Santa Ines Copper Gold Project – Work done and planned For personal use only  Ground IP geophysical survey indicated potential targets for drilling  Drilling permit expected before the end of the year  Drilling planned initially two boreholes – January 2021

  7. Slide 7: Santa Ines Copper Gold Project – Drilling Targets

    Santa Ines Copper Gold Project – Drilling Targets For personal use only  Drilling target 1 to test historic workings  Drilling target 2 to test deeper geophysical target El Obsequio

  8. Slide 8: Musgrave Project - Overview

    Musgrave Project - Overview For personal use only  Project is 100% owned by PepinNini subsidiary NiCul Minerals Ltd  10 tenements 100% NiCul covering 14,003 Mt Caroline km2 Marrawah 0.03%Cu, 0.13%  2 granted exploration licences(EL) 0.25%Cu, 0.07% Ni, 0.17% Co Ni, 0.07% Co  8 applications (ELA)

  9. Slide 9: Musgrave Project Highlights

    Musgrave Project Highlights For personal use only  The most under-explored region of Australia  Targeting magmatic Ni-Cu-Co sulphide discoveries  Priority targets generated from 2016 CSIRO-SA Gov- PNN – airborne electromagnetic survey(AEM)  Core Target: the Pink Slipper Target – a Farm-in JV wit

  10. Slide 10: AEM - Unlocking new discovery targets at Musgrave

    AEM - Unlocking new discovery targets at Musgrave For personal use only Helicopter mounted SkyTem 312 Fast AEM Fixed Wing Tempest® AEM  Collaboration of PNN, CSIRO, SA Govt and Geoscience Australia for airborne electromagnetic(AEM) survey over 31,000km2 of Musgrave Province  Targeting areas previo

  11. Slide 11: Technical innovation delivers enhanced targets

    Technical innovation delivers enhanced targets For personal use only Targets generated by collaboration AEM to be drill tested Musgrave Province Regional Gravity Image pre-2016 collaboration AEM Collaboration AEM is a game changer – delivers enhanced geophysical targets

  12. Slide 12: The Pink Slipper – a once in a century target

    The Pink Slipper – a once in a century target For personal use only Pink slipper target is a bedrock anomaly coincident with the base of a large ultramafic intrusion - a good candidate for sulphide accumulation - the equivalent model to Voisey’s Bay, Canada 124mt @ 1.66% Ni discovered in 1993 and 10

  13. Slide 13: Project highlights timeline update – Momentum building

    Project highlights timeline update – Momentum building For personal use only May 2015 August – September 2016 Target Q4 2021 CSIRO – PNN AEM flown – Tempest® AEM APY grant collaboration airborne and SkyTem 312 Fast AEM Exploration Deed electromagnetic Target Q2 2021 Ironwood Bore survey(AEM) APY agr

  14. Slide 14: Highly efficient exploration model

    Highly efficient exploration model For personal use only  Company owned infrastructure – drilling rigs, equipment and field camp  Immediate rig availability  No time lags and delays for camp set up/ rig deployment  Low cost exploration – with major upside potential

  15. Slide 15: Land access – Strong Relationship, Positive Social Impact

    Land access Anangu Pitjantjatjara Yankunytjatjara Lands For personal use only Strong Relationship - Positive Social Impact

  16. Slide 16: Investment Highlights – Musgrave: a high potential Project

    Investment Highlights – Musgrave: a high potential Project For personal use only  Large tenement holdings – significant terrain, promising geology  Successful exploration methodology - massive sulphides identified within prospective rocks  Value-accretive exploration – with Traditional Owners to

  17. Slide 17: Salta Lithium Brine Project - Argentina

    Salta Lithium Brine Project - Argentina For personal use only ARGENTINA JORC 2012 compliant Lithium carbonate (LCE) Resources Brine blend simulation announced on two projects totalling indicates enriched brine 239,000 tonnes – 63% Measured & evaporate of 3.05% Indicated Grade up to 313mg/l Lithium –

  18. Slide 18: Contact

    For personal use only Contact Rebecca Holland-Kennedy Managing Director PepinNini Minerals Limited T: +61 8 8218 5000 E: [email protected] TARGETING, EXPLORATION, DISCOVERY.

PepinNini Minerals — Investor Presentation (November 2020) on 6ix