PDC Energy Inc

PDC Energy — Petroleum Development — NASDAQ Oil and Gas Conference 2007

32 slides from PDC Energy's conference presentation, Feb 21, 2007

  1. Slide 1: NASDAQ Oil and Gas Conference, London

    NASDAQ Oil and Gas Conference London, England Presenter: Steven R. Williams, CEO March 6, 2007 NASDAQ GSM:PETD

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements This information contains predictions, estimates and other forward-looking statements within the Contact Information: meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Investor Relations Act of 1934. Although the Company believ

  3. Slide 3: Increasing Production

    Increasing Production 18 16 14 12 10 B cfe 8 6 4 2 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Oil Natural Gas This presentation contains predictions, estimates and other forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Se

  4. Slide 4: Increasing Proved Reserves

    Increasing Proved Reserves 400 B illio n C u b ic F e e t E q u iv a le n ts 350 300 250 200 150 100 50 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Oil Natural Gas This presentation contains predictions, estimates and other forward-looking statements within the meaning of Section 27A of

  5. Slide 5: 5-year Stock Performance

    5-year Stock Performance PETD PETD Comps XNG INDU This presentation contains predictions, estimates and other forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Actual results may differ. See slide 4. Sta

  6. Slide 6: Factors Contributing to Success

    Factors Contributing to Success Consistent, scaleable results Lower risk projects Diversification - with focus areas Quality workforce and operations Flexibility to pursue options • Development • Acquisitions • Exploration This presentation contains predictions, estimates and other forward-looking s

  7. Slide 7: Core Operating Areas

    Core Operating Areas Rocky Mountains Michigan Basin 2006 Proved Reserves: 301 Bcfe 2006 Proved Reserves: 19.6 Bcfe 2006 Production: 14.1 Bcfe 2006 Production: 1.6 Bcfe 2007 Production: 24 Bcfe* 2007 Production: 1.8 Bcfe* *Estimated *Estimated Appalachian Basin 2006 Proved Reserves: 35.1 Bcfe 2006 Pr

  8. Slide 8: Core Operating Areas

    Core Operating Areas Active Development Areas This presentation contains predictions, estimates and other forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Actual results may differ. See slide 4. Stateme

  9. Slide 9: Core Operating Areas

    Core Operating Areas Rocky Mountains Michigan Basin Added interests through 1031 Exchange and other Added interests through purchase 1031 Exchange Appalachian Basin Added interests through 1031 Exchange This presentation contains predictions, estimates and other forward-looking statements within the

  10. Slide 10: 2006 Summary

    2006 Summary Capital Expenditures were $155 Million Company bought back 1.6 million shares (10% of outstanding) Production grew from 13.7 Bcfe in 2005 to 17 Bcfe in 2006 (23% increase) Proved reserves grew 30% from 275 Bcfe @ YE 2005 to estimated 350 Bcfe @ YE 2006 Lease sale of $354 Million $90 Mil

  11. Slide 11: Acquisitions Summary

    Acquisitions Summary During December 2006 and January 2007, closed $209 Million in acquisitions ($18 Million non-1031) 3P reserves acquired total an estimated 153 Bcfe (84% proved) Acquisitions primarily in existing operating areas • Wattenberg Field, DJ Basin Colorado • Appalachian and Michigan Bas

  12. Slide 12: Acquisitions Summary (continued)

    Acquisitions Summary (continued) Purchases in Wattenberg Field focus on continued development through re-fracs, Niobrara completions and new locations Purchased remaining interests in 44 older PDC partnerships, increasing working interest percentages in 718 existing wells primarily in Appalachia and

  13. Slide 13: Strategic Focus in 2007 and Beyond

    Strategic Focus in 2007 and Beyond Development operations in core areas • Accelerate development on 1031 property additions Seek strategic acquisitions Develop management, technical and support teams for future needs Seek high potential exploration opportunities Maintain focus on increasing long-ter

  14. Slide 14: 2007 Projected Drilling, Production & Reserves

    2007 Projected Drilling, Production & Reserves

  15. Slide 15: 2007 Operation and Production Forecast

    2007 Operation and Production Forecast 2006 2007E % Increase Gross Exit Rate Production (MMcfe/d) 121 182 50% Net Company Exit Rate Production (MMcfe/d) 53 100 88% Net Company Production (Bcfe) 17 28 65% Drill 419 wells (34 non-operated) 164 re-fracs and/or re-completions Total drill & complete (D&C

  16. Slide 16: Grand Valley Field, Piceance Basin, Colorado

    Grand Valley Field, Piceance Basin, Colorado 148 wells drilled to date YE 2006 daily gross production 45 MMcfed YE 2006 net daily production 13 MMcfed 5,120 Acres available for drilling on 10 acre Spacing 470 locations • 263 PUD locations 137 Planned for Partnership drilling (PDC WI 37%) 126 100% WI

  17. Slide 17: Grand Valley Field, Piceance Basin, Colorado

    Grand Valley Field, Piceance Basin, Colorado Puckett 31-14D 1.3 Bcfe per well 100,000 100,000 10,000 10,000 1.04 net Bcfe @80% NRI D&C cost of $2.0 Million / well Monthly Production Mcf Bo Bw Monthly Production Mcf Bo Bw 1,000 1,000 Development cost of $ 1.92 / Mcfe 100 100 Wells drilled directional

  18. Slide 18: Grand Valley Field, Piceance Basin, Colorado

    Grand Valley Field, Piceance Basin, Colorado 2007 Drilling Drill 56 wells • 42 Partnership (PDC 37% WI) • 14 PDC (100% WI) 29.54 Net wells 30.7 Bcfe added by drilling $59 Million D&C cost 2007 Field Total 6.9 Bcfe net production for 2007 89% increase over 2006 This presentation contains predictions,

  19. Slide 19: Wattenberg Field, DJ Basin, Colorado

    Wattenberg Field, DJ Basin, Colorado 976 wells (drilled and purchased) 2006 gross exit rate 40 MMcfed 2006 net exit rate 18.6 MMcfed 9,000 acres available for drilling 540 locations • 220 40 acre PUD locations • 70 20 acre rule 318-A locations • 250 remaining other locations • 800 Codell and/or Niob

  20. Slide 20: Wattenberg Field, DJ Basin, Colorado

    Wattenberg Field, DJ Basin, Colorado Skurich-Rothe #21-6 (Codell Re-Frac & Niobrara Frac) 0.3 Bcfe per well (includes re- 10,000 10,000 frac) 0.24 net Bcfe @80% NRI 1,000 1,000 D&C cost of $490K per well plus Mcf per Month Bo per Month $180K for re-frac 100 100 Development cost of $ 2.79/Mcfe or $16

  21. Slide 21: Wattenberg Field, DJ Basin, Colorado

    Wattenberg Field, DJ Basin, Colorado Hybrid Niobrara Fracs 2007 Drilling 800 Drill 204 wells 700 • 100 Partnership (PDC 37% WI) 600 • 104 PDC (100% WI) 500 140 Net wells 164 re-completions and re-fracs MCFe/Day 400 300 33.9 Bcfe added by drilling 200 $93 Million D&C cost 100 2007 Field Total 0 1 3 5

  22. Slide 22: NECO Field Area, Eastern DJ Basin, Colorado

    NECO Field Area, Eastern DJ Basin, Colorado 268 operated wells 2006 exit rate 10.7 MMcfed 2006 net exit rate 8.5 MMcfed 29,160 acres available for drilling 8 defined structures (3D and 2D seismic) 107 PUD locations 250 potential locations This presentation contains predictions, estimates and other f

  23. Slide 23: NECO Field Area, Eastern DJ Basin, Colorado

    NECO Field Area, Eastern DJ Basin, Colorado 0.28 Bcfe per well 0.22 net Bcfe @80% NRI D&C cost of $234K per well Development cost of $1.06/Mcfe This presentation contains predictions, estimates and other forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and S

  24. Slide 24: NECO Field Area, Eastern DJ Basin, Colorado

    NECO Field Area, Eastern DJ Basin, Colorado 2007 Plan NECO - Herbert #23-9 Drill 141 wells, PDC 100%WI 10,000 10,000 31 Bcfe added by drilling $33 Million D&C cost 4.5 Bcfe net production for 2007 Mcf per Month Mcf per Month 44% increase over 2006 1,000 1,000 Acquiring 50 square miles of additional

  25. Slide 25: Horizontal Bakken and Nesson Projects, Western Williston Basin

    Horizontal Bakken and Nesson Projects, Western Williston Basin, North Dakota Bakken 6 wells drilled to date (3.8 net) 4 in production Gross production 350 Boe/d Net Company production 275 Boe/d 54,285 Acres available for drilling Nesson 10 wells drilled to date (2.7 net) 7 in production Gross produc

  26. Slide 26: Horizontal Bakken and Nesson Projects, Western Williston Basin

    Horizontal Bakken and Nesson Projects, Western Williston Basin, North Dakota Bakken Nesson Reserves per well 200 MBoe 95 MBoe Net Reserves 160 MBoe 76 MBoe D&C Cost $4.5 Million $2.9 Million Development Cost $28 / Boe $38 / Boe PDC and other operators working to determine: • Optimum horizontal well

  27. Slide 27: Horizontal Bakken and Nesson Projects, Western Williston Basin

    Horizontal Bakken and Nesson Projects, Western Williston Basin, North Dakota Bakken Nesson 2007 Drilling 6 7 Net Wells (PDC 37%) 2.2 2.6 Reserves Added by Drilling 355 MBoe 197 MBoe D&C Cost $10 Million $7.5 Million 2007E Net Production 138 MBoe 103 MBoe Increase from 2006 28% 77% This presentation

  28. Slide 28: Appalachian and Michigan Operation Areas

    Appalachian and Michigan Operation Areas Appalachian Michigan Operated Wells 1455 204 2006 YE Proved Reserves 35.1 Bcfe 19.6 Bcfe 2007 Acquisition Proved Reserves * 30.1 Bcfe 4.6 Bcfe % of 2006 YE Proved 85% 23% 2007E Production* 2.6 Bcfe 1.8 Bcfe Increase from 2006* 86% 20% * 2007 Reserve and produ

  29. Slide 29: Recap

    Recap 2007 will be a busy year Drilling 419 wells Refrac and/or recompletions on 164 wells Production increasing to estimated 100 MMcfe (net) per day by year end 88% increase over year end 2006 Annualized rate of 36 Bcfe Proved reserves increase by >50% during year This presentation contains predict

  30. Slide 30: Reserves (Projected)

    Reserves (Projected) Proved Reserves (Bcfe) YE 2006 YE 2007E Total 356 >500 Producing 147 270 129 Bcfe Proved Reserves added through 1031 acquisitions (1/17/07) YE 2007 PDP reserves an increase of 84% over YE 2006 This presentation contains predictions, estimates and other forward-looking statements

  31. Slide 31: Increasing Production - Projected 2007

    Increasing Production - Projected 2007 30 25 B cf E quivalents 20 15 10 5 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007E Oil Natural Gas This presentation contains predictions, estimates and other forward-looking statements within the meaning of Section 27A of the Securities Act of 1

  32. Slide 32: NASDAQ Oil and Gas Conference, London

    NASDAQ Oil and Gas Conference London, England Presenter: Steven R. Williams, CEO March 6, 2007 NASDAQ GSM:PETD

Petroleum Development — NASDAQ Oil and Gas Conference 2007 on 6ix