FTI Consulting — Canadian Dehua International Mines Group — Merger or Acquisition (August 2022)
10 slides from FTI Consulting's merger presentation, Aug 23, 2022
Slide 1: Opportunity to Acquire the Wapiti Project or Investment in Canadian Dehua International Mines Group Inc.
Opportunity to Acquire the Wapiti Project or Investment in Canadian Dehua International Mines Groups Inc. August 23, 2022
Slide 2: Overview/Background
Overview/Background Opportunity Overview: ■ Canadian Dehua International Mines Group Inc. (“CDI” or “the Company”) is seeking interested parties for: — An investment in CDI; or — The acquisition of CDI’s interest in the Wapiti Project. Background: ■ CDI was incorporated in British Columbia on Decemb
Slide 3: CDI Mining Projects
CDI Mining Projects Projects Ownership Location/Description Description of CAPEX Status of mine NI43-101 Technical Report; Detailed Geological Report; Pre-feasibility Study Report; 39 boreholes drilled; Estimate of $1.2 billion to build out mine and commence production CDI owns 100% of Wapiti 7,773
Slide 4: The Wapiti Project
The Wapiti Project Through its subsidiary Wapiti, CDI is selling its interest in the Wapiti Coalfield. Geography: ■ Wapiti Coalfield is located in the northeastern part of BC, Canada. It is 1,028.7 kilometers westward to Prince Rupert Port by railway, of which 982 kilometers are already fully operat
Slide 5: The Wapiti Project
The Wapiti Project Geological Exploration: ■ From June 2012 to April 2013, CDI Company carried out the detailed geological exploration of the first well field. Geological drilling and logging were completed. More than 11,000 boxes of coal cores were preserved on site. The hydraulic test of the water
Slide 6: The Wapiti Project – Cont'd. Mine Design
The Wapiti Project – Cont’d. Mine Design Disclaimer: The following information has been derived from a feasibility study completed by Beijing Huayu Engineering Co. Ltd. ■ The mine is developed with inclined shafts (two inclined shafts) according to the — Main Inclined Shaft (Belt Inclined Shaft): ○
Slide 7: Mine Construction Procedures
The Wapiti Project – Proposed Construction Plan Mine Construction and Construction Commissioning Procedures 24 months 24 to 36 months Notes: ■ Mine construction procedures include the construction of supporting facilities such as special railway lines. ■ Based on current estimates, the project is ex
Slide 8: Process Timeline
Process Timeline Actions Date Distribution of Asset Teaser August 23, 2022 NDAs Provided August 23, 2022 Access to the Data Room August 23, 2022 to November 17, 2022 Deadline for Non-binding Letters of Interest* November 18, 2022 * Following the deadline for Non-binding Letters of Interest, CDI will
Slide 9: Drill Samples
Drill Samples 9
Slide 10: Boxed Drill Samples
Boxed Drill Samples 10