Upside Gold Corp · CSE:UG

Upside Gold — Investor Presentation (January 2026)

23 slides from Upside Gold's investor presentation, January 2026

  1. Slide 1: The Kena Project: Shaping Tomorrow with Gold and Copper Resources

    THE KENA PROJECT: SHAPING TOMORROW WITH GOLD AND COPPER RESOURCES Q1 2026| CSE:UG

  2. Slide 2: Notice to Reader

    Notice to Reader Certain information set forth in this presentation contains “forward-looking information”, including “future oriented financial information” and “financial outlook”, under applicable securities laws (collectively referred to herein as forward-looking statements). Except for statemen

  3. Slide 3: Kena Gold-Copper Project Highlights

    Kena Gold-Copper Project Project Highlights Kena Gold-Copper Project - Located in BC, Canada; Tier-1 Mining Jurisdiction Kena consists of two deposit types telescoped into a major open hydrothermal mineralized system Highly productive gold district with historic producers Access to World Class Infra

  4. Slide 4: Kena Gold-Copper Project

    Kena Gold-Copper Project Located in low-cost area of B.C. Large Land Package 10,114.8 hectares 198 mineral claims Mineral claims are good until 2027-2028 Located 7km south of Nelson and 400km east of Vancouver Paved highway, logging roads and cut-blocks throughout the property Nearby rail, gas lines

  5. Slide 5: Unique Geological Setting

    Unique Geological Setting Over 4 million oz of Gold produced from this belt Kootenay “Golden Arc” Volcanic Belt Contains The Greatest Concentration of Past Producers, Prospects and Occurrences in BC Outside The Golden Triangle Hosted in Jurassic Age Volcanic and Intrusive Rocks Highly prospective, 9

  6. Slide 6: Productive Gold Mining Jurisdiction

    Productive Gold Mining Jurisdiction Project Highlights Nearby recently permitted Kenville Mine and junior mining historic and recent exploration projects Comparative projects (similar deposit types) in proximity: Imperial Metals Mt Poly Au-Cu-Ag Reserves 54MT at 0.32g/t Au, 0.34% Cu and 0.9g/t Ag Ne

  7. Slide 7: Historical Resource Estimate

    Historical* Resource Estimate Originally reported in 2021 as Mineral Resource Estimate 43-101 Compliant Technical Report Price of gold $2,000 Class Cut-off Au (g/t) Tonnes (k) Au (g/t) Au Metal (Koz) 2,773,100 ounces of gold in the inferred category 0.1 44006 0.449 635 0.15 41895 0.465 625.7 0.2 376

  8. Slide 8: Kena Project Gold & Copper Geochemistry

    Kena Project Gold & Copper Geochemistry Pink shows highest gold values Pink shows highest copper values Significant untested, under-explored targets remain outside of historical resource 3 km long Kena copper zone – only limited exploration to date These are high priority targets for potential resou

  9. Slide 9: Kena Project Gold & Copper Historic Production

    Kena Project Gold & Copper Historic Production Athabasca Mine* 20,000 tonnes 31.2 g/t Au, 10 g/t Ag Euphrates Mine* 307 tonnes 46.9 g/t Au, 249 g/t Ag Great Western* 34 tonnes 52.2 g/t Au Gold Cup Mine* 24 tonnes 51.8 g/t gold Starlight* 20 21 tonnes KM 27.7 g/t Au Daylight* 327 tonnes 27 g/t Au, 15

  10. Slide 10: Resampling of Existing Drill Core from Kena Gold Zone

    Resampling of Existing Drill Core from Kena Gold Zone Demonstrated Bulk Tonnage (open-pit) Style Gold Mineralization HOLE WIDTH Au (g/t) Property staked in 1970’s P74-2 79.25 0.74 including 15.24 1.43 Targeted gold vein style mineralization within P74-3 71.63 0.49 volcanic rocks at the Kena Gold Zon

  11. Slide 11: Discovery Trenches Gold Mountain Zone

    Discovery Trenches Gold Mountain Zone Significant Chip Sampling Results Along and Across Strike led to Significant Drill Campaigns Chip samples: 182 metres averaging 1.43 g/t gold PG 011

  12. Slide 12: Gold Mountain Zone

    Gold Mountain Zone Wide Intervals of Bulk Tonnage Style Gold Values Hole # From (m) To (m) Width (m) Gold (g/t) Significant coincident geochemistry, geophysical and trench 01GM-01 14.00 114.00 100.00 1.21 01GM-02 2.65 109.00 106.35 1.08 results led to a robust drill campaign at Gold Mountain Zone 01

  13. Slide 13: 2021 Drill Campaign

    2021 Drill Campaign Wide Intervals of Bulk Tonnage Style Gold Values – Kena Copper Zone Hole # From To Width Cu (%) Au (g/t) Ag (g/t) CuEq* (m) (m) (m) (%) KC21-01 including 37.70 58.00 20.30 0.24 0.11 0.8 0.32 KC21-02 including 37.40 39.29 1.89 0.11 0.81 1.4 0.61 and 53.55 56.00 2.45 0.31 0.49 3.5

  14. Slide 14: 2021 Drill Campaign: Great Western & Starlight Zones

    2021 Drill Campaign Great Western & Starlight Zones Great Western Zone Starlight Zone HOLE FROM (m) TO (m) WIDTH* (m) GOLD (g/t) HOLE FROM TO (m) WIDTH Au (g/t) Ag (g/t) Cu (%) Cu Eq* (m) (m) (%) DL21-01 46.84 49.50 2.66 6.55 DL21-13 30.33 31.00 0.67 6.36 3.1 including 46.84 47.40 0.56 12.60 33.83 3

  15. Slide 15: Gold Mountain: 3D Section

    Gold Mountain: 3D Section Gold hosted in multiple structures – demonstrates potential along and across strike Resource Area Gold Mountain Cross Section PG 015

  16. Slide 16: Metallurgy

    Metallurgy 2022 Bulk Samples Demonstrate Strong Recoveries of Gold up to 95.6% Response to Different Process Routes at 75 µm Composite Composite Whole-ore Cyanidation 85.5% 93.9% Flotation 88.7% 90.5% Response to Different Process Routes at 75 µm Gravity + Cyanidation 81.4% 95.6% Gravity + Flotation

  17. Slide 17: Magnetic Survey

    Magnetic Survey Resource Outline: Recent Drilling at Kena Copper Zone, Great Western & Starlight Deep seated structure Trending “Break” structure similar to prospective Greenstone Belt hosted gold systems Magnetite destructive solutions brough gold into the host rock hydrothermal solutions brought g

  18. Slide 18: Next Steps

    Next Steps Kena Project Update to 43-101 Resource Estimate Complete program of re-sampling / additional sampling of historic drill core Expansion and Upgrade of the Gold Resource with Emphasis on 2026 Drill Program -Evaluate High Grade Gold Structures the Large Copper Halo and the Kena Copper Zone s

  19. Slide 19: Image Gallery 2025 Drilling Campaign

    Image Gallery 2025 Drilling Campaign PG 019

  20. Slide 20: CAP Structure

    CAP Structure Capitalization Option Agreement Shares % Kena Project under Option to Acquire 100% Common Shares 51,357,000 70.47% Payment Structure: Basic Shares Outstanding 51,357,000 70.47% C$400,000 initial payment C$2,000,000 cash; and, C$3,000,0000* in common shares of Options 5,125,700 7.03% Up

  21. Slide 21: Executive Management Team & Board

    Executive Management Team & Board Proven Track Record in Exploration and Resource Development Sophy Cesar Dr. Trevor Boyd Roger Jewett CEO & Director VP Exploration CFO 15+ years of senior exec experience in junior resource sector on Ph.D, P.Geo CPA, CA Over 30 years experience leading public and pr

  22. Slide 22: Kena Project Contact Us

    Kena Project Contact Us Get In Touch Online upsidegoldcorp.com Phone 514-641-6897 Email [email protected] CSE:UG PG 022

  23. Slide 23: Thank You

    THANK YOU THE KENA PROJECT: SHAPING TOMORROW WITH GOLD AND COPPER RESOURCES upsidegoldcorp.com

Upside Gold — Investor Presentation (January 2026) on 6ix