Tellurian — Investor Presentation (April 2019)

26 slides from Tellurian's investor presentation, Apr 18, 2019

  1. Slide 1: 2

    2

  2. Slide 2: Key investment highlights

    Key investment highlights 3 Management track record at Cheniere and BG Group 46% of Tellurian owned by founders, management and other employees(1) Guaranteed lump sum turnkey contract with Bechtel $15.2 billion for 27.6 mtpa capacity Integrated Upstream reserves Pipeline network LNG terminal Low-cos

  3. Slide 3: Looming challenge of U.S. gas oversupply

    +7 +4 +7 +1 +3 Looming challenge of U.S. gas oversupply 4 U.S. natural gas must be exported Sources: DrillingInfo, EIA, Tellurian analysis. Note: (1) Assumes $70/bbl oil price and $3/mmBtu Henry Hub price; incremental supply comes from Permian, Scoop/Stack, Haynesville, Eagle Ford, and Appalachia. (

  4. Slide 4: Global LNG capacity call: ~100-250 mtpa

    Global LNG capacity call: ~100-250 mtpa Sources: Wood Mackenzie, Tellurian Research. Notes: (1) Assumes 85% utilization rate. (2) Assuming sustained 2015-2018 demand growth rate of ~9.3% p.a. post-2019. (3) Conservative estimate of 5.0% p.a. demand growth rate post-2019. 5 Under construction In oper

  5. Slide 5: Integrated model: Production Company, Pipeline Network, LNG Terminal

    Integrated model Production Company, Pipeline Network, LNG Terminal Variable and operating costs expected to be $2.50-$3.00/mmBtu FOB Financing ~$7 billion in Partners’ capital through investment of $500 per tonne of LNG $1 billion in private equity funding for Tellurian’s equity investment ~$20 bil

  6. Slide 6: Driftwood Holdings' financing

    Driftwood Holdings’ financing 7 Notes: (1) Based on engineering, procurement, and construction agreements executed with Bechtel. (2) Approximately half of owners’ costs represent contingency; the remaining amounts consist of cost estimates related to staffing prior to commissioning, estimated impact

  7. Slide 7: Growing list of expected partners and customers

    Growing list of expected partners and customers 8 Potential partner Proposed off-take Proposed volume Credit rating(1) Driftwood project Equity investor 1.0 mtpa A+/Aa3/AA- Equity investor Under review Baa2 (Moody’s) Tellurian Marketing JKM linked 1.5 mtpa A+/Aa3/AA- JKM linked (Equity investment un

  8. Slide 8: Commercial momentum to 3-plant FID

    Commercial momentum to 3-plant FID Notes: (1) Represents required equity contribution at $500/tonne. (2) Based on signed Heads of Agreement (HOA). (3) Based on signed Memorandum of Understanding (MOU) with volume to be determined. (4) Based on signed MOU. 9 mtpa mtpa (2) (2) (4) Driftwood Holdings v

  9. Slide 9: Steps towards final investment decision

    Steps towards final investment decision 10 Project design Regulatory Negotiate agreements Final contracts Debt/project finance terms Final investment decision 2H18-1H19E 2Q19-4Q19 • FEED studies • EPC • Equipment selection • Secure permits and certificates • Non-binding agreements, including governa

  10. Slide 10: Value to Tellurian Inc.

    USGC netback ($/mmBtu) Cost of LNG(1) ($/mmBtu) Margin ($/mmBtu) 2 Plants 3 Plants 5 Plants Cash flows(2)(3)(4) $ millions ($ per share) Tellurian capacity 5.0 mtpa 6.6 mtpa 13.6 mtpa $ 6.00 $4.50 $ 1.50 $190 ($0.71) $320 ($1.20) $870 ($3.26) $ 8.00 $4.50 $ 3.50 $710 ($2.66) $1,010 ($3.79) $2,280 ($

  11. Slide 11: Driftwood Holdings' operating costs

    Driftwood Holdings’ operating costs Sources: Wood Mackenzie, Tellurian Research. Notes: (1) Based on debt service cost of principal and interest related to ~$20.0 billion of project finance debt. 12 (1) Debt Drilling & completion Operating Gathering, processing & transportation Contingency Liquefact

  12. Slide 12: Final Investment Decision expected in 2019

    Final Investment Decision expected in 2019 13 Fully-wrapped EPC contract Draft FERC EIS Final FERC EIS Final FERC Order Complete capital raise process Partner & equity funding Debt syndication Final Investment Decision Notice to Proceed to Bechtel First LNG Milestone Target date November 2017 Septem

  13. Slide 13: Contact us

    Social media Contact us Amit Marwaha Director, Investor Relations & Finance +1 832 485 2004 [email protected] Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 [email protected] 14 @TellurianLNG

  14. Slide 14: Contact us

    Contact us = Amit Marwaha Director, Investor Relations & Finance +1 832 485 2004 [email protected] = Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 [email protected] Social media yw @TellurianLNG 3 \oulube in)

  15. Slide 15: Owning infrastructure mitigates risk

    Owning infrastructure mitigates risk 16 Tolling model SPA model Equity model Customer incurs risk Competition between customers for pipeline access leads to hidden costs and higher cost of LNG on the water Developer incurs risk Developer consolidates pipeline transport, but still a price taker for t

  16. Slide 16: Integrated to manage three risks

    Basin 10,800 Haynesville acres 1.4 Tcf of resource Intend to acquire 15 Tcf Basis ~$7 billion of pipeline projects, providing access to Haynesville, Permian, & Appalachia supply Integrated to manage three risks 17 Construction ~$15 billion liquefaction project in Louisiana

  17. Slide 17: Driftwood LNG terminal

    Driftwood LNG terminal Note: (1) Based on engineering, procurement, and construction agreements executed with Bechtel. 18 Driftwood LNG terminal Land ~1,000 acres near Lake Charles, LA Capacity ~27.6 mtpa Trains Up to 20 trains of ~1.38 mtpa each Chart heat exchangers GE LM6000 PF+ compressors Stora

  18. Slide 18: Bechtel LSTK secures project execution

    Phase 1 Phase 2 Phase 3 Phase 4 Total Bechtel LSTK secures project execution Leading LNG EPC contractor 44 LNG trains delivered to 18 customers in 9 countries ~30% of global LNG liquefaction capacity (>125 mtpa) Tellurian and Bechtel relationship 16 trains(1) delivered with Tellurian’s executive tea

  19. Slide 19: Construction budget breakdown

    Construction budget breakdown Notes: Based on Driftwood LNG full development. (1) Includes additional contingency by developer and staffing prior to commencement of operations. (2) Provisional sum includes escalation factor for inflation, insurance, foreign exchange, and other costs. 20 24% 24% 24%

  20. Slide 20: Pipeline network

    Pipeline network 21 Driftwood Pipeline(1) Capacity (Bcf/d) 4.0 Cost ($ billions) $2.2 Length (miles) 96 Diameter (inches) 48 Compression (HP) 274,000 Status FERC approval pending Haynesville Global Access Pipeline(1) Capacity (Bcf/d) 2.0 Cost ($ billions) $1.4 Length (miles) 200 Diameter (inches) 42

  21. Slide 21: Integrated to capture market dislocations

    Integrated to capture market dislocations 22 Source: RBN; Tellurian analysis. 2023 discount from HH 2023 HH forecast midpoint price; $2.25-$3.00 expected range Legend $2.65 Henry Hub Gulf Coast Upper Midwest Appalachia -17% $2.65 E. TX/LA Waha $/mmBtu -24% -15% -8% -24% -24% By 2023, Henry Hub is fo

  22. Slide 22: >100 Tcf available resources in Haynesville

    >100 Tcf available resources in Haynesville Sources: IHS Enerdeq; 1Derrick; investor presentations; Tellurian research. Note: (1) Estimated resources based on acreage. 23 Driftwood Holdings plans to fund and purchase 15 Tcf Potential acquisition targets: Range of resources per target (Tcf)(1): Targe

  23. Slide 23: Project advancement

    Project advancement Common stock purchase agreement with Total Heads of Agreement (“HOA”) with Total Tellurian signs agreements with Total Total Delaware, Inc. (“Total”) signs HOA to make $500 million equity investment in Driftwood project and for Total to purchase 1 mtpa of LNG Total to purchase 1.

  24. Slide 24: Returns to Driftwood Holdings' partners

    Returns to Driftwood Holdings’ partners 25 U.S. Gulf Coast netback price ($/mmBtu) $6.00 $8.00 $10.00 $15.00 Driftwood LNG, FOB U.S. Gulf Coast ($/mmBtu) $(3.50) $(3.50) $(3.50) $(3.50) Margin ($/mmBtu) 2.50 4.50 6.50 11.50 Annual partner cash flow(1) ($ millions per tonne) 130 235 340 600 Cash on c

  25. Slide 25: Building momentum to FID in 2019

    Building momentum to FID in 2019 26 June Raise approximately $115 million in public equity March Bechtel invests $50 million in Tellurian Feb/March Announce open seasons for Haynesville Global Access Pipeline and Permian Global Access Pipeline December Raise approximately $100 million in public equi

  26. Slide 26: Building momentum to FID in 2019

    Building momentum fo FID in 2019 9 April February December Feb/March June iY) Management,| Merge with Raise Announce Raise Receive FERC Announce friends and Magellan approximately open seasons approximately final MOU for family invest Petroleum, $100 million in for Haynesville $115 million in Enviro