Dome Gold Mines Ltd. · ASX:DME

Dome Gold Mines — Investor Presentation (November 2012)

20 slides from Dome Gold Mines's investor presentation, November 2012

  1. Slide 1: Dome Gold Mines Limited

    DOME GOLD MINES LIMITED GOLD-COPPER-MAGNETITE IRON IN FIJI Slide 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Dome Gold Mines Ltd (“Dome Gold”) (“Presentation”). This Presentation is being provided by Dome Gold to parties (Recipients) for use by Recipients in evaluating and determining whether to proceed with a further investigation of a prospective investme

  3. Slide 3: Company Overview

    Company Overview Dome Gold Mines… • Is an emerging exploration company with gold, copper and iron ore mineralisation in Fiji • Has a flagship project which is moving rapidly towards feasibility and production • Holds 48,113ha of very prospective land in three tenements • Has an experienced, highly q

  4. Slide 4: The People

    The People Experienced Board Chairman Director Director Director Company Sec. Garry Lowder Tadao Tsubata Andrew Skinner Allen Jay Marcelo Mora Geologist Investment Mngt. Chartered Acc. Geologist Accountant Exploration Management Team John McCarthy Suliano Niurou Consulting Geologist Senior Geologist

  5. Slide 5: Benefits of Fiji

    Benefits of Fiji • Mining friendly government and culture • Well mineralised region • Local examples for all our targets • Corporate Tax Rate is 20% • High level local expertise - Suliana Niurou: Highly experienced exploration geologist and former senior economic geologist, Mines Dept in Fiji • Dome

  6. Slide 6: Exploration & Corporate History

    Exploration & Corporate History • 1960s – 1980s: Exploration by Anglo, Placer, Amoco et al • Anomalies identified and some drilling targets (Ono, Wainivau and Nakoro) • October 2007: Current tenements granted to Dome Mines (Fiji company) • 2008: Data compilation and initial field mapping – presence

  7. Slide 7: The Projects

    The Projects Three wholly owned projects with distinct target models, each with local examples Nasivi Delta Project Commodities: Gold and iron ore Status: Resource drilling Target: Near term production Example: Mba Delta Central Viti Levu Project Commodities: Copper and Gold Status: Exploration Targ

  8. Slide 8: Nasivi Delta Project

    NASIVI DELTA PROJECT NASIVI DELTA Making Dome a mining company • Flagship project – large alluvial mineralisation • Located down-stream from Emperor Gold Mine at Vatukoula • Contains gold mineralisation and abundant magnetite mineralisation (iron ore) sand • Resource drilling underway • Should gener

  9. Slide 9: Nasivi Delta Project

    NASIVI DELTA PROJECT Part of the Nasivi Delta, showing sand flats Slide 9

  10. Slide 10: Nasivi Delta Project

    NASIVI DELTA PROJECT Nasivi Delta, looking south Slide 10

  11. Slide 11: Nasivi Delta Project

    NASIVI DELTA PROJECT • Drilling underway • Initial JORC resource by early 2013 • Feasibility study in late 2013 • Analogue of Mba Delta and Sigatoka River • Mba Delta mineralisation = 220Mt @ 10.9% Fe • Mba project held by Amex Resources Ltd [market cap = $70m] Sand flats at Nasivi Slide 11

  12. Slide 12: Nasivi Delta Project

    NASIVI DELTA PROJECT Magnetite sand at Nasivi Delta MMI gold geochemistry at Nasivi Delta Slide 12

  13. Slide 13: Nasivi Delta Project

    NASIVI DELTA PROJECT • Sonic drill is a major technological advance • Drilling to commence soon after listing - Will produce high quality samples - Low cost and fast - Key to establishing a JORC resource Sonic drill rig that is being used by Dome at Nasivi Delta Soft sediment “core” being extruded f

  14. Slide 14: Kadavu Islands Project

    KADAVU ISLANDS PROJECT KADAVU Targeting discovery of Emperor-like high grade gold deposit • Prime targets are epithermal gold-silver mineralisation • Geological setting very analogous with Emperor Gold Mine at Vatukoula • Also has porphyry copper-gold potential • Good access with promising drill tar

  15. Slide 15: Kadavu Islands Project

    KADAVU ISLANDS PROJECT Gasele Prospect Ono Prospect Slide 15

  16. Slide 16: Central Viti Levu Project

    CENTRAL VITI LEVU PROJECT Nakoro Wainivau SPL 1452 – CENTRAL VITI LEVU Prospect Prospect Giving Dome world class discovery potential • 42,000 ha located just north of giant Namosi porphyry copper mineralisation (Newcrest) • Two main intrusive centres with porphyry style features • Strongly encouragi

  17. Slide 17: Central Viti Levu Project

    CENTRAL VITI LEVU PROJECT Wainivau Prospect Copper Gold MMI soil geochemistry Slide 17

  18. Slide 18: Why Invest in Dome?

    Why Invest in Dome? • Strong geographic and commodity focus • Fiji is mining friendly, with an attractive investment environment • Dome has high quality geological, exploration and business expertise in Fiji • Balanced portfolio comprising well defined targets, all with local analogues • Business st

  19. Slide 19: Competent Person Statement

    Competent Person Statement Competent Person: The contents of this presentation that relate to geology and exploration results are based on information compiled by consulting geologist John V McCarthy, who is a Member of the Australian Institute of Mining and Metallurgy. He has sufficient experience

  20. Slide 20: Contacts

    Contacts Dome Gold Mines Limited ABN 49 151 996 566 Level 7, 71 Macquarie Street Sydney NSW 2000 Australia GPO Box 1759 Sydney NSW 2001 Australia Investor Inquiries Garry Lowder, Chairman E [email protected] T +61 2 8203 5620 M +61 417 212 099 Andrew Skinner, Director E andrew@domegoldmin

Dome Gold Mines — Investor Presentation (November 2012) on 6ix