  1. Slide 1: Tellurian Inc. Corporate presentation August 2021

    Tellurian Inc. August 2021 Corporate presentation

  2. Slide 2: Cautionary statements

    Cautionary statements The information in this presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than statements of historical fact ar

  3. Slide 3: LNG critical to global decarbonization

    LNG critical to global decarbonization Source: BP Statistical Review, BP World Energy Outlook, Wood Mackenzie. Note: (1) Tellurian’s integrated approach creates physical hedge for Driftwood’s natural gas purchases. Global markets structurally short LNG; abundant low- cost U.S. natural gas supply Tel

  4. Slide 4: The integrated Tellurian model is the next innovation in U.S. LNG

    The integrated Tellurian model is the next innovation in U.S. LNG

  5. Slide 5: Tellurian executive summary

    Tellurian executive summary 5 Tellurian has sold all the necessary offtake for Driftwood Phase I (two-plants/11 mtpa)(1) .. Definitive, binding agreements with Gunvor, Vitol and Shell for 9.0 mtpa .. The addition of Shell brings the world’s largest LNG portfolio and the largest buyer of U.S. LNG int

  6. Slide 6: Tellurian: fully integrated, pure-play LNG

    Houston Gillis Haynesville Gas production Driftwood LNG Driftwood Pipeline Tellurian: fully integrated, pure-play LNG 6 Low-cost, integrated business model: upstream gas production in Haynesville(1), Driftwood pipeline and LNG terminal in SW Louisiana Pure-play, global gas producer: monetizing U.S.

  7. Slide 7: Driftwood LNG Phase I: sold out

    3 11 3 3 2 Total capacity 2 plants Credit rating Unrated Investment grade A+/Aa2 7 carried volumes mtpa Phase I Driftwood LNG: sold out

  8. Slide 8: Preparing Driftwood LNG site for construction

    Preparing Driftwood LNG site for construction Exercised long-term lease option with Port of Lake Charles in June 2021 – 20-year term lease agreement with extension options of up to 50 years Mobilized early construction activities in July 2021 – Commenced owner’s projects required in advance of provi

  9. Slide 9: Driftwood LNG Phase I (2-plant, ~11 mtpa)

    Driftwood LNG Phase I (2-plant, ~11 mtpa) Notes: (1) Owner’s cost for Driftwood LNG terminal construction. (2) Includes first phase of Driftwood pipeline system. (3) Other includes pre-FID development costs and G&A during construction. 9 2-plant development costs ($ bn) Driftwood LNG terminal $7.8 E

  10. Slide 10: Illustrative Phase I cash flows at JKM strip

    Illustrative Phase I cash flows at JKM strip Source: Bloomberg .. Note: (1) 12-month JKM strip price of $13.28 as of 7/30/21 less $1.75 for transportation. (2) Cash on cash returns before debt service and federal income tax; inclusive of phase I development cost including financing costs. 10 Market

  11. Slide 11: Upstream and banks to fund Phase I

    Upstream and banks to fund Phase I Illustrative funding structure 11 Steps to NTP .. Acquire upstream resources Estimated total 5-10 tcf of resource funded by mix of cash, debt and equity Phase 1 Sources and Uses Bank financing Year 1 $2 bn. Year 2 $2 bn. Year 3 $2 bn. $0.9 bn. $1.2 bn $1.2 bn Tellu

  12. Slide 12: Haynesville Basin: primed for consolidation

    Driftwood LNG Phase I feedgas requires ~2% of total resource and ~13% of current production from Haynesville Public / Public Entities Private World-class resource base, with estimated ~304 TCF of natural gas resource in place Resurgence in activity and productivity since 2017 – Production increased

  13. Slide 13: Low-cost U.S. supply provides global gas arbitrage

    Low-cost U.S. supply provides global gas arbitrage 13 Access to premium global gas market generates up to $9/mmBtu margin at current forward prices 4% 2% 4% 10-year LNG demand growth forecast JKM (Asia benchmark) 1-yr forward price: $13.28/mmBtu TTF (European benchmark) 1-yr forward price: $11.72/mm

  14. Slide 14: Carbon prices supporting EU gas prices

    $- $2 $4 $6 $8 $10 $12 $14 $16 Apr-16 Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20 Aug-20 Oct-20 Dec-20 Feb-21 Apr-21 Jun-21 Aug-21 Oct-21 Dec-21 Heat Rate Adj. Coal Impl

  15. Slide 15: Tellurian management: U.S. LNG pioneers

    Tellurian management: U.S. LNG pioneers 15 Tellurian management team responsible for developing ~75% of current U.S. LNG capacity Tolling model SPA model Integrated model Pricing innovators Tellurian management Tellurian management Tellurian management Pricing structure Fixed fee Henry Hub plus fixe

  16. Slide 16: FID expected in 1Q22

    FID expected in 1Q22 16 Project milestones Status EPC & Regulatory Fully wrapped, lump-sum turnkey contract; all major permits secured SPAs 9 mtpa secured for Phase I, no additional SPAs required for Phase I Upstream Process underway to acquire 5-10 tcf of resource. Financing Discussions with bank g

  17. Slide 17: Contact us

    Contact us .. Matt Phillips VP, Investor Relations & Finance +1 832 320 9331 [email protected] .. Joi Lecznar EVP, Public & Government Affairs +1 832 962 4044 [email protected] 17 .. Johan Yokay Director, Investor Relations & Finance +1 832 320 9327 johan.yokay@tellurianin

  18. Slide 18: Low-cost U.S. natural gas critical in supplying global LNG demand growth

    Low-cost U.S. natural gas critical in supplying global LNG demand growth

  19. Slide 19: Gas and LNG fastest growing fuels

    Gas and LNG fastest growing fuels 1.2% 1.4% -0.1% 2.7% 3.0% 1.6% 6.9% 7.1% 3.6% 20 YR Hist. Avg. 10 YR Hist. Avg. 10 YR Forecast Annual increase in oil, gas and LNG consumption Oil Gas LNG .. Gas demand is growing at 2x the rate of crude demand growth .. LNG demand is growing at 5x the rate of crude

  20. Slide 20: Structural factors driving LNG demand

    Structural factors driving LNG demand Source: Platts and ICE via MarketView, SIA, IEA Electricity Market Report 2020, Kpler. 20 Region YTD growth Comments China +24% Improved gas infrastructure penetration increases demand. Increased industrial demand from economic recovery & heating demand from con

  21. Slide 21: Asian LNG demand up 11% this year

    Asian LNG demand up 11% this year China/JKT (Japan-Korea-Taiwan) LNG imports up 24%/9%, respectively, through July and Indian imports fell due to higher spot prices 21 Source: Kpler. Chinese LNG imports Indian LNG imports million tonnes/month million tonnes/month JKT LNG imports million tonnes/month

  22. Slide 22: Forward natural gas prices rise globally

    Forward natural gas prices rise globally Asian LNG – JKM forward curve European natural gas – TTF forward curve 22 $/mmBtu $/mmBtu Source: NYMEX and ICE via MarketView. 2-year forward price +83% since July 2020 2-year forward price +100% since July 2020

  23. Slide 23: Lack of LNG investment = widening price

    Lack of LNG investment = widening price Source: Wood Mackenzie, Tellurian analysis. Note: (1) Capacity additions for projects that have reached FID only. 23 13 4 (0) 5 8 27 30 27 40 23 10 7 14 7 18 36 5 (3) -- (9) 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2

  24. Slide 24: New LNG capacity required

    New LNG capacity required Source: IHS, Wood Mackenzie, BP World Energy Outlook Rapid Transition Scenario. Notes: (1) Growth rate from base year 2020. (2) Assumes growth rate since 2020 and 85.5% utilization rate of new capacity (based on average utilization from 2015-2019). 24 Range of third-party d

  25. Slide 25: LNG critical to global decarbonization

    LNG critical to global decarbonization

  26. Slide 26: Net zero targets favor natural gas

    Indicates formal announcement to reach net-zero emissions by 2060 or earlier Net zero targets favor natural gas 26 ~80% of global LNG demand represented below: • Pledged net-zero by 2060, with peak emissions prior to 2030 • Pledged net-zero by 2050 with targeted coal phase out during the 2030s • Ple

  27. Slide 27: Carbon reduction: the U.S. template works

    Carbon reduction: the U.S. template works 27 US power industry has avoided 800mtpa of CO2 in US Source: EIA Monthly Energy Review, March 2021. Coal Gas/LNG 567mm tonnes CO2 335mm tonnes CO2 Equivalent to: Spain France Thailand 232mm tonnes CO2 59% reduction US LNG exports avoid 335mtpa of CO2 global

  28. Slide 28: Carbon reduction is exportable

    Carbon reduction is exportable Source: Tellurian analysis. Note: (1) BP Statistical Review in World Energy 2020. (2) EIA State CO2 Emissions report 2020. 28 US LNG displaces significant CO2 versus coal power equivalent • 26 mmt CO2 emissions avoided • Equivalent to Norway, Switzerland total CO2 emis

  29. Slide 29: Air quality improvements with LNG imports

    Air quality improvements with LNG imports Natural gas produces 64% less air particulate matter than does coal and 73% less than does wood biomass .. Improving air quality is a vital initiative for industrializing nations ― 2.9 mm premature deaths in China and India attributable to air pollution(1) ―

  30. Slide 30: China decarbonization requires natural gas

    China decarbonization requires natural gas Even with 2 major Russian pipelines and growing domestic output, LNG imports could reach over 200 mtpa .. Targeting net-zero emissions by 2060 .. Pledged to reach peak emissions prior to 2030 .. Natural gas is required to reduce emissions while accommodatin

  31. Slide 31: Integration delivers climate advantages

    Upstream Driftwood pipeline Driftwood LNG Use “green completion” technology to eliminate flaring and minimize methane leakage Perform LDAR surveys utilizing optical gas imaging to allow identification and repair of leaks Use the latest equipment, technology and monitoring systems that have been engi

  32. Slide 32: Appendix: Driftwood LNG details

    Appendix: Driftwood LNG details

  33. Slide 33: Driftwood LNG's ideal site for exports

    Driftwood LNG’s ideal site for exports 33 Access to power and water Berth over 45’ depth with access to high seas Support from local communities Access to pipeline infrastructure Site size over 1,000 acres Insulation from surge, wind and local populations Artist rendition Fully permitted 30% enginee

  34. Slide 34: Unmatched LNG development experience

    Unmatched LNG development experience Tellurian’s management team has >80 years of combined LNG development experience globally 34 Charif Souki Executive Chairman of the Board Co-founder of Tellurian Founded Cheniere in 1996, Chairman and CEO until 2015 Martin Houston Vice Chairman Co-founder of Tell

  35. Slide 35: Bechtel LSTK secures project execution

    $700 $490 $500 $380 ~$550 $710 $500 $510 $390 ~$560 Stage 1 Stage 2 Stage 3 Stage 4 Total Bechtel LSTK secures project execution Leading LNG EPC contractor ― 44 LNG trains delivered to 18 customers in 9 countries ― ~30% of global LNG liquefaction capacity (>125 mtpa) Tellurian and Bechtel relationsh

  36. Slide 36: Tellurian Phase I unlevered return scenarios

    JKM index price ($/mmBtu) $8.00 $10.00 $12.00 $14.00 Gas production & liquefaction opex ($/mmBtu) $(3.00) $(3.00) $(3.00) $(3.00) Margin ($/mmBtu) $3.25 $5.25 $7.25 $9.25 Annual cash flow(1) ($ millions) $1,859 $3,003 $4,147 $5,291 Unlevered IRR(2) 16% 25% 35% 44% Payback(3) (years) 6 4 3 2 Telluria