Company news
Fury Gold Mines Limited news in 2026
Fury Gold Mines Limited's news releases, calls and decks from 2026, newest first.
Fury Gold Mines Intersects 3.88 g/t Gold over 17.8 Metres, including 18.78 g/t Au over 3.30 m, at Three Bluffs, Returning Wide Mineralized Intervals in All Five Holes
November 3, 2026
Fury Intersects 14.95 g/t Gold over 4.25 Metres at Eau Claire, Extending High-Grade Mineralization 60 Metres Up-Dip
October 26, 2026
Fury Gold Mines Reports Infill Drill Results; Returns High Grade at Eau Claire Including 14.41 g/t over 3.92 Metres
August 24, 2026
Fury Reports Infill Drill Results; Returns High Grade at Eau Claire Including 14.41 g/t over 3.92 Metres
August 25, 2026
Fury Resumes Activities at Eau Claire
July 27, 2026
Fury Gold Mines Provides Update on Precautionary Evacuation of Eau Claire Camp Due to Nearby Wildfire
July 15, 2026
Fury Reports Intercept of 7.0 gt Gold over 21.0 Metres at Eau Claire and Mobilizes Third Drill Rig
July 14, 2026
Fury Reports Intercept of 7.0 g/t Gold over 21.0 Metres at Eau Claire and Mobilizes Third Drill Rig
July 13, 2026
Fury Commences 2026 Drilling Program at Committee Bay in Nunavut
July 7, 2026
Fury Announces Metallurgical Test Results for the Ninaaskumuwin Lithium Discovery with Potential Direct Shipping Ore Concentrate of 6.0% Li2O5 and 77% Recovery
June 23, 2026
Fury Gold Mines Engages Leading Firms to Advance Eau Claire Pre-Feasibility Study Work
June 8, 2026
Fury Reports 7.86 g/t Gold Over 9.43 Metres in Infill Drilling at the Eau Claire Gold Project, Quebec
June 2, 2026
Fury Gold Mines Advances Metallurgical Testwork Program at the Eau Claire Gold Project in Quebec
May 18, 2026
Q1 report for the period ending March 31, 2026 FS
May 15, 2026
Q1 report for the period ending March 31, 2026 MD&A
May 15, 2026
Fury Gold Mines Appoints Senior Director, Environment and Permits
May 11, 2026
Fury Initiates Environmental Baseline Studies at the Eau Claire Gold Project in Quebec
April 28, 2026
Fury Gold Mines Intercepts 12.50 g/t Gold over 7.02 Metres Outside the Eau Claire Block Model
April 22, 2026
Fury Appoints Vice President, Project Development
April 7, 2026
Q4 report for the period ending Dec 31, 2025 FS
April 1, 2026
Q4 report for the period ending Dec 31, 2025 MD&A
April 1, 2026
Q4 report for the period ending Dec 31, 2025 AIF
April 1, 2026
Fury Intercepts 11.74 gt Gold over 6.63 Metres from Infill Drilling at Eau Claire, Commences Phase 2 Drilling
March 18, 2026
Fury Intercepts 11.74 g/t Gold over 6.63 Metres from Infill Drilling at Eau Claire; Commences Phase 2 Drilling
March 17, 2026
Fury Appoints Phillips Baker as an Independent Director
January 26, 2026
Fury Reviews 2025 Achievements and Outlines 2026 Exploration Priorities
January 8, 2026
Decks in 2026
- Investor Presentation (September 2026)
Investor deck · 21 slides · Sep 25, 2026
- Investor Presentation (June 2026)
Investor deck · 30 slides · Jun 1, 2026
- Investor Presentation (April 2026)
Investor deck · 35 slides · Apr 1, 2026
- Investor Presentation (March 2026)
Investor deck · 35 slides · Mar 10, 2026
- Investor Presentation (January 2026)
Investor deck · 34 slides · Jan 21, 2026