Company news

Bayhorse Silver Inc. news in 2025

Bayhorse Silver Inc.'s news releases, calls and decks from 2025, newest first.

View company

Bayhorse Silver Appoints Christos Doulis as President

December 17, 2025

Bayhorse Silver Reports 99 Plus Percent Selective Antimony Leaching Results From The Silver, Copper, Antimony and Zinc Concentrate From Its Bayhorse Silver Mine

December 8, 2025

Bayhorse Silver Undertakes Metallurgical Bulk Sample Of The Critical and Strategic Silver, Copper, Antimony and Zinc Minerals From Its Bayhorse Silver Mine

November 24, 2025

Bayhorse Silver - XRF Analysis of Bayhorse Silver Mine Flotation Concentrate Samples Shows Significant Contained Silver/Copper/Antimony/Zinc

October 20, 2025

Bayhorse Silver Submits Silver/Copper/Antimony Concentrate Samples From Its Bayhorse Silver Mine To Allihies Engineering For Antimony Leach Testing

October 16, 2025

Bayhorse Silver Mobilizes for IP Geophysical Surveys of the Pegasus Porphyry Copper/Silver Prospect and the Bayhorse Silver Mine

October 7, 2025

Bayhorse Appoints Mr. Christos Doulis as Director

October 2, 2025

Bayhorse Silver Installs Its Steinert Ore-Sorter At Its Bayhorse Flotation Mill, Payette, Idaho, USA

September 23, 2025

Bayhorse Silver Closes Its Recently Announced 25 Million Unit Private Placement For Ongoing Work at The Bayhorse Silver Mine and IP Survey On Its Adjacent Pegasus Project, Idaho, USA

September 18, 2025

Bayhorse Silver Renews Silver Concentrate Offtake Agreement with Ocean Partners, Increases Proposed Shipping Volume To 400 Tons

September 2, 2025

Bayhorse Silver Provides Update

August 26, 2025

Bayhorse Silver Extends Known Silver Mineralization At The Bayhorse Silver Mine, Oregon, USA to Over 400m E-W and 563m S-N

August 19, 2025

Bayhorse Silver Assay Returns 0.61% Copper Average from Two Assay Samples over 1.5 M (5ft) Averaging 6100 g/t (0.61% Cu) Base Metals Mineralization at the Bayhorse Silver Mine, Oregon, USA

July 21, 2025

Bayhorse Silver Pegasus Silver/Copper Project IP Survey Parameters

July 9, 2025

Bayhorse Silver Samples, Silver Mineralization Intersection At The Bayhorse Silver Mine, Oregon, USA. With Two Assay Samples From The First 1.5 M (5ft) Averaging 1104 g/t (35.46 opt)

June 17, 2025

Bayhorse Silver Confirms Strike Extensions 150 Meters (492ft) of Silver Mineralization at the Bayhorse Silver Mine, Oregon, USA. Plans Additional Underground Drilling Program to Extend New High Grade Drift Zone. Posts Baseline Permit Studies to Website

June 11, 2025

Bayhorse Silver Commences Drilling At 30M By 40M IP Target Below Historic High Grade Silver Sunshine Stope At The Bayhorse Silver Mine, Oregon, USA

April 14, 2025

Bayhorse Silver Receives Final Bayhorse Silver Mine IP Survey Results, Extends Bayhorse Potential Mineralized Zone To Over 600 M, Identifies First IP Drill Target

March 31, 2025

Bayhorse Silver Reports Anomalous Copper-Zinc Assay Results from the Last 112 m of Drill Hole BH24-01 from 207 m (680ft) Downhole to End of Hole at 318 m (1050 ft)

March 25, 2025

Bayhorse Silver Extends Bayhorse Breccia Zone From 90 M (300ft) Downhole to 318 M (1050 ft) Reports Anomalous Copper-Zinc Assay Results From The First 115 M Of The Breccia Zone, And Preliminary IP Results

March 4, 2025

Bayhorse Silver Submits 115 Meters Of Core Samples For Assay, And Plans Downhole Geophysical Surveys of the Bayhorse Silver Mine

January 16, 2025

Decks in 2025